Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Install new 4 ton 12 seer comfort cooling system including the electric hookup. Date: May 1, 2002 Contractor: Precision Plumbing And Heating Client: Patrick Allen,Kathryn Allen | Applicant: Precision Plumbing & Heating | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 4, 2002 | Current use: Single family d | |||||
SCORE 95 Total tear-off & reroof of sfd, 28 squares of asphalt shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Date: August 12, 2013 Contractor: Greenpoint Roofing Client: Patrick Allen,Kathryn Allen | Applicant: Greenpoint Roofing | Permit type: Roofing | Permit status: Cmp | Completion date: August 14, 2013 | Current use: Single family d | |||||
SCORE 95 Total tear-off & reroof of sfd, 28 squares of asphalt shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Client: Patrick Allen | Permit type: Roofing | Permit status: Cmp | Completion date: August 14, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-03912 | |||||
SCORE 95 Install new 4 ton 12 seer comfort cooling system including the electric hookup. Client: Patrick Allen | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 4, 2002 | Current use: Single family detached dwelling, existin | Permit id: Pmt2002-01699 |