Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replace fau ac (package gas pk gas heat elec cooling) for existing sfd ![]() Permit type: Mechanical : 80 - ac | Permit status: Permit finaled | Completion date: March 10, 2010 | Permit id: Pds2010-1009-20 | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. ![]() Permit type: Electrical : 8002 - | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
Replace fau/ac (package gas pk gas heat elec cooling) for existing sfd ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 10, 2010 | Permit id: Pds2010-1009-20 | |||||
SCORE 100 Replace fau ac (package gas pk gas heat elec cooling) for existing sfd ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 10, 2010 | Permit id: Pds2010-1009-20 | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 8, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 93 Electric heat pump and/or air conditioner replacement, no modifications or alterations to existing system ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 5, 2015 | Permit id: Pds2015-Resalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2010-1009-20 |