Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Install 60a circuit for electrical furnace and heat-pump disconnect ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: December 1, 2016 | Current use: Single family / duplex | Permit id: 6507691 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 6. 84kw pv system. (24) 285w modules and (1) 6. 6kw inverter. Change panel to 125a main, 150a bus. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: November 9, 2016 | Current use: Single family / duplex | Permit id: 6504388 | |||||
SCORE 95 Heat pump installation ![]() ![]() Applicant: Neil Kelly Co | Permit type: Refrigeration | Permit status: Permit closed | Completion date: January 6, 2016 | Expiration date: June 10, 2017 | Current use: Single family / duplex | Permit id: 6508740 |