Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install 3 ton a c system and add new wiring for system. Date: August 9, 2000 Contractor: Save Home Heat Co. Inc Client: Robert Brown,Judith Thomson | Applicant: Save Home Heat Co., Inc. | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Single family d | |||||
SCORE 56 Installation of exterior stairwell at rear of residence for new basement door. Scope of work includes new exterior light and relocation of hose bib. Client: Nancy Byron | Applicant: Nancy Byron | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 7, 2011 | Current use: Single family d | |||||
SCORE 100 Removal of an existing modified bitumen roof surface on 27 squares on a inchflatinch roof. Install replacement modified bitumen roof system. Pre-reroofing inspection and mid-roof inspection required. Positive drainage and compliance with energy code required. Date: April 30, 2012 Contractor: Schroeder Roofing Inc Client: Nancy Byron | Applicant: Schroeder Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: June 27, 2012 | Current use: Single family d | |||||
SCORE 95 Installation of rooftop, flushmounted, 5. 23 kw photovoltaic solar energy system where no portion of the panels will extend above the existing ridgeline of the house. Date: May 9, 2012 Contractor: Namaste Solar Electric Inc Client: Nancy Byron | Applicant: Namaste Solar Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2012 | Current use: Single family d | |||||
SCORE 92 Emergency repair replace sewer service Date: November 13, 2013 Contractor: Golden West Plumbing Heating And Ac Client: Nancy Byron | Applicant: Golden West Plumbing, Heating & Ac | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 95 Emergency repair replace sewer service Date: November 13, 2013 Contractor: Golden West Plumbing, Heating And Ac Client: Nancy Byron | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2013-06353 | |||||
SCORE 100 Removal of an existing modified bitumen roof surface on 27 squares on a inchflatinch roof. Install replacement modified bitumen roof system. Pre-reroofing inspection and mid-roof inspection required. Positive drainage and compliance with energy code required. Client: Nancy Byron | Permit type: Roofing | Permit status: Cmp | Completion date: June 27, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-02055 | |||||
SCORE 95 Installation of rooftop, flushmounted, 5. 23 kw photovoltaic solar energy system where no portion of the panels will extend above the existing ridgeline of the house. Client: Nancy Byron | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-02240 | |||||
Installation of exterior stairwell at rear of residence for new basement door. Scope of work includes new exterior light and relocation of hose bib. Date: April 19, 2010 Value: $5,785 Client: Nancy Byron | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: November 7, 2011 | Current use: Single family detached dwelling, alterat | Permit id: Pmt2010-01422 | |||||
SCORE 100 Install 3 ton a c system and add new wiring for system. Client: Robert Brown | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03297 |