Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 85 Install new concrete stairs in basement unit, exterior only. Parcel: 14001 0012 | |||||
SCORE 80 Aria marketing - new tenant fit out. No structural work. Plans drawn and stamped by architect, victor vizgaitis. Parcel: 14001 0012 | |||||
SCORE 85 79b chapel - demo and relocate non bearing drywall partitions Parcel: 14001 0012 | |||||
SCORE 100 "akaal animial clinci"_build metal stud partitions, install doors and frames. Parcel: 14001 0012 | |||||
SCORE 80 Room #73_ construct a restroom in an existing storage Parcel: 14001 0012 | |||||
SCORE 80 Teneant fit-up for "barrett technology" Parcel: 14001 0012 | |||||
SCORE 100 Build metal stud partitions for sound control. Parcel: 14001 0012 | |||||
SCORE 100 71b chapel st: install drywall partition, rated door & frame, electrical, fire alarm as needed. Parcel: 14001 0012 | |||||
SCORE 100 Demo walls, build 2 new walls, install vision panel, paint, carpet, electrical as needed. Parcel: 14001 0012 | |||||
SCORE 100 #81b_close two doors, build 2 partitions, install 2 new doors, drywall and plaster for storage area. Parcel: 14001 0012 | |||||
SCORE 100 Build metal stud & drywall partitions to create rental space and 3 offices, electrical as needed. Parcel: 14001 0012 | |||||
SCORE 100 Install temporary ramp, electrical, sprinkler and fire alarm as needed. Parcel: 14001 0012 | |||||
SCORE 100 73 chapel st: create common hallway, install electrical lift Parcel: 14001 0012 | |||||
SCORE 100 Renovate existing office space "health talker" Parcel: 14001 0012 | |||||
SCORE 100 Install new double doors and interior platfor as per plans stamped by architect douglas w. Shoop Parcel: 14001 0012 | |||||
SCORE 96 Build support wall inside of building, working with fire dept. With regards to oil tank. Parcel: 14001 0012 | |||||
SCORE 100 Comstruct second floor roof deck per plans Parcel: 14001 0012 | |||||
SCORE 59 Tenant fit out work, reconfigure interior partions, no exterior work Parcel: 14001 0012 | |||||
SCORE 100 New ada bathroom with shower Parcel: 14001 0012 | |||||
SCORE 59 Interior demo only Parcel: 14001 0012 | |||||
SCORE 100 Remove selected partitions, install new partitions, doors & frames, all work on 2nd flr. Parcel: 14001 0012 | |||||
SCORE 100 Install kitchen, one drywall partition, plumbing and electrical as needed at 73 chapel st Parcel: 14001 0012 | |||||
SCORE 100 Replace suspended ceilings, replace 2 sinks and toilets, install new kitchen cabinets and sink, new flooring, paint, electrical and plumbing as needed Parcel: 14001 0012 | |||||
SCORE 100 Share group replace rear exterior wall section. Parcel: 14001 0012 | |||||
SCORE 100 Tenant fit out, first floor. "mom central" Parcel: 14001 0012 | |||||
SCORE 100 Build storage units in basement for 67 chapel street Parcel: 14001 0012 |