Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
3rd story bldg front=> properly repair the broken / defective spalding masonry at the two window frames and include window sills (outside) approx Date: June 3, 2010 Permit type: Gc | Permit id: Ea36589 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2014 Permit type: Util | Permit id: Ef01669 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2009 Permit type: Util | Permit id: Ea01992 | |||||
As per mini rc # 2010000181801 (cuno environmental corp) perform air sampling and analysis in accordance with hpd mini requirement contract specifica Date: November 10, 2009 Permit type: Asbest | Permit id: Ea14840 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec01051 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: October 21, 2009 Permit type: Util | Permit id: Ea13144 | |||||
At the cellar: abate the nuisance consisting of exposed electrical wires throughout the ceiling and walls and bring up to code. . Remove all work rel Date: February 10, 2012 Permit type: Elec | Permit id: Ec20029 | |||||
At p/a: clear waste line out to street, clear all toilet from 2nd floor. Down to main trap. Note: vendor must sign and return with your bid: Date: November 27, 2002 Permit type: Stopag | Permit id: E310044 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2008 Permit type: Util | Permit id: E903619 | |||||
#2 oil boiler: make all necessary repairs to #2 oil boiler to restore to proper working condition. Restore hot water. Note: contractor must cont Date: October 22, 2009 Permit type: Heat | Permit id: Ea13807 | |||||
At building front entrance stoop: demo existing concrete treads 7th, 9th and 10th from bottom and install new concrete treads. 2nd floor front ab Date: February 21, 2012 Permit type: Gc | Permit id: Ec20034 | |||||
As per mini rc # 2010000070202 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 1 samples for asbestos content util Date: November 5, 2009 Permit type: Asbest | Permit id: Ea15328 | |||||
As per rc #2006001274402 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: November 30, 2005 Permit type: Delead | Permit id: E615505 | |||||
Note: to vendor this is a peerless boiler model # sclsct-06- w/l serial # 588780-200711 and has a carlin burner make all necessary repairs to # 2 oi Date: June 12, 2012 Permit type: Heat | Permit id: Ec31391 | |||||
Con edison provide electricity to building public areas and heating plant/ hot water heater Date: January 2, 2007 Permit type: Util | Permit id: E717541 | |||||
As per rc # 2010000114501 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 46 ft of pipe insu Date: October 30, 2009 Permit type: Asbest | Permit id: Ea14837 | |||||
SCORE 93 Equipment work Date: April 17, 2012 Contractor: High Power Constr. Corp Permit status: Permit issued | Permit id: 12104699201 | |||||
SCORE 96 Equipment work Contractor: Finix U.S.A. Construction Permit status: Permit in process | Permit id: 12104699202 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: October 18, 2007 Permit type: Util | Permit id: E809978 | |||||
Public hall 2nd and 3rd story, make all necessary repairs to resore electricity to the public hall 2 & 3 floors. Properly repair the unsafe condition Date: April 19, 2013 Permit type: Elec | Permit id: Ed20091 | |||||
(heat related) at basement- trace and repair the reason why the electrical service is interrupted to public areas. Only some parts of the house h Permit type: Elec | Permit id: Eb26184 | |||||
(public area) at public hallway: trace and repair the source of water leak and loose plaster. At public hallway: ceiling and/or wall damages 3 sq Date: September 5, 2008 Permit type: Gc | Permit id: E907641 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03386 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: March 6, 2012 Permit type: Util | Permit id: Ec23185 | |||||
Omo for basement abatement as per rc # 2010000114501 (b&n&k), perform asbestos abatement work as per hpd specification throughout the boiler room, Date: November 5, 2009 Permit type: Asbest | Permit id: Ea15325 | |||||
Basement cellar : 1. Restore electricity to cellar area . Make all necessary repairs, conceal all exposed electrical wires in the cellar. Permit type: Elec | Permit id: Ec19959 | |||||
Basement cellar : 1. Properly install with similar material the missing/defective plaster ceiling in cellar and boiler room. Approx. 2 sq f Permit type: Gc | Permit id: Ec19978 | |||||
Bsmnt:clear main sewer stoppage,s backing up into the boilerroom. Remove all standing water from floor in basement. Leave floor clean and dry. All de Date: March 11, 2011 Permit type: Stopag | Permit id: Eb25038 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee02311 | |||||
At boiler room- make all necessary repairs to #2 oil boiler in order to restore back to proper working order. Tune up and adjnozzle. Vacuum and clean Date: March 22, 2011 Permit type: Heat | Permit id: Eb26049 | |||||
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specific Date: November 10, 2009 Permit type: Asbest | Permit id: Ea15327 | |||||
New heating plant: remove old heating plant. Provide and install a new #2oil heat plant with coil to supply hot water to building. Supply and ins Date: November 4, 2009 Permit type: Heat | Permit id: Ea14698 | |||||
Demo and replace approx sq. Ft. Of public hall way ceiling at 1st story prime and 2 coats paint. Note: contractor must contact cordell @(718) Date: November 1, 2005 Permit type: Gc | Permit id: E612251 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: March 11, 2011 Permit type: Util | Permit id: Eb25108 | |||||
Celler, trace and locate and repair the defective pipe that flooded the the celler. Pump out all of the stagnet waterand sanitize. Omo is in conjun Date: March 5, 2012 Permit type: Plumb | Permit id: Ec21578 | |||||
Entrance stoop: repair with similar material the broken or defective concrete treads 7th, 9th and tenth from bottom - total three (3) at building Permit type: Gc | Permit id: Ec19926 | |||||
As per mini rc # 2010000070201 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 02 samples for asbestos content uti Date: November 5, 2009 Permit type: Asbest | Permit id: Ea14831 | |||||
At front of building at 3rd sty window make all necessary pepairs to repair with similar material the broken spalding at window frame at front apx 72 Date: November 20, 2009 Permit type: Gc | Permit id: Ea15298 | |||||
At basment prime and start boiler (oil delivered) Date: March 17, 2011 Permit type: Heat | Permit id: Eb25668 | |||||
SCORE 93 Equipment work Date: April 17, 2012 Contractor: High Power Constr. Corp Permit status: Permit issued | Permit id: 12104699201 | |||||
SCORE 96 Equipment work Contractor: Finix U.S.A. Construction Permit status: Permit in process | Permit id: 12104699202 | |||||
(heat related) at basement- trace and repair the reason why the electrical service is interrupted to public areas. Only some parts of the house h Permit type: Elec | Permit id: Eb26184 | |||||
Basement cellar : 1. Restore electricity to cellar area . Make all necessary repairs, conceal all exposed electrical wires in the cellar. Permit type: Elec | Permit id: Ec19959 | |||||
Basement cellar : 1. Properly install with similar material the missing/defective plaster ceiling in cellar and boiler room. Approx. 2 sq f Permit type: Gc | Permit id: Ec19978 | |||||
Entrance stoop: repair with similar material the broken or defective concrete treads 7th, 9th and tenth from bottom - total three (3) at building Permit type: Gc | Permit id: Ec19926 | |||||
SCORE 96 Equipment work Contractor: Finix U.S.A. Construction Permit status: Permit in process | Permit id: 12104699202 | |||||
Date: April 17, 2012 Client: Peter Briskin | Client Address: 7778 Broadway New York Ny 10038 | Client Phone: (212) 608-7778 | Client Company: Peter Briskin, Fishbeyn & Briski | Permit status: Initial | Permit id: 121046992 | |||||
Entrance stoop: repair with similar material the broken or defective concrete treads 7th, 9th and tenth from bottom - total three (3) at building Permit type: Gc | Permit id: Ec19926 | |||||
Basement cellar : 1. Properly install with similar material the missing/defective plaster ceiling in cellar and boiler room. Approx. 2 sq f Permit type: Gc | Permit id: Ec19978 | |||||
Basement cellar : 1. Restore electricity to cellar area . Make all necessary repairs, conceal all exposed electrical wires in the cellar. Permit type: Elec | Permit id: Ec19959 | |||||
(heat related) at basement- trace and repair the reason why the electrical service is interrupted to public areas. Only some parts of the house h Permit type: Elec | Permit id: Eb26184 | |||||
SCORE 96 Equipment work Contractor: Finix U.S.A. Construction Permit status: Permit in process | Permit id: 12104699202 | |||||
SCORE 100 Date: April 17, 2012 Contractor: Robert Lysohir Client: Peter Briskin | Client Address: 7778 Broadway New York Ny 10038 | Client Phone: (212) 608-7778 | Client Company: Peter Briskin, Fishbeyn & Briski | Permit status: Initial | Permit id: 121046992 | |||||
Con edison provide electricity to building public areas and heating plant hot water heater Date: July 1, 2007 Permit type: Util | Permit id: E800666 | |||||
Entrance stoop: repair with similar material the broken or defective concrete treads 7th, 9th and tenth from bottom - total three (3) at building Permit type: Gc | Permit id: Ec19926 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee02311 | |||||
Basement cellar : 1. Properly install with similar material the missing defective plaster ceiling in cellar and boiler room. Approx. 2 sq f Permit type: Gc | Permit id: Ec19978 | |||||
Basement cellar : 1. Restore electricity to cellar area . Make all necessary repairs, conceal all exposed electrical wires in the cellar. Permit type: Elec | Permit id: Ec19959 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2012 Permit type: Util | Permit id: Ed01230 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03386 | |||||
(heat related) at basement- trace and repair the reason why the electrical service is interrupted to public areas. Only some parts of the house h Permit type: Elec | Permit id: Eb26184 | |||||
(public area) at public hallway: trace and repair the source of water leak and loose plaster. At public hallway: ceiling and or wall damages 3 sq Date: September 5, 2008 Permit type: Gc | Permit id: E907641 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: October 18, 2007 Permit type: Util | Permit id: E809978 | |||||
Note: to vendor this is a peerless boiler model # sclsct-06- w l serial # 588780-200711 and has a carlin burner make all necessary repairs to # 2 oi Date: June 12, 2012 Permit type: Heat | Permit id: Ec31391 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2008 Permit type: Util | Permit id: E903619 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2014 Permit type: Util | Permit id: Ef01669 | |||||
3rd story bldg front=> properly repair the broken defective spalding masonry at the two window frames and include window sills (outside) approx Date: June 3, 2010 Permit type: Gc | Permit id: Ea36589 | |||||
At p a: clear waste line out to street, clear all toilet from 2nd floor. Down to main trap. Note: vendor must sign and return with your bid: Date: November 27, 2002 Permit type: Stopag | Permit id: E310044 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2009 Permit type: Util | Permit id: Ea01992 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec01051 | |||||
SCORE 96 Equipment work Contractor: Finix U.S.A. Construction Permit status: Permit in process | Permit id: 12104699202 | |||||
SCORE 99 Date: April 17, 2012 Contractor: Mikhail Pustulnik Client: Peter Briskin | Client Address: 7778 Broadway New York Ny 10038 | Client Phone: (212) 608-7778 | Client Company: Peter Briskin, Fishbeyn & Briski | Permit status: Renewal | Permit id: 121046992 | |||||
Entrance stoop: repair with similar material the broken or defective concrete treads 7th, 9th and tenth from bottom - total three (3) at building Permit type: Gc | Permit id: Ec19926 | |||||
Basement cellar : 1. Properly install with similar material the missing defective plaster ceiling in cellar and boiler room. Approx. 2 sq f Permit type: Gc | Permit id: Ec19978 | |||||
Basement cellar : 1. Restore electricity to cellar area . Make all necessary repairs, conceal all exposed electrical wires in the cellar. Permit type: Elec | Permit id: Ec19959 | |||||
(heat related) at basement- trace and repair the reason why the electrical service is interrupted to public areas. Only some parts of the house h Permit type: Elec | Permit id: Eb26184 |