Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Dccr proposes one geotechnical boring (nebbc-42 ) located in the rightmost lane of northeast bound rhode island ave nw. The boring will be 6 inches in diameter and 1 feet deep. A monitoring well will be installed at about feet below ground surface upon boring completion. The work will require 24/7 occupancy of the work space and will take up to three weeks to complete. The work will not impact vehicle or pedestrian traffic, parking signs or trees. ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: August 19, 2014 | Permit id: Pa92189 | |||||
SCORE 100 Dccr proposes one geotechnical boring (nebbc-42 ) located in the rightmost lane of northeast bound rhode island ave nw. The boring will be 6 inches in diameter and 1 feet deep. A monitoring well will be installed at about feet below ground surface upon boring completion. The work will require 24 7 occupancy of the work space and will take up to three weeks to complete. The work will not impact vehicle or pedestrian traffic, parking signs or trees. ![]() ![]() Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: August 19, 2014 | Permit id: Pa92189 | |||||
SCORE 99 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: April 11, 2014 | Permit id: Pa10131146 |