Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Installation of a flush-mounted grid-tie 3. 9 kw photovoltaic system. Top edge of panel to remain at a lower height than existing ridge -- panels not allowed to cover any existing plumbing, mechanical vents or intakes. Date: December 22, 2008 Contractor: Rec Solar Inc Client: Alex Harwit,Jia Harwit | Applicant: Rec Solar Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 23, 2009 | Current use: Single family d | |||||
SCORE 95 Tear-off & reroof of 6 squares on a sfd, on a pitch represented as 4 12. Date: January 22, 2009 Contractor: Black Roofing Inc Client: Jia Harwit,Alex Harwit | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 29, 2014 | Current use: Single family d | |||||
SCORE 95 Tear-off & reroof of 6 squares on a sfd, on a pitch represented as 4 12. Client: Jia Harwit | Permit type: Roofing | Permit status: Cmp | Completion date: May 29, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-00228 | |||||
SCORE 95 Installation of a flush-mounted grid-tie 3. 9 kw photovoltaic system. Top edge of panel to remain at a lower height than existing ridge -- panels not allowed to cover any existing plumbing, mechanical vents or intakes. Client: Alex Harwit | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 23, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05465 |