Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2014 Contractor: Tara S Morales Permit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2014 Contractor: Solarcity Corporation Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2014-Resalt- | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: October 7, 2016 Contractor: Jerrys Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2014 Contractor: Solarcity Corporation Permit type: Residential alterati | Permit status: Issued | Permit id: Pds2014-Resalt- | Parcel: 594-010-75-00 | |||||
SCORE 96 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: October 7, 2016 Contractor: Jerrys Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- |