Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: May 4, 2007 Client: Kim Sina | Permit status: Completed | Permit id: 73648 | |||||
Suppression permit Date: September 26, 2016 Client: Kim Sina | Permit status: Active | Permit id: 724726 | |||||
Alteration permit Date: July 7, 2016 Client: Kim Sina | Permit status: Active | Permit id: 672555 | |||||
Use permit Date: May 21, 2007 Client: Kim Sina | Permit status: Completed | Permit id: 69559 | |||||
Use permit Date: April 15, 2016 Client: Kim Sina | Permit status: Completed | Permit id: 684764 | |||||
Mechanical permit Date: August 29, 2016 Client: Kim Sina | Permit status: Active | Permit id: 711459 | |||||
Administrative permit Date: March 25, 2009 Client: Kim Sina | Permit status: Completed | Permit id: 196002 | |||||
Alteration permit Date: July 7, 2016 Client: Kim Sina | Permit status: Active | Permit id: 672555 | |||||
Electrical permit Date: May 9, 2007 Client: Kim Sina | Permit status: Completed | Permit id: 74847 | |||||
Use permit Date: May 21, 2007 Client: Kim Sina | Permit status: Completed | Permit id: 69559 | |||||
Administrative permit Date: March 25, 2009 Client: Kim Sina | Permit status: Completed | Permit id: 196002 | |||||
Use permit Date: April 15, 2016 Client: Kim Sina | Permit status: Completed | Permit id: 684764 | |||||
Electrical permit Date: October 26, 2016 Client: Kim Sina | Permit status: Active | Permit id: 715096 | |||||
Mechanical permit Date: November 23, 2016 Client: Kim Sina | Permit status: Active | Permit id: 726346 | |||||
Suppression permit Date: September 26, 2016 Client: Kim Sina | Permit status: Active | Permit id: 724726 | |||||
Plumbing permit Date: November 22, 2016 Client: Kim Sina | Permit status: Active | Permit id: 709649 | |||||
For a sit-down restaurant at first floor in the same building with all other uses as previously approved. No sign on this application. Date: April 15, 2016 Client: Kim Sina | Permit type: Use permit | Permit status: Completed | Completion date: April 15, 2016 | Permit id: 684764 | |||||
SCORE 93 For level ii alterations to tenant space on the first floor level for use as a sit down restaurant. Alterations to include the erection of partition walls, provide accessibility improvements and finishes throughout. All work to be done per approved plans. Tenant space is sprinklered. If field conditions vary contact design professional prior to the start of any work. Separate permits required for all other work. Date: July 7, 2016 Contractor: Rlc Contractors Inc Client: Kim Sina | Permit type: Alteration permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 672555 | |||||
SCORE 99 For the installation of a new commercial kitchen exhaust hood with associated ductwork and fans as shown on plans. Date: August 29, 2016 Contractor: Reliable Fire Protection Inc Client: Kim Sina | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 711459 | |||||
SCORE 100 Alteration: interior plumbing for a 1st floor restaurant in a 2-story building with a vacant space on the 2nd floor - the installation will comply with the philadelphia plumbing code 2004. Pvc pipe materials are not permitted on this project per code sections p-902. 5 & p-1102. 3. A separate permit is required for the 2" domestic water distribution service and the 5" sewer lateral to the street mains. Fuel gas piping & equipment is not part of this permit. A mechanical permit is required for this work. A separate permit is required for the vacant space on the 2nd floor. Date: November 22, 2016 Contractor: Prompt Plumbing And Mechanical Client: Kim Sina | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 709649 | |||||
SCORE 97 Install 24 outlets 34-lighting fixtures 11 switches 8 remote heads 9 emergency lights 4 exit signs. Install 2-hood fans and 2 bathroom exhaust fans. Install 2-gang 2 amp meter pack and one 2 am panel as per plans only no work on 2nd floor. As per 2008 nec (north district) Date: October 26, 2016 Contractor: Anthony Franklin Client: Kim Sina | Permit type: Electrical permit | Permit status: Completed | Completion date: April 17, 2017 | Permit id: 715096 | |||||
SCORE 77 For the installation of two (2) flat wall awning signs accessory to existing sit-down restaurant at first floor in the existing building structure as per plans. Date: May 30, 2017 Contractor: New Philadelphia Sign Company Client: Kim Sina | Permit type: Sign permit | Permit status: Active | Completion date: June 20, 2017 | Permit id: 781054 | |||||
SCORE 100 Install 2 new emerg lgt units, install 1 emerg remote head, remove and replace all illegal wiring in basement and kitchen. Close all open boxes. All wiring to be type mc cable. Add 1 20a outlet. (north dist) Date: May 9, 2007 Contractor: Chisom Eddie M Client: Kim Sina | Permit type: Electrical permit | Permit status: Completed | Completion date: August 11, 2008 | Permit id: 74847 | |||||
SCORE 100 Install 2 new emerg lgt units, install 1 emerg remote head, remove . (north dist) Date: May 4, 2007 Contractor: Chisom Eddie M Client: Kim Sina | Permit type: Electrical permit | Permit status: Completed | Completion date: July 1, 2008 | Permit id: 73648 | |||||
SCORE 84 For the refilled windows and door openings and close four windows. For installation of (5) roll up gates. Replace existing windows on second floor. No change in size. To comply with violation; see building permit# 672555 for interior fitout & initial approval of accessible ramp installation. Date: February 2, 2017 Contractor: Rjr Group Inc Client: Kim Sina | Permit type: Alteration permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 732381 | |||||
SCORE 100 To install payne 90% 120,0 btu furnace and 5 ton a. C. And duct work as per plans. Separate mechanical permit reqd for toilet room exhaust system Date: November 23, 2016 Contractor: Bens Mechanical Llc Client: Kim Sina | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 726346 | |||||
SCORE 99 Install a new fire suppression system for a hood - for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 26, 2016 Contractor: Reliable Fire Protection Inc Client: Kim Sina | Permit type: Suppression permit | Permit status: Completed | Completion date: April 27, 2017 | Permit id: 724726 |