RENOVATION HISTORY
Based on the information received from building department, associated with 4751 Huntington Av Boston MA 02116 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Install fiber optic cable to telcom equipment cabinet
Date:  February 19, 2010
Value:   $1,000
Contractor: Joseph Annese

Client: Capstar Copley | Permit type: Electrical | Current use: Comm | Permit id: E15436 | Parcel: 401056000
2010/02/19100010047-51 Huntington Av Boston Ma 02116Joseph Annese
SCORE
79
Installing 2 inch emt from basement of hotel to every floor and pulling fiber through the emt for every floor.
Date:  April 22, 2010
Value:   $2,000
Contractor: Rick Maio

Client: Capstar Copley | Permit type: Renovations - exteri | Current use: Other | Permit id: Elv22516 | Parcel: 401056000
2010/04/2220007947-51 Huntington Av Boston Ma 02116Rick Maio
SCORE
66
Electrical install interduct
Date:  August 17, 2010
Value:   $5,000
Contractor: James Pelletier

Client: Capstar Copley | Permit type: Electrical | Current use: Comm | Permit id: E38752 | Parcel: 401056000
2010/08/1750006647-51 Huntington Av Boston Ma 02116James Pelletier
SCORE
84
Exhale restaurant: change maximum occupancy to 62 sitting in main dining area;and 17 in side dining area (total 79);with removal of furniture;120 standing room only.
Date:  April 11, 2011
Value:   $800
Contractor: James Fucile

Client: Capstar Copley | Permit type: Change occupancy | Current use: Comm | Permit id: Alt54186 | Parcel: 401056000
2011/04/118008447-51 Huntington Av Boston Ma 02116James Fucile
SCORE
66
Hotel restaurant#36a #37 #38 rooftop wireless;communications day care. C o for: restaurant #36a #37 #38. Permit#alt54186-issued-4 11 2011. ; ;
Date:  April 29, 2011
Contractor: John Maibach

Client: Capstar Copley | Permit id: Coo72809 | Parcel: 401056000
2011/04/2906647-51 Huntington Av Boston Ma 02116John Maibach
SCORE
100
Legal use and occupancy is hotel and accessory restaurant. #36a #37 certificate of use and occupancy for restaurant. #36a #37 alt 85218 issued 7 14 2011
Date:  September 16, 2011
Value:   $230,000
Contractor: James Fagan

Client: Capstar Copley | Permit type: Interior/exterior wo | Current use: Mixed | Permit id: Coo92963 | Parcel: 401056000
2011/09/1623000010047-51 Huntington Av Boston Ma 02116James Fagan
SCORE
93
To install new water heater and make upgrades to the existing hot and cold water piping in the basement of the copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Plumbing | Current use: Comm | Permit id: Pl103041 | Parcel: 401056000
2011/10/28890009347-51 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
93
Install new water heater and tie onto existing gas main in basement of copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Gas | Current use: Comm | Permit id: G103067 | Parcel: 401056000
2011/10/28890009347-51 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Plumbing | Current use: Comm | Permit id: Pl219766 | Parcel: 401056000
2013/02/12300009347-51 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
100
Excavate test pits required to inspect foundations & wood piles reinstate concrete floor after work.
Date:  August 1, 2013
Value:   $16,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Excavation borings t | Current use: Comm | Permit id: Sf268684 | Parcel: 401056000
2013/08/011600010047-51 Huntington Av Boston Ma 02116James Chute
SCORE
100
Temporary work for foundation repairs including staging temp. Partitions temp. Electrical work temp. Plumbing work for toilet insulation excavate access pit & load test 4 piles install survey pins on walls & columns etc.
Date:  December 3, 2013
Value:   $125,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Excavation borings t | Current use: Comm | Permit id: Sf309652 | Parcel: 401056000
2013/12/0312500010047-51 Huntington Av Boston Ma 02116James Chute
SCORE
100
Construction controlled emergency repairs to foundations as per the attached engineers stamped plans
Date:  January 17, 2014
Value:   $4,590,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Renovations -interio | Current use: Comm | Permit id: Alt310906 | Parcel: 401056000
2014/01/17459000010047-51 Huntington Av Boston Ma 02116James Chute
SCORE
100
Upgrade existing subsoil re-charge system by installing approx. 230 of 6 pvc schedule 40 perforated pipe.
Date:  March 10, 2014
Value:   $60,000
Contractor: James Foy

Client: Capstar Copley | Permit type: Plumbing | Current use: Other | Permit id: Pl342450 | Parcel: 401056000
2014/03/106000010047-51 Huntington Av Boston Ma 02116James Foy
Install traffic cabinet foundation in sdwk; 3 x 2; &; conduit in sdwk; all work 8am-3;30pm
Date:  March 31, 2014

Client: Capstar Copley | Permit type: Service | Permit id: Exca-34812 | Parcel: 401056000
2014/03/3109547-51 Huntington Av Boston Ma 02116
SCORE
100
Amend permit no. Alt 310906 to;repair replace existing recharge system as per our engineers attached plans. Approved by bw&;sc.
Date:  July 22, 2014
Value:   $60,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Excavation borings t | Current use: Comm | Permit id: A380459 | Parcel: 401056000
2014/07/226000010047-51 Huntington Av Boston Ma 02116James Chute
Drywall framing low walls electrical plumbing millwork painting for juice bar area.
Date:  December 19, 2014
Value:   $31,000

Client: Capstar Copley | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf436355 | Parcel: 401056000
2014/12/19310009547-51 Huntington Av Boston Ma 02116
Perform one (1) boring on the sidewalk next to the existing building footprint.
Date:  January 20, 2015
Value:   $2,000

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: July 20, 2015 | Current use: Other | Permit id: Sf442449 | Parcel: 0401056000
2015/01/2020009547 51 Huntington Av Boston Ma
SCORE
66
Hotel restaurant#36a #37 #38 rooftop wireless;communications day care. C/o for: restaurant #36a #37 #38. Permit#alt54186-issued-4/11/2011. ; ;
Date:  April 29, 2011
Contractor: John Maibach

Client: Capstar Copley | Permit type: Certificate of occupancy | Permit id: Coo72809 | Parcel: 0401056000
2011/04/2906647 51 Huntington Av Boston MaJohn Maibach
SCORE
93
Install new water heater and tie onto existing gas main in basement of copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Gas permit | Expiration date: April 28, 2012 | Current use: Comm | Permit id: G103067 | Parcel: 0401056000
2011/10/28890009347 51 Huntington Av Boston MaGeoff Croteau
SCORE
91
Clean existing roof surface and re-coat roof with 2 ply thermal plastic rubberized roof coating
Date:  October 21, 2015
Value:   $675,000
Contractor: Douglas Aust

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: April 21, 2016 | Current use: Comm | Permit id: Sf525912 | Parcel: 0401056000
2015/10/216750009147 51 Huntington Av Boston MaDouglas Aust
SCORE
83
Interior renovation including painting vinyl wallcovering tile and replacement of light fixtures.
Date:  August 24, 2015
Value:   $443,600
Contractor: Robert Waxman

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: February 24, 2016 | Current use: Comm | Permit id: Sf511627 | Parcel: 0401056000
2015/08/244436008347 51 Huntington Av Boston MaRobert Waxman
SCORE
100
Temporary work for foundation repairs including staging temp. Partitions temp. Electrical work temp. Plumbing work for toilet insulation excavate access pit & load test 4 piles install survey pins on walls & columns etc.
Date:  December 3, 2013
Value:   $125,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: June 3, 2014 | Current use: Comm | Permit id: Sf309652 | Parcel: 0401056000
2013/12/0312500010047 51 Huntington Av Boston MaJames Chute
SCORE
100
Excavate test pits required to inspect foundations & wood piles reinstate concrete floor after work.
Date:  August 1, 2013
Value:   $16,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: February 1, 2014 | Current use: Comm | Permit id: Sf268684 | Parcel: 0401056000
2013/08/011600010047 51 Huntington Av Boston MaJames Chute
SCORE
100
Add new compliant partitions and upgrade some old partitions and shelves removed during foundation repairs.
Date:  November 9, 2015
Value:   $29,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: May 9, 2016 | Current use: Comm | Permit id: Sf537268 | Parcel: 0401056000
2015/11/092900010047 51 Huntington Av Boston MaJames Chute
SCORE
100
Install mini piles and reinforced concrete transfer beams as per the attached engineers drawings required to supplement existing wood piling system. ; ;
Date:  August 27, 2015
Value:   $1,300,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Amendment to a long form | Expiration date: February 27, 2016 | Current use: Comm | Permit id: A502558 | Parcel: 0401056000
2015/08/27130000010047 51 Huntington Av Boston MaJames Chute
SCORE
100
Amend permit no. Alt 310906 to;repair/replace existing recharge system as per our engineers attached plans. Approved by bw&;sc.
Date:  July 22, 2014
Value:   $60,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Amendment to a long form | Expiration date: January 22, 2015 | Current use: Comm | Permit id: A380459 | Parcel: 0401056000
2014/07/226000010047 51 Huntington Av Boston MaJames Chute
SCORE
100
Construction controlled emergency repairs to foundations as per the attached engineers stamped plans
Date:  January 17, 2014
Value:   $4,590,000
Contractor: James Chute

Client: Capstar Copley | Permit type: Long form/alteration permit | Current use: Comm | Permit id: Alt310906 | Parcel: 0401056000
2014/01/17459000010047 51 Huntington Av Boston MaJames Chute
Removal of express counters [millwork removal] install of new self contained refrigerated cases [plug in]. Includes demo and electrical. Also add refrigerated cases in front of juice bar. Demo electrical and plumbing.
Date:  June 26, 2015
Value:   $18,000

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: December 26, 2015 | Current use: Comm | Permit id: Sf488999 | Parcel: 0401056000
2015/06/26180009547 51 Huntington Av Boston Ma
SCORE
66
Electrical install interduct
Date:  August 17, 2010
Value:   $5,000
Contractor: James Pelletier

Client: Capstar Copley | Permit type: Electrical permit | Expiration date: February 17, 2011 | Current use: Comm | Permit id: E38752 | Parcel: 0401056000
2010/08/1750006647 51 Huntington Av Boston MaJames Pelletier
Stand dumpster at curb; two spaces;renewal
Date:  January 23, 2013

Client: Capstar Copley | Permit type: Street occupancy permit | Expiration date: February 21, 2013 | Permit id: Occu-166087 | Parcel: 0401056000
2013/01/2309547 51 Huntington Av Boston Ma
SCORE
100
Legal use and occupancy is hotel and accessory restaurant. #36a #37 certificate of use and occupancy for restaurant. #36a #37 alt 85218 issued 7/14/2011
Date:  September 16, 2011
Value:   $230,000
Contractor: James Fagan

Client: Capstar Copley | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo92963 | Parcel: 0401056000
2011/09/1623000010047 51 Huntington Av Boston MaJames Fagan
SCORE
93
To install new water heater and make upgrades to the existing hot and cold water piping in the basement of the copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Plumbing permit | Expiration date: April 28, 2012 | Current use: Comm | Permit id: Pl103041 | Parcel: 0401056000
2011/10/28890009347 51 Huntington Av Boston MaGeoff Croteau
Drywall framing low walls electrical plumbing millwork painting for juice bar area.
Date:  December 19, 2014
Value:   $31,000

Client: Capstar Copley | Permit type: Short form bldg permit | Expiration date: June 19, 2015 | Current use: Comm | Permit id: Sf436355 | Parcel: 0401056000
2014/12/19310009547 51 Huntington Av Boston Ma
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Gas permit | Expiration date: August 12, 2013 | Current use: Comm | Permit id: G219769 | Parcel: 0401056000
2013/02/12300009347 51 Huntington Av Boston MaGeoff Croteau
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Capstar Copley | Permit type: Plumbing permit | Expiration date: August 12, 2013 | Current use: Comm | Permit id: Pl219766 | Parcel: 0401056000
2013/02/12300009347 51 Huntington Av Boston MaGeoff Croteau
Street occupancy permit
Date:  August 3, 2012

Client: Capstar Copley | Expiration date: September 2, 2012 | Permit id: Occu-159634 | Parcel: 0401056000
2012/08/0309547 51 Huntington Av Boston Ma
SCORE
100
Upgrade existing subsoil re-charge system by installing approx. 2 of 6" pvc schedule perforated pipe.
Date:  March 10, 2014
Value:   $60,000
Contractor: James Foy

Client: Capstar Copley | Permit type: Plumbing permit | Expiration date: September 10, 2014 | Current use: Other | Permit id: Pl342450 | Parcel: 0401056000
2014/03/106000010047 51 Huntington Av Boston MaJames Foy
SCORE
100
Install fiber optic cable to telcom equipment cabinet
Date:  February 19, 2010
Value:   $1,000
Contractor: Joseph Annese

Client: Capstar Copley | Permit type: Electrical permit | Expiration date: August 19, 2010 | Current use: Comm | Permit id: E15436 | Parcel: 0401056000
2010/02/19100010047 51 Huntington Av Boston MaJoseph Annese
Street occupancy permit
Date:  July 3, 2012

Client: Capstar Copley | Expiration date: August 3, 2012 | Permit id: Occu-159624 | Parcel: 0401056000
2012/07/0309547 51 Huntington Av Boston Ma
SCORE
84
Exhale restaurant: change maximum occupancy to 62 sitting in main dining area;and 17 in side dining area (total 79);with removal of furniture;1 standing room only.
Date:  April 11, 2011
Value:   $800
Contractor: James Fucile

Client: Capstar Copley | Permit type: Long form/alteration permit | Expiration date: October 11, 2011 | Current use: Comm | Permit id: Alt54186 | Parcel: 0401056000
2011/04/118008447 51 Huntington Av Boston MaJames Fucile
SCORE
84
Lobby lighting and guest suite lighting
Date:  September 21, 2015
Value:   $38,000
Contractor: Richard Drinkwater

Client: Capstar Copley | Permit type: Electrical permit | Expiration date: March 21, 2016 | Current use: Other | Permit id: E519898 | Parcel: 0401056000
2015/09/21380008447 51 Huntington Av Boston MaRichard Drinkwater
Install traffic cabinet foundation in sdwk; 3 x 2; &; conduit in sdwk; all work 8am-3;30pm
Date:  March 31, 2014

Client: Capstar Copley | Permit type: Excavation permit | Expiration date: May 29, 2014 | Permit id: Exca-348121 | Parcel: 0401056000
2014/03/3109547 51 Huntington Av Boston Ma
SCORE
81
Demo & renovations to lobby -- new finishes new carpet touch up painting new wallcovering
Date:  September 18, 2015
Contractor: Lorraine Marsden

Client: Capstar Copley | Permit type: Bfd construction demo reno | Permit id: Fdc519203 | Parcel: 0401056000
2015/09/1808147 51 Huntington Av Boston MaLorraine Marsden
SCORE
79
Installing 2 inch emt from basement of hotel to every floor and pulling fiber through the emt for every floor.
Date:  April 22, 2010
Value:   $2,000
Contractor: Rick Maio

Client: Capstar Copley | Permit type: Electrical low voltage | Expiration date: October 22, 2010 | Current use: Other | Permit id: Elv22516 | Parcel: 0401056000
2010/04/2220007947 51 Huntington Av Boston MaRick Maio
SCORE
100
Replace 3 existing antennas with 5 new antennas. Install new remote radiohead units new surge arrestors and associated cable runs as shown on plans. Bra approved.
Date:  October 19, 2015
Value:   $50,000
Contractor: Gregory Sampson

Client: Capstar Copley | Permit type: Long form/alteration permit | Expiration date: April 19, 2016 | Current use: Mixed | Permit id: Alt514530 | Parcel: 0401056000
2015/10/195000010047 51 Huntington Av Boston MaGregory Sampson
Drywall framing low walls electrical plumbing millwork painting for juice bar area.
Date:  December 19, 2014
Value:   $31,000

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf436355 | Parcel: 0401056000
2014/12/1931000954751 Huntington Av Boston Ma 02116
Removal of express counters [millwork removal] install of new self contained refrigerated cases [plug in]. Includes demo and electrical. Also add refrigerated cases in front of juice bar. Demo electrical and plumbing.
Date:  June 26, 2015
Value:   $18,000

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf488999 | Parcel: 0401056000
2015/06/2618000954751 Huntington Av Boston Ma 02116
Short form bldg permit
Date:  December 19, 2014
Value:   $31,000

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf436355
2014/12/1931000954751 Huntington Av Boston Ma 02116
Short form bldg permit
Date:  June 26, 2015
Value:   $18,000

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf488999
2015/06/2618000954751 Huntington Av Boston Ma 02116
SCORE
96
Replace six remote radio units and add six remote radio units on existing mount at existing wireless telecommunication facility.
Date:  March 30, 2017
Value:   $12,000
Contractor: Timothy Greene

Client: Cpf Copley Owner Llc | Permit type: Cellular tower | Permit status: Open | Current use: Comm | Permit id: Alt687388 | Parcel: 0401056000
2017/03/3012000964751 Huntington Av Boston Ma 02116Timothy Greene
SCORE
82
Add three (3) panel antennas two (2) of the proposed additional three (3) antennas will be mounted inside one (1) existing stealth chimney structure (this structure will not change in size) while the third proposed antenna will be in the second stealth structure (this existing structure will be enlarged to accommodate the additional antenna). Add 3 rru upgrade base equipment
Date:  November 10, 2016
Value:   $40,000
Contractor: David Archambault

Client: Cpf Copley Owner Llc | Permit type: Cellular tower | Permit status: Open | Current use: Mixed | Permit id: Alt643933 | Parcel: 0401056000
2016/11/1040000824751 Huntington Av Boston Ma 02116David Archambault
SCORE
66
Electrical install interduct
Date:  August 17, 2010
Value:   $5,000
Contractor: James Pelletier

Client: Cpf Copley Owner Llc | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E38752 | Parcel: 0401056000
2010/08/175000664751 Huntington Av Boston Ma 02116James Pelletier
SCORE
83
Interior renovation including painting vinyl wallcovering tile and replacement of light fixtures.
Date:  August 24, 2015
Value:   $443,600
Contractor: Robert Waxman

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf511627 | Parcel: 0401056000
2015/08/24443600834751 Huntington Av Boston Ma 02116Robert Waxman
SCORE
100
Remove and replace 3 existing antennas with 6 new antennas on the roof of the building. Construct new concealment canisters on equipment platform and around existing flagpole. Relocate existing antenna per plans. Install appurtenant equipment (remote radiohead units surge arrestors cabling).
Date:  August 24, 2016
Value:   $85,000
Contractor: Gregory Sampson

Client: Cpf Copley Owner Llc | Permit type: Cellular tower | Permit status: Open | Current use: Mixed | Permit id: Alt613525 | Parcel: 0401056000
2016/08/24850001004751 Huntington Av Boston Ma 02116Gregory Sampson
SCORE
100
Add new compliant partitions and upgrade some old partitions and shelves removed during foundation repairs.
Date:  November 9, 2015
Value:   $29,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf537268 | Parcel: 0401056000
2015/11/09290001004751 Huntington Av Boston Ma 02116James Chute
SCORE
100
Temporary work for foundation repairs including staging temp. Partitions temp. Electrical work temp. Plumbing work for toilet insulation excavate access pit & load test 4 piles install survey pins on walls & columns etc.
Date:  December 3, 2013
Value:   $125,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Excavation borings test pits | Permit status: Expired | Current use: Comm | Permit id: Sf309652 | Parcel: 0401056000
2013/12/031250001004751 Huntington Av Boston Ma 02116James Chute
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl219766 | Parcel: 0401056000
2013/02/1230000934751 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
93
To install new water heater and make upgrades to the existing hot and cold water piping in the basement of the copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl103041 | Parcel: 0401056000
2011/10/2889000934751 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
100
Excavate test pits required to inspect foundations & wood piles reinstate concrete floor after work.
Date:  August 1, 2013
Value:   $16,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Excavation borings test pits | Permit status: Expired | Current use: Comm | Permit id: Sf268684 | Parcel: 0401056000
2013/08/01160001004751 Huntington Av Boston Ma 02116James Chute
SCORE
100
Install mini piles and reinforced concrete transfer beams as per the attached engineers drawings required to supplement existing wood piling system. ; ;
Date:  August 27, 2015
Value:   $1,300,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: A502558 | Parcel: 0401056000
2015/08/2713000001004751 Huntington Av Boston Ma 02116James Chute
SCORE
66
Hotel restaurant#36a #37 #38 rooftop wireless;communications day care. C o for: restaurant #36a #37 #38. Permit#alt54186-issued-4 11 2011. ; ;
Date:  April 29, 2011
Contractor: John Maibach

Client: Cpf Copley Owner Llc | Permit status: Expired | Permit id: Coo72809 | Parcel: 0401056000
2011/04/290664751 Huntington Av Boston Ma 02116John Maibach
SCORE
84
Lobby lighting and guest suite lighting
Date:  September 21, 2015
Value:   $38,000
Contractor: Richard Drinkwater

Client: Cpf Copley Owner Llc | Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E519898 | Parcel: 0401056000
2015/09/2138000844751 Huntington Av Boston Ma 02116Richard Drinkwater
SCORE
93
Install new water heater and tie onto existing gas main in basement of copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Gas | Permit status: Expired | Current use: Comm | Permit id: G103067 | Parcel: 0401056000
2011/10/2889000934751 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
89
Perform one (1) boring on the sidewalk next to the existing building footprint.
Date:  January 20, 2015
Value:   $2,000
Contractor: Fatima Babickonjic

Client: Cpf Copley Owner Llc | Permit type: Excavation borings test pits | Permit status: Expired | Current use: Other | Permit id: Sf442449 | Parcel: 0401056000
2015/01/202000894751 Huntington Av Boston Ma 02116Fatima Babickonjic
SCORE
100
Amend permit no. Alt 310906 to;repair replace existing recharge system as per our engineers attached plans. Approved by bw&;sc.
Date:  July 22, 2014
Value:   $60,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Excavation borings test pits | Permit status: Expired | Current use: Comm | Permit id: A380459 | Parcel: 0401056000
2014/07/22600001004751 Huntington Av Boston Ma 02116James Chute
SCORE
100
Upgrade existing subsoil re-charge system by installing approx. 2 of 6" pvc schedule perforated pipe.
Date:  March 10, 2014
Value:   $60,000
Contractor: James Foy

Client: Cpf Copley Owner Llc | Permit type: Plumbing | Permit status: Expired | Current use: Other | Permit id: Pl342450 | Parcel: 0401056000
2014/03/10600001004751 Huntington Av Boston Ma 02116James Foy
SCORE
100
Install fiber optic cable to telcom equipment cabinet
Date:  February 19, 2010
Value:   $1,000
Contractor: Joseph Annese

Client: Cpf Copley Owner Llc | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E15436 | Parcel: 0401056000
2010/02/1910001004751 Huntington Av Boston Ma 02116Joseph Annese
SCORE
100
Replace 3 existing antennas with 5 new antennas. Install new remote radiohead units new surge arrestors and associated cable runs as shown on plans. Bra approved.
Date:  October 19, 2015
Value:   $50,000
Contractor: Gregory Sampson

Client: Cpf Copley Owner Llc | Permit type: Cellular tower | Permit status: Expired | Current use: Mixed | Permit id: Alt514530 | Parcel: 0401056000
2015/10/19500001004751 Huntington Av Boston Ma 02116Gregory Sampson
SCORE
79
Installing 2 inch emt from basement of hotel to every floor and pulling fiber through the emt for every floor.
Date:  April 22, 2010
Value:   $2,000
Contractor: Rick Maio

Client: Cpf Copley Owner Llc | Permit type: Renovations - exterior | Permit status: Expired | Current use: Other | Permit id: Elv22516 | Parcel: 0401056000
2010/04/222000794751 Huntington Av Boston Ma 02116Rick Maio
SCORE
100
Construction controlled emergency repairs to foundations as per the attached engineers stamped plans
Date:  January 17, 2014
Value:   $4,590,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Alt310906 | Parcel: 0401056000
2014/01/1745900001004751 Huntington Av Boston Ma 02116James Chute
SCORE
100
Legal use and occupancy is hotel and accessory restaurant. #36a #37 certificate of use and occupancy for restaurant. #36a #37 alt 85218 issued 7 14 2011
Date:  September 16, 2011
Value:   $230,000
Contractor: James Fagan

Client: Cpf Copley Owner Llc | Permit type: Interior/exterior work | Permit status: Expired | Current use: Mixed | Permit id: Coo92963 | Parcel: 0401056000
2011/09/162300001004751 Huntington Av Boston Ma 02116James Fagan
SCORE
84
Exhale restaurant: change maximum occupancy to 62 sitting in main dining area;and 17 in side dining area (total 79);with removal of furniture;1 standing room only.
Date:  April 11, 2011
Value:   $800
Contractor: James Fucile

Client: Cpf Copley Owner Llc | Permit type: Change occupancy | Permit status: Expired | Current use: Comm | Permit id: Alt54186 | Parcel: 0401056000
2011/04/11800844751 Huntington Av Boston Ma 02116James Fucile
SCORE
91
Clean existing roof surface and re-coat roof with 2 ply thermal plastic rubberized roof coating
Date:  October 21, 2015
Value:   $675,000
Contractor: Douglas Aust

Client: Cpf Copley Owner Llc | Permit type: Roofing | Permit status: Expired | Current use: Comm | Permit id: Sf525912 | Parcel: 0401056000
2015/10/21675000914751 Huntington Av Boston Ma 02116Douglas Aust
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Gas | Permit status: Expired | Current use: Comm | Permit id: G219769 | Parcel: 0401056000
2013/02/1230000934751 Huntington Av Boston Ma 02116Geoff Croteau
SCORE
66
Hotel restaurant#36a #37 #38 rooftop wireless;communications day care. C o for: restaurant #36a #37 #38. Permit#alt54186-issued-4 11 2011. ; ;
Date:  April 29, 2011
Contractor: John Maibach

Client: Cpf Copley Owner Llc | Permit type: Certificate of occupancy | Permit id: Coo72809 | Parcel: 0401056000
2011/04/290664751 Huntington Av Boston MaJohn Maibach
SCORE
66
Electrical install interduct
Date:  August 17, 2010
Value:   $5,000
Contractor: James Pelletier

Client: Cpf Copley Owner Llc | Permit type: Electrical permit | Expiration date: February 17, 2011 | Current use: Comm | Permit id: E38752 | Parcel: 0401056000
2010/08/175000664751 Huntington Av Boston MaJames Pelletier
SCORE
84
Lobby lighting and guest suite lighting
Date:  September 21, 2015
Value:   $38,000
Contractor: Richard Drinkwater

Client: Cpf Copley Owner Llc | Permit type: Electrical permit | Expiration date: March 21, 2016 | Current use: Other | Permit id: E519898 | Parcel: 0401056000
2015/09/2138000844751 Huntington Av Boston MaRichard Drinkwater
Install traffic cabinet foundation in sdwk; 3 x 2; &; conduit in sdwk; all work 8am-3;30pm
Date:  March 31, 2014

Client: Cpf Copley Owner Llc | Permit type: Excavation permit | Expiration date: May 29, 2014 | Permit id: Exca-348121 | Parcel: 0401056000
2014/03/310954751 Huntington Av Boston Ma
SCORE
100
Upgrade existing subsoil re-charge system by installing approx. 2 of 6" pvc schedule perforated pipe.
Date:  March 10, 2014
Value:   $60,000
Contractor: James Foy

Client: Cpf Copley Owner Llc | Permit type: Plumbing permit | Expiration date: September 10, 2014 | Current use: Other | Permit id: Pl342450 | Parcel: 0401056000
2014/03/10600001004751 Huntington Av Boston MaJames Foy
SCORE
93
Install new water heater and tie onto existing gas main in basement of copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Gas permit | Expiration date: April 28, 2012 | Current use: Comm | Permit id: G103067 | Parcel: 0401056000
2011/10/2889000934751 Huntington Av Boston MaGeoff Croteau
SCORE
100
Construction controlled emergency repairs to foundations as per the attached engineers stamped plans
Date:  January 17, 2014
Value:   $4,590,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Long form/alteration permit | Current use: Comm | Permit id: Alt310906 | Parcel: 0401056000
2014/01/1745900001004751 Huntington Av Boston MaJames Chute
SCORE
81
Demo & renovations to lobby -- new finishes new carpet touch up painting new wallcovering
Date:  September 18, 2015
Contractor: Lorraine Marsden

Client: Cpf Copley Owner Llc | Permit type: Bfd construction demo reno | Permit id: Fdc519203 | Parcel: 0401056000
2015/09/180814751 Huntington Av Boston MaLorraine Marsden
Stand dumpster at curb; two spaces;renewal
Date:  January 23, 2013

Client: Cpf Copley Owner Llc | Permit type: Street occupancy permit | Expiration date: February 21, 2013 | Permit id: Occu-166087 | Parcel: 0401056000
2013/01/230954751 Huntington Av Boston Ma
SCORE
100
Temporary work for foundation repairs including staging temp. Partitions temp. Electrical work temp. Plumbing work for toilet insulation excavate access pit & load test 4 piles install survey pins on walls & columns etc.
Date:  December 3, 2013
Value:   $125,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: June 3, 2014 | Current use: Comm | Permit id: Sf309652 | Parcel: 0401056000
2013/12/031250001004751 Huntington Av Boston MaJames Chute
Drywall framing low walls electrical plumbing millwork painting for juice bar area.
Date:  December 19, 2014
Value:   $31,000

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: June 19, 2015 | Current use: Comm | Permit id: Sf436355 | Parcel: 0401056000
2014/12/1931000954751 Huntington Av Boston Ma
Street occupancy permit
Date:  July 3, 2012

Client: Cpf Copley Owner Llc | Expiration date: August 3, 2012 | Permit id: Occu-159624 | Parcel: 0401056000
2012/07/030954751 Huntington Av Boston Ma
SCORE
84
Exhale restaurant: change maximum occupancy to 62 sitting in main dining area;and 17 in side dining area (total 79);with removal of furniture;1 standing room only.
Date:  April 11, 2011
Value:   $800
Contractor: James Fucile

Client: Cpf Copley Owner Llc | Permit type: Long form/alteration permit | Expiration date: October 11, 2011 | Current use: Comm | Permit id: Alt54186 | Parcel: 0401056000
2011/04/11800844751 Huntington Av Boston MaJames Fucile
SCORE
100
Install mini piles and reinforced concrete transfer beams as per the attached engineers drawings required to supplement existing wood piling system. ; ;
Date:  August 27, 2015
Value:   $1,300,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Amendment to a long form | Expiration date: February 27, 2016 | Current use: Comm | Permit id: A502558 | Parcel: 0401056000
2015/08/2713000001004751 Huntington Av Boston MaJames Chute
Stand lift at curb - pedestrian staging required 9:30am to 3:30pm
Date:  April 11, 2016

Client: Cpf Copley Owner Llc | Permit type: Street occupancy permit | Expiration date: April 14, 2016 | Permit id: Occu-579067 | Parcel: 0401056000
2016/04/110954751 Huntington Av Boston Ma
SCORE
100
Legal use and occupancy is hotel and accessory restaurant. #36a #37 certificate of use and occupancy for restaurant. #36a #37 alt 85218 issued 7 14 2011
Date:  September 16, 2011
Value:   $230,000
Contractor: James Fagan

Client: Cpf Copley Owner Llc | Permit type: Certificate of occupancy | Current use: Mixed | Permit id: Coo92963 | Parcel: 0401056000
2011/09/162300001004751 Huntington Av Boston MaJames Fagan
SCORE
79
Installing 2 inch emt from basement of hotel to every floor and pulling fiber through the emt for every floor.
Date:  April 22, 2010
Value:   $2,000
Contractor: Rick Maio

Client: Cpf Copley Owner Llc | Permit type: Electrical low voltage | Expiration date: October 22, 2010 | Current use: Other | Permit id: Elv22516 | Parcel: 0401056000
2010/04/222000794751 Huntington Av Boston MaRick Maio
SCORE
93
To install new water heater and make upgrades to the existing hot and cold water piping in the basement of the copley square hotel.
Date:  October 28, 2011
Value:   $89,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Plumbing permit | Expiration date: April 28, 2012 | Current use: Comm | Permit id: Pl103041 | Parcel: 0401056000
2011/10/2889000934751 Huntington Av Boston MaGeoff Croteau
SCORE
91
Clean existing roof surface and re-coat roof with 2 ply thermal plastic rubberized roof coating
Date:  October 21, 2015
Value:   $675,000
Contractor: Douglas Aust

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: April 21, 2016 | Current use: Comm | Permit id: Sf525912 | Parcel: 0401056000
2015/10/21675000914751 Huntington Av Boston MaDouglas Aust
SCORE
83
Interior renovation including painting vinyl wallcovering tile and replacement of light fixtures.
Date:  August 24, 2015
Value:   $443,600
Contractor: Robert Waxman

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: February 24, 2016 | Current use: Comm | Permit id: Sf511627 | Parcel: 0401056000
2015/08/24443600834751 Huntington Av Boston MaRobert Waxman
SCORE
100
Install fiber optic cable to telcom equipment cabinet
Date:  February 19, 2010
Value:   $1,000
Contractor: Joseph Annese

Client: Cpf Copley Owner Llc | Permit type: Electrical permit | Expiration date: August 19, 2010 | Current use: Comm | Permit id: E15436 | Parcel: 0401056000
2010/02/1910001004751 Huntington Av Boston MaJoseph Annese
SCORE
89
Perform one (1) boring on the sidewalk next to the existing building footprint.
Date:  January 20, 2015
Value:   $2,000
Contractor: Fatima Babickonjic

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: July 20, 2015 | Current use: Other | Permit id: Sf442449 | Parcel: 0401056000
2015/01/202000894751 Huntington Av Boston MaFatima Babickonjic
SCORE
100
Excavate test pits required to inspect foundations & wood piles reinstate concrete floor after work.
Date:  August 1, 2013
Value:   $16,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: February 1, 2014 | Current use: Comm | Permit id: Sf268684 | Parcel: 0401056000
2013/08/01160001004751 Huntington Av Boston MaJames Chute
SCORE
100
Amend permit no. Alt 310906 to;repair replace existing recharge system as per our engineers attached plans. Approved by bw&;sc.
Date:  July 22, 2014
Value:   $60,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Amendment to a long form | Expiration date: January 22, 2015 | Current use: Comm | Permit id: A380459 | Parcel: 0401056000
2014/07/22600001004751 Huntington Av Boston MaJames Chute
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Plumbing permit | Expiration date: August 12, 2013 | Current use: Comm | Permit id: Pl219766 | Parcel: 0401056000
2013/02/1230000934751 Huntington Av Boston MaGeoff Croteau
Street occupancy permit
Date:  August 3, 2012

Client: Cpf Copley Owner Llc | Expiration date: September 2, 2012 | Permit id: Occu-159634 | Parcel: 0401056000
2012/08/030954751 Huntington Av Boston Ma
SCORE
93
Install hot water heater and associated piping in the basement of the copley square hotel.
Date:  February 12, 2013
Value:   $30,000
Contractor: Geoff Croteau

Client: Cpf Copley Owner Llc | Permit type: Gas permit | Expiration date: August 12, 2013 | Current use: Comm | Permit id: G219769 | Parcel: 0401056000
2013/02/1230000934751 Huntington Av Boston MaGeoff Croteau
SCORE
100
Add new compliant partitions and upgrade some old partitions and shelves removed during foundation repairs.
Date:  November 9, 2015
Value:   $29,000
Contractor: James Chute

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: May 9, 2016 | Current use: Comm | Permit id: Sf537268 | Parcel: 0401056000
2015/11/09290001004751 Huntington Av Boston MaJames Chute
Removal of express counters [millwork removal] install of new self contained refrigerated cases [plug in]. Includes demo and electrical. Also add refrigerated cases in front of juice bar. Demo electrical and plumbing.
Date:  June 26, 2015
Value:   $18,000

Client: Cpf Copley Owner Llc | Permit type: Short form bldg permit | Expiration date: December 26, 2015 | Current use: Comm | Permit id: Sf488999 | Parcel: 0401056000
2015/06/2618000954751 Huntington Av Boston Ma
SCORE
100
Remove and replace 3 existing antennas with 6 new antennas on the roof of the building. Construct new concealment canisters on equipment platform and around existing flagpole. Relocate existing antenna per plans. Install appurtenant equipment (remote radiohead units surge arrestors cabling).
Date:  August 24, 2016
Value:   $85,000
Contractor: Gregory Sampson

Client: Cpf Copley Owner Llc | Permit type: Long form/alteration permit | Expiration date: February 24, 2017 | Current use: Mixed | Permit id: Alt613525 | Parcel: 0401056000
2016/08/24850001004751 Huntington Av Boston MaGregory Sampson
SCORE
100
Replace 3 existing antennas with 5 new antennas. Install new remote radiohead units new surge arrestors and associated cable runs as shown on plans. Bra approved.
Date:  October 19, 2015
Value:   $50,000
Contractor: Gregory Sampson

Client: Cpf Copley Owner Llc | Permit type: Long form/alteration permit | Expiration date: April 19, 2016 | Current use: Mixed | Permit id: Alt514530 | Parcel: 0401056000
2015/10/19500001004751 Huntington Av Boston MaGregory Sampson
SCORE
96
Replace six remote radio units and add six remote radio units on existing mount at existing wireless telecommunication facility.
Date:  March 30, 2017
Value:   $12,000
Contractor: Timothy Greene

Client: Cpf Copley Owner Llc | Permit type: Long form/alteration permit | Expiration date: September 30, 2017 | Current use: Comm | Permit id: Alt687388 | Parcel: 0401056000
2017/03/3012000964751 Huntington Av Boston MaTimothy Greene
SCORE
82
Add three (3) panel antennas two (2) of the proposed additional three (3) antennas will be mounted inside one (1) existing stealth chimney structure (this structure will not change in size) while the third proposed antenna will be in the second stealth structure (this existing structure will be enlarged to accommodate the additional antenna). Add 3 rru upgrade base equipment
Date:  November 10, 2016
Value:   $40,000
Contractor: David Archambault

Client: Cpf Copley Owner Llc | Permit type: Long form/alteration permit | Expiration date: May 10, 2017 | Current use: Mixed | Permit id: Alt643933 | Parcel: 0401056000
2016/11/1040000824751 Huntington Av Boston MaDavid Archambault
SCORE
56
Welding of (2) 4"x4"x1 2 steel;angles bfd paid detail required
Date:  June 1, 2017
Contractor: Mike Butters

Client: Cpf Copley Owner Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw705494 | Parcel: 0401056000
2017/06/010564751 Huntington Av Boston MaMike Butters
Bfd chemist certificate proces
Date:  February 23, 2017

Client: Cpf Copley Owner Llc | Permit id: Chm679701 | Parcel: 0401056000
2017/02/230954751 Huntington Av Boston Ma
Bfd chemist certificate proces
Date:  June 29, 2017

Client: Cpf Copley Owner Llc | Permit id: Chm725181 | Parcel: 0401056000
2017/06/290954751 Huntington Av Boston Ma
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.