Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: November 10, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 25, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: November 23, 2016 Contractor: Global Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 97 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: November 10, 2015 Contractor: Walter Anderson Plumbing Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 25, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 17, 2017 Contractor: Sunrun Installation Services Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: November 24, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |