Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: June 9, 2014 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 541368 | |||||
Mechanical permit Date: July 11, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 415638 | |||||
Electrical permit Date: July 9, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 415233 | |||||
Alteration permit Date: July 5, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 327802 | |||||
Plumbing permit Date: July 9, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 415222 | |||||
Plumbing permit Date: July 9, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 415222 | |||||
Alteration permit Date: July 5, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 327802 | |||||
Mechanical permit Date: July 11, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 415638 | |||||
Electrical permit Date: July 9, 2012 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 415233 | |||||
Alteration permit Date: June 9, 2014 Client: Calhoun Albert Calhoun Barbara | Permit status: Completed | Permit id: 541368 | |||||
SCORE 100 Install 38 light fixtures, 51 recepts, 12 switches, 6 110v smoke detectors, 1 dryer, 1 a c unit as per 2008 nec (sfd) Date: July 9, 2012 Contractor: Prompt Plumbing And Electric Client: Calhoun Albert Calhoun Barbara | Permit type: Electrical permit | Permit status: Completed | Completion date: October 16, 2012 | Permit id: 415233 | |||||
SCORE 100 Install 2 hvac units including ductwork (sfd) 1 unit in basement, 1 unit on 3rd floor. Date: July 11, 2012 Contractor: Rosenberg Neil Client: Calhoun Albert Calhoun Barbara | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 24, 2012 | Permit id: 415638 | |||||
SCORE 93 Rebuild front wall on the existing foundation with 2" x4" wood studs and two wythe if brick. Brick ties required every 4 sq. Ft amd flooe ties required at everk floor level. Door and windows to match original in size and location Date: June 9, 2014 Contractor: Craft Pro Masonry Restor Inc Client: Calhoun Albert Calhoun Barbara | Permit type: Alteration permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 541368 | |||||
SCORE 100 Install 2-wc, 2-lav, 2-bathtubs, 1-kitchen sink, 1-laundry sink (sfd) Date: July 9, 2012 Contractor: Prompt Plumbing And Mechanical Client: Calhoun Albert Calhoun Barbara | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 7, 2012 | Permit id: 415222 | |||||
SCORE 100 Interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit separate permits required for plumging, electric and hvac. Date: July 5, 2012 Contractor: Mei Guan Remodeling Inc Client: Calhoun Albert Calhoun Barbara | Permit type: Alteration permit | Permit status: Completed | Completion date: September 24, 2012 | Permit id: 327802 |