Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 14, 2008 Permit type: Delead | Permit id: E832106 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 18, 2008 Permit type: Delead | Permit id: E909183 | |||||
Apt 1) at bathroom ceiling: trace, locate and repair source of leak at ceiling. Demolish and repair damaged ceiling 16 sq. Ft. With sheetrock. Tape, Date: January 23, 2007 Permit type: Gc | Permit id: E718829 | |||||
Local law #1 violation : as per rc and attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056 Date: January 22, 2007 Permit type: Delead | Permit id: E719536 | |||||
As per rc #2007001218401 (enviro-probe, inc.), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: January 30, 2007 Permit type: Delead | Permit id: E720308 | |||||
As per rc # 2007001218401 (enviro-probe inc), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: January 30, 2007 Permit type: Delead | Permit id: E720077 | |||||
Pump, sweep and sanitize the basement. At east soil stack, repair (5 l. F.) of 2 vertical section (with new). Electrically clean complete undergroun Date: October 17, 2000 Permit type: Stopag | Permit id: E105804 | |||||
SCORE 98 Plumbing Date: February 23, 2015 Contractor: Case Plumbing Llc Permit status: Permit issued | Permit id: 12222934701 | |||||
Boiler room/basement, provide / install new steel boiler room door. Provide/ install new 5/8 fire code sheet rock at the boiler room ceiling, appro Date: October 13, 2011 Permit type: Gc | Permit id: Ec09356 | |||||
Public area front yard : at ground floor apt: clear drain , leave in proper working order. Remove all work related debris. Non s. W. P. Note: c Date: April 25, 2008 Permit type: Stopag | Permit id: E830368 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 an Date: May 13, 2008 Value: $332 Permit type: Delead | Permit id: E832127 | |||||
SCORE 89 Equipment work Date: February 23, 2015 Contractor: Global Group Industries C Permit status: Permit issued | Permit id: 12222934701 | |||||
Boiler room basement, provide install new steel boiler room door. Provide install new 5 8 fire code sheet rock at the boiler room ceiling, appro Date: October 13, 2011 Permit type: Gc | Permit id: Ec09356 | |||||
Repair bathtub leak by repiping bathtub waste complete, to include overflow and waste in apartment above #3. Repair bathroom ceiling in apartment #3 Date: June 28, 2001 Permit type: Plumb | Permit id: E125230 | |||||
At basement- remove the existing heat plant. Provide and install a new #2 oil boiler complete with controls connected to existing flue pipe and re Date: December 29, 2010 Permit type: Heat | Permit id: Eb18455 | |||||
Apt. #3, contractor to restore boiler to proper working condition . Restore adquate heat to apt #3 and entire building. Note: vendor must scope w Date: March 7, 2003 Permit type: Heat | Permit id: E316598 | |||||
(apt#4) install (4) window guards complete. (4) throughout the entire apartment. Repair (1) window guards with one-way screws and stop. (1) throu Date: November 18, 2008 Permit type: Gc | Permit id: E915459 | |||||
Perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 24, 2012 Permit type: Delead | Permit id: Ec18754 |