SCORE 95 Application cancelled per applicant request 2 4 15 mh shoreline substantial development application to allow two pedestrian bridges between post alley and alaskan way in the union street right of way to link downtown to the waterfront. One bridge will be located between post alley and western ave and the second bridge will be located between western avenue and alaskan way. Stairs and an elevator will be installed on the side of each bridge. Project includes street level improvements (seattle department of transportation, union street pedestrian connection project). Applicant: Zimmerman, Connie | Permit type: Sepa threshold determination, shoreline development | Permit status: Cancelled | Current use: Institutional | Permit id: 3016998 | |||||
SCORE 95 Elevated bridge structure (1 of 2) sdot pedestrian bridge in the row on union street between alaskan way and 1st ave. ![]() Applicant: Zimmerman, Connie | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6403538 | |||||
SCORE 95 Elevated bridge structure (2 of 2) sdot pedestrian bridge in the row on union street between alaskan way and 1st ave. ![]() Applicant: Zimmerman, Connie | Permit type: Construction | Permit status: Initial information colle | Current use: Institutional | Permit id: 6403539 |