Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: September 20, 2010 Permit type: Delead | Permit id: Eb10280 | |||||
Perform total lead analysis of 13 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 13, 2010 Permit type: Delead | Permit id: Eb11778 | |||||
@ apt# 1b: as per requirement contract, 1) provide wood plywood seal up (over sized) to the opening at window at bedroom (total 1) Date: October 26, 2015 Permit type: Gc | Permit id: Eg06153 | |||||
At apt # 1b. # 2 oil boiler, perform boiler tune up,replace filter ,nozzle and stariner. Troubleshoot down boiler,vacuum,clean boiler and breech Date: December 6, 2013 Permit type: Heat | Permit id: Ee11500 | |||||
Apt 1b) at bathroom ceiling: trace, locate and repair leak. Demo loose unkeyed plaster and mold at ceiling. Use waterproof sheetrock at ceil Date: November 15, 2006 Permit type: Gc | Permit id: E713323 | |||||
As per the requirement contract with hpd. Apartment # 1a: provide and install total (2) new window guards complete as follows: bedroom#1 (1) and Date: April 5, 2013 Permit type: Gc | Permit id: Ed19616 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: June 11, 2013 Permit type: Delead | Permit id: Ed24260 | |||||
As per mini rc (apt#1-a) provide and install total (3) window guards as follows: bedroom#1 (3), bedroom#2 (1). Remove all work related deb Date: October 16, 2012 Permit type: Gc | Permit id: Ed08051 | |||||
At apt #1a- at kitchen: replace missing radiator with new sized correctly for kitchen size, replace the existing shut off valve with new. Prime Date: April 5, 2013 Permit type: Plumb | Permit id: Ed19671 | |||||
Make all necssary repairs to # 2 oil burner and boiler to provide heat and h/w to entire apt 1-a set h/w at 120. F no more than 130. F also install Date: October 19, 2012 Permit type: Heat | Permit id: Ed08635 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: June 19, 2013 Permit type: Delead | Permit id: Ed24795 | |||||
As per requirement contract: apt 1a supply and install 4 window guard(s) and repair window guard(s) at entire apartment. Remove all work relat Date: October 8, 2013 Permit type: Gc | Permit id: Ee06824 | |||||
Apt #1a) at bathroom : install (1) window guard. Total=1. Remove all work related debris. Mini rc omo #k903908. Note: contractor must contact Date: March 26, 2009 Permit type: Gc | Permit id: E932304 | |||||
Provide single fuel drop with prime and start #2ulsh fuel fill tank. Please report any problems immediately to esb fuel unit (212) 863-8781 Date: November 1, 2013 Permit type: Util | Permit id: Ee09446 | |||||
For access contact tenant philip salix at 347-859-1718 make neccessary repairs to #2 oil boiler to reastore heat and hot water to the entire build Date: February 24, 2015 Permit type: Heat | Permit id: Ef15990 | |||||
@ apt#1a: for access, pls call tenant mendoza, cruz@ (718) 295-7892. @ entire apartment: the following seal up work needs to be completed, Date: October 25, 2016 Permit type: Gc | Permit id: Eh04991 | |||||
Make all necssary repairs to # 2 oil burner and boiler to provide heat and h w to entire apt 1-a set h w at 120. F no more than 130. F also install Date: October 19, 2012 Permit type: Heat | Permit id: Ed08635 | |||||
Public hall replace with new the missing balusters between 2nd floor to roof bulkhead door total 9 balusters. Secure all treads, hand rails and newe Date: March 20, 2012 Permit type: Gc | Permit id: Ec25003 | |||||
Asbestos abatement (note: this work must be coordinated with the air monitoring and roof replacement contractors.) perform asbestos abatement pursu Date: April 20, 2015 Permit type: Asbest | Permit id: Ef15582 | |||||
SCORE 56 Equipment work Date: May 13, 1997 Contractor: Atlas Oil Corp Permit status: Permit issued | Permit id: 20041759301 | |||||
SCORE 100 Equipment work Date: October 16, 2006 Contractor: All Technical Art Permit status: Permit revoked | Permit id: 20108235401 | |||||
Building front , supply and install wire glass panes at entrnce door approximately size (12 x 60) and ( x 60) on the building entrance do Date: December 2, 2013 Permit type: Gc | Permit id: Ee10932 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement and roof replacement contractors.) perform air sampling and analysi Permit type: Asbest | Permit id: Ef15583 | |||||
Bldg. Rear and side yards, remove accumalation of rubbish from rear and both side yards of building aprox. Cubic yards. Note: contractor must con Date: August 7, 2013 Permit type: Gc | Permit id: Ee03591 | |||||
Stucco work all perspective vendors must attend a mandatory pre-bid meeting at the job site on 04/07/2015 at 11: am to meet with a representativ Date: April 15, 2015 Permit type: Gc | Permit id: Ef15684 | |||||
Roof replacement - refer to scanned scope all prospective vendors must attend a mandatory pre-bid meeting on monday, march 23, 2015 at 11: a. M. Date: April 2, 2015 Permit type: Gc | Permit id: Ef15578 | |||||
As per mini rc # 2015000226603 (cardno atc), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification o Date: April 13, 2015 Permit type: Asbest | Permit id: Ef18277 | |||||
At vestiblue install wire glass at north panel at vestiblue appx 48 x 26 remove all work related debris. Non- s. W. P. Note: contractor m Date: August 27, 2012 Permit type: Gc | Permit id: Ed04945 | |||||
Engineer to report on status of south front of building , deflection or out of plumb. Contractor is to contact hpd for joint inspection prior to Date: December 29, 1999 Permit type: Gc | Permit id: E014858 | |||||
@ 1st sty public hall : @ vestibule door: provide and install new wired glass pane (total 1) to replace the defective one at vestibule door. Date: November 4, 2015 Permit type: Gc | Permit id: Eg06091 | |||||
SCORE 97 Equipment work Date: April 29, 2015 Contractor: K.M.D. Construction Inc Permit status: Permit issued | Permit id: 22044995901 | |||||
Apt. Entrance door(1b)/ supply and install(1) mortise lock to apt. Entarnce door. At the time of this invitation to bid, it is not anticipated that Date: July 31, 2013 Value: $238 Permit type: Gc | Permit id: Ee03592 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement and roof replacement contractors.) perform air sampling and analysi Permit type: Asbest | Permit id: Ef15583 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement contractor.) as per mini rc # perform air sampling and analysis in Permit type: Asbest | Permit id: Eg16921 | |||||
@ front facade : re-secure the right side (north) cement moulding piece under 2nd floor window at front facade. Note: field dimension an Date: May 17, 2016 Permit type: Gc | Permit id: Eg17556 | |||||
@ buillding entrance door: replace with new (total 1) mortise lock to replace the defective one at building entrance door. Provide one set of Date: July 21, 2016 Permit type: Gc | Permit id: Eh00608 | |||||
SCORE 100 Date: May 13, 1997 Contractor: Daniel Silvestro Client: Carmen Tasdo | Client Address: 2709 Gifford Ave Bronx Ny 10465 | Client Phone: (718) 597-4289 | Permit status: Initial | Permit id: 200417593 | |||||
SCORE 99 Date: October 16, 2006 Contractor: Eusebio Banks Client: Justo Reyes | Client Address: 4683 Park Avenue Bronx Ny 10458 | Client Phone: (718) 809-9810 | Permit status: Initial | Permit id: 201082354 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement contractor.) as per mini rc # perform air sampling and analysis in Permit type: Asbest | Permit id: Eg16921 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement and roof replacement contractors.) perform air sampling and analysi Permit type: Asbest | Permit id: Ef15583 | |||||
Apt. Entrance door(1b) supply and install(1) mortise lock to apt. Entarnce door. At the time of this invitation to bid, it is not anticipated that Date: July 31, 2013 Value: $238 Permit type: Gc | Permit id: Ee03592 | |||||
Stucco work all perspective vendors must attend a mandatory pre-bid meeting at the job site to meet with a representative from aep. A detail scope Permit type: Gc | Permit id: Eh11099 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement contractor.) as per mini rc # perform air sampling and analysis in Permit type: Asbest | Permit id: Eg16921 | |||||
Stucco work all perspective vendors must attend a mandatory pre-bid meeting at the job site on 04 07 2015 at 11: am to meet with a representativ Date: April 15, 2015 Permit type: Gc | Permit id: Ef15684 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement and roof replacement contractors.) perform air sampling and analysi Permit type: Asbest | Permit id: Ef15583 | |||||
For access, pls call tenant vega, eusebio @ (718)295-7892. Note: tenant from apt#2b has the key to the fire passageway gate leading to cellar Date: January 30, 2017 Permit type: Stopag | Permit id: Eh10699 | |||||
Stucco work all perspective vendors must attend a mandatory pre-bid meeting at the job site to meet with a representative from aep. A detail scop Permit type: Gc | Permit id: Eh11099 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement contractor.) as per mini rc # perform air sampling and analysis in Permit type: Asbest | Permit id: Eg16921 | |||||
Air monitoring (note: this work must be coordinated with the asbestos abatement and roof replacement contractors.) perform air sampling and analysi Permit type: Asbest | Permit id: Ef15583 | |||||
(at apartment #2b) demo entire kitchen ceiling and replace with gwb approx. 1 sq. Ft. Tape, compound, prime and paint two coats entire ceiling. Rem Date: January 3, 2007 Permit type: Gc | Permit id: E717065 | |||||
(apt. #2b) at bedroom demolish ceiling and repair, approx. 1 sq. Ft. And at bathroom, approx sq. Ft. With 5/8 sheetrock, tape, compound, prime Date: January 12, 2007 Permit type: Gc | Permit id: E717998 | |||||
Provide single fuel drop to the above address with prime and start. Fill tank with #2 ulsh fuel. Please report problems immediately to the esb fuel un Date: January 10, 2014 Permit type: Util | Permit id: Ee13693 | |||||
Provide single fuel drop with prime and start #2ulsh fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: October 19, 2012 Permit type: Util | Permit id: Ed08792 | |||||
Apt#2b 1) remove bathtub, toilet and sink in bathroom and the sink with base cabinet in kitchen. (2) demo entire bathroom floor, s Date: November 14, 2014 Permit type: Gc | Permit id: Ef03842 | |||||
(at apartment #2b): at bedroom demo ceiling and repair with 5/8 sheetrock, tape, prime and paint 2 coats complete ceiling. Remove all work related d Permit type: Gc | Permit id: E717513 | |||||
As per mini rc # 2015000226603 (cardno atc), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification o Date: November 12, 2014 Permit type: Asbest | Permit id: Ef09640 | |||||
(at apartment #2b): at bedroom demo ceiling and repair with 5/8 sheetrock, tape, prime and paint 2 coats complete ceiling. Remove all work related d Permit type: Gc | Permit id: E717513 | |||||
@ apt#2b: for access, pls call tenant mandoza, margarita @ (718) 295-7892. @ bathroom, supply and install a new marble saddle (total 1) at Permit type: Gc | Permit id: Eh04253 | |||||
(at apartment #2b): at bedroom demo ceiling and repair with 5/8 sheetrock, tape, prime and paint 2 coats complete ceiling. Remove all work related d Permit type: Gc | Permit id: E717513 | |||||
@ apt#2b: for access, pls call tenant mandoza, margarita @ (718) 295-7892. @ bathroom, supply and install a new marble saddle (total 1) at Date: October 5, 2016 Permit type: Gc | Permit id: Eh04253 | |||||
(at apartment #2b): at bedroom demo ceiling and repair with 5 8 sheetrock, tape, prime and paint 2 coats complete ceiling. Remove all work related d Permit type: Gc | Permit id: E717513 | |||||
(apt. #2b) at bedroom demolish ceiling and repair, approx. 1 sq. Ft. And at bathroom, approx sq. Ft. With 5 8 sheetrock, tape, compound, prime Date: January 12, 2007 Permit type: Gc | Permit id: E717998 | |||||
(at apartment #2b): at bedroom demo ceiling and repair with 5 8 sheetrock, tape, prime and paint 2 coats complete ceiling. Remove all work related d Permit type: Gc | Permit id: E717513 | |||||
(apt. #4a) at bedroom reglaze lower sash. Remove all work related debris. Contractor must sign and return bid. Contractor must contact hpd at Date: January 16, 2008 Permit type: Gc | Permit id: E819195 | |||||
Apt#4a (1) re-align and make all necessary repairs to apt #4a entrance door including door casing and install new mortise lock complete assem Date: April 24, 2012 Permit type: Gc | Permit id: Ec27041 | |||||
Location ; apt #4a ;bedroom e-2 perform all repairs and supply & install new alumiinium window lower sash and thermo glass , approx 24in x 36in . All Date: October 25, 2012 Permit type: Gc | Permit id: Ed08705 | |||||
Apartment #4a, kitchen and room e2: replace with new the defective upper and lower sash windows complete with their glass panes at kitchen and room Date: May 29, 2013 Permit type: Gc | Permit id: Ed23345 | |||||
Apt#4a replace with new the broken glass pane on upper sash of the window in 3rd room.. Remove all work related debris. Alternative enforcement Date: March 20, 2012 Permit type: Gc | Permit id: Ec25004 | |||||
Window replacement file and obtain necessary permit(s) 1. Supply and install new brick to brick aluminum dhc replacement window, include Date: April 22, 2015 Permit type: Gc | Permit id: Ef18208 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: October 19, 2015 Permit type: Delead | Permit id: Eg05745 | |||||
At apt. # 3a supply and install new (six section) radiator at kitchen including new shut off radiator valve. Alternative enforcement program no Date: April 6, 2015 Permit type: Plumb | Permit id: Ef18370 | |||||
At apt # 3a make the entrance door self closing, by replacing the existing ( three #3 ) hinges with new, similar type spring hinges. Alternative Date: April 6, 2015 Permit type: Gc | Permit id: Ef18369 | |||||
(apt. #3b) remove and reinstall bathroom and kitchen appliances. Demolish the following floors to joists: kitchen, approx. 1 sq. Ft., private hall Date: March 14, 2008 Permit type: Gc | Permit id: E823770 | |||||
As per mini rc # 2015000226603 (cardno atc), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification o Date: March 23, 2015 Permit type: Asbest | Permit id: Ef16991 | |||||
Provide automatic fuel drop to the above building until further notice #2ulsh fuel. No prime and start necessary 212-863-7830 Date: July 1, 2014 Permit type: Util | Permit id: Ef04443 | |||||
Provide single fuel drop with prime and start #2ulsh fuel fill tank. Please report any problems immediately to esb fuel unit (212) 863-8781 Date: February 5, 2014 Permit type: Util | Permit id: Ee16471 | |||||
(at apartment #3b): at bathroom demo and install new sheetrock approx. 12 sq. Ft. At ceiling. Prime and paint 2 coats entire bathroom ceiling. Remov Date: December 14, 2006 Permit type: Gc | Permit id: E715552 | |||||
Apt#3b and public halls (1) remove accumulation of house hold debris and broom sweep throughout the public hallways approx 5 cub. Y (2) su Date: May 6, 2014 Permit type: Gc | Permit id: Ee23075 | |||||
Refer to scanned scope electric upgrade & rewiring to apartments, public halls and cellar. All perspective vendors must attend a mandatory pre Permit type: Elec | Permit id: Ef03948 | |||||
Apt#3b 1) remove bathtub, toilet and sink in bathroom and the sink with base cabinet in kitchen. (2) demo entire bathroom floor, s Date: March 4, 2015 Permit type: Gc | Permit id: Ef16204 | |||||
@ apt# 3b: for access, pls call tenant diaz, catalina @ (917)379-1516. @ bathroom:: supply and install anti scalding shower body complete to Permit type: Plumb | Permit id: Eg15512 | |||||
1apt. # 3b : 1. Properly repair with similar material the broken/defective ceiling in room e-4 & , approx. 144 sq ft. Total area. Compound,pr Date: January 20, 2011 Permit type: Gc | Permit id: Eb19425 | |||||
Make neccessary repairs to #2 oil boiler to restore heat and hot water to the entire building for access call phillipe at 1(646)210-4573 alternati Date: February 10, 2014 Permit type: Heat | Permit id: Ee16450 | |||||
@ apt#3b: for access pls, call tenant diaz, iris @ (347) 514-1339, (917) 603-3979.. @ bedroom, provide and install new electrical outlet Date: October 28, 2015 Permit type: Elec | Permit id: Eg06069 | |||||
Apt #3b) trace and repair the source of water leak in wall above the e1 of apt. At room east-1: north wall: 78 sq. Ft., east wall 96 sq. Ft., west Date: October 3, 2007 Permit type: Gc | Permit id: E807671 | |||||
@ apt# 3b: for access, pls call tenant diaz, ccatalina @ (917) 379-1516, @ north center room: demo and discard the defective / damaged sh Date: January 24, 2016 Permit type: Gc | Permit id: Eg10726 | |||||
Refer to scanned scope electric upgrade & rewiring to apartments, public halls and cellar. All perspective vendors must attend a mandatory pre Permit type: Elec | Permit id: Ef03948 | |||||
@ apt# 3b: for access, pls call tenant diaz, catalina @ (917)379-1516. @ bathroom:: supply and install anti scalding shower body complete to Date: April 11, 2016 Permit type: Plumb | Permit id: Eg15512 | |||||
Apt#3b: for access. Pls call tenant diaz, catalina @ (718)562-8158 or (646)520-7360. @ entire apartment: 1) remove and discard the defectiv Permit type: Gc | Permit id: Eh02113 | |||||
Apt#3b: for access. Pls call tenant diaz, catalina @ (718)562-8158 or (646)520-7360. @ entire apartment: 1) remove and discard the defectiv Permit type: Gc | Permit id: Eh02113 | |||||
Refer to scanned scope electric upgrade & rewiring to apartments, public halls and cellar. All perspective vendors must attend a mandatory pre Permit type: Elec | Permit id: Ef03948 | |||||
1apt. # 3b : 1. Properly repair with similar material the broken defective ceiling in room e-4 & , approx. 144 sq ft. Total area. Compound,pr Date: January 20, 2011 Permit type: Gc | Permit id: Eb19425 | |||||
Apt#3b: for access. Pls call tenant diaz, catalina @ (718)562-8158 or (646)520-7360. @ entire apartment: 1) remove and discard the defectiv Permit type: Gc | Permit id: Eh02113 | |||||
Refer to scanned scope electric upgrade & rewiring to apartments, public halls and cellar. All perspective vendors must attend a mandatory pre Permit type: Elec | Permit id: Ef03948 | |||||
@ apt# 3b: for access, pls call tenant diaz, ccatalina @ (917) 379-1516, @ north center room: demo and discard the defective damaged sh Date: January 24, 2016 Permit type: Gc | Permit id: Eg10726 | |||||
At apt# 3b: as per the requirement contract with hpd and doh guidelines, install total ten (10) window guards as follows: (1) bedroom# 1-- Date: September 28, 2017 Permit type: Gc | Permit id: Ei03780 | |||||
Apt. 3b remove & discard the existing rotted defective wood sashes glass & window frames in apartment. Provide & install seven (7) new units of alum Date: April 3, 2017 Permit type: Gc | Permit id: Eh14597 | |||||
Apt#3b: for access. Pls call tenant diaz, catalina @ (718)562-8158 or (646)520-7360. @ entire apartment: 1) remove and discard the defective Permit type: Gc | Permit id: Eh02113 | |||||
Refer to scanned scope electric upgrade & rewiring to apartments, public halls and cellar. All perspective vendors must attend a mandatory pre Permit type: Elec | Permit id: Ef03948 |