Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] add 1 dedicated 30amp breaker for solar pv system Date: April 9, 2014 Contractor: West Seattle Natrl Energy Llc Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2014 | Expiration date: April 9, 2015 | Current use: Single family / duplex | Permit id: 6412616 | |||||
SCORE 98 Relocate meter base & mast on a 100a service & run 100a feeder to existing panel Date: March 3, 2003 Contractor: Ronco Electric Permit type: Electrical | Permit status: Permit finaled | Completion date: April 8, 2003 | Expiration date: March 3, 2004 | Current use: Single family / duplex | Permit id: 6011648 |