Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). 2 19 2014 plan change. Electrical only. See c of a... Ss per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 11, 2013 Contractor: Barbara Wharton Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: March 19, 2014 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). 2/19/2014 plan change. Electrical only. See c of a... Ss per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 11, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 19, 2014 | Permit id: Pds2013-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). 2 19 2014 plan change. Electrical only. See c of a... Ss per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 11, 2013 Contractor: N B Baker Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 19, 2014 | Permit id: Pds2013-Resalt- | |||||
Final Date: March 17, 2014 Permit status: Pass | Permit id: Pds2013-Resalt- |