Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replace current duct system with new system which has been properly designed using the "manual d" duct design method. This duct system will be designed to exceed the required 1,0 cfm of air flow, as required by the ac system. This duct system will evenly distribute air to the main level, and basement. Replace old furnace with 1 coleman "echelon" series - 98 % efficient modulating furnace cp9c furnace - 98% afue - 80,0 btu - variable capacity heating variable speed 3 ton (dc) blower motor install 1 coleman "echelon" series ac system - 16 seer- r410a ac6b air conditioner - 2. 5 ton cooling capacity Date: April 23, 2014 Contractor: Hartman Heating And Air Inc Permit type: Mechanical | Permit status: Closed | Current use: Residential | Permit id: Bld2014-02677 | |||||
SCORE 96 Exterior footing foundation; shoring up porch Date: May 20, 2016 Contractor: Briarglen Construction Permit status: Closed | Current use: Residential | Permit id: Bld2016-04840 |