Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 We will be demoing existing restroom including all fixtures and finishes. Demo existing edp and office. Install new fixtures and finished in restroom. New lighting, ceiling tile, gwb, wall tile and polymer flooring. New edp room. Infill existing window with metal panel in conference room and restroom ![]() ![]() Permit id: Bld2016-07279 | |||||
SCORE 88 We will be demoing existing restroom including all fixtures and finishes. Demo existing edp and office. Install new fixtures and finished in restroom. New lighting, ceiling tile, gwb, wall tile and polymer flooring. New edp room. Infill existing window with metal panel in conference room and restroom ![]() ![]() Permit status: Inspections | Permit id: Bld2016-07279 | |||||
SCORE 93 Please pay balance due... Restroom remodel ![]() ![]() Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-10266 | |||||
SCORE 100 Remodel of existing wet fire sprinkler system for the costco office bathroom remodel ![]() ![]() Permit type: Fire | Permit status: In for review | Permit id: Bld2016-10261 | |||||
SCORE 99 Remodel of costco restrooms ![]() ![]() Permit type: Plumbing | Permit id: Bld2016-10503 | |||||
SCORE 99 Furnish and install hvac 1 exhaust system and split system ![]() ![]() Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-10253 |