Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
3rd floor - install atomic absorption spectrometer to include 1ea exhaust hood 2 - 11ov elec ckts 1 air line 1 acetylene line flam gas storage cabinet w exhaust duct. Date: October 5, 2012 Value: $10,000 Current use: Clinics-medic/d | Permit id: #201210051422 | |||||
Tenant improvement in warm shell space on 1st floor. Offices labs no bathrooms office partitions lab benches tissub couture labs. Date: March 20, 2012 Current use: Office | Permit id: #201203206482 | |||||
SCORE 100 Work on the 5th floor: demise (e) office suite in half. Office t. I. This project consists of a new opening to expand an (e) office suite into an (e) adjacent office suite. Current use: Office | Permit id: #201204057649 | |||||
SCORE 100 Renovation of 20 sf of lab space on the 2nd fl and elec outlets to 4 offices on the 2nd and 3rd fl. Also adding fume hoods Current use: Office | Permit id: #201204138225 | |||||
SCORE 100 5th floor: add one fire sprinkler head at ceiling to accommodate new demising wall. Current use: Office | Permit id: #201204248970 | |||||
SCORE 100 Tenant improvement in warm shell space on 1st floor. Offices labs no bathrooms office partitions lab benches tissub couture labs. Current use: Office | Permit id: #201203206482 | |||||
SCORE 100 Bldg 3 1st floor suite 145 - adding 8 horn strobes & 7 strobes due to tenant improvement. Current use: Office | Permit id: #201205311562 | |||||
SCORE 96 Addition of 52 pendent sprinklers per new ceiling and partition layout. Current use: Office | Permit id: #201206061916 | |||||
SCORE 96 Addition of 7 wax coated pendents per new fume hoods. Current use: Office | Permit id: #201206061917 | |||||
SCORE 100 Support of custom wood ceiling Current use: Office | Permit id: #201310169391 | |||||
SCORE 100 1st floor-add 5 strobes 8 horn strobes 2 duct detectors Current use: Office | Permit id: #201310179494 | |||||
SCORE 100 1st floor - mechanical ductwork electrical power and lighting and plumbing for new gr fl office buildout. Ref 201307121673. Fire sprinkler separate Current use: Office | Permit id: #201311212556 | |||||
SCORE 100 Demo e fixtures in room 124 infill door opening on corridor side. Install joisted drywall ceiling new lab casework new lab gas lines and hot cold water. New 6 ducts to e 14 ducts and install new slide gate dampers. Connect 1w piping to e system. Minor electrical revistions Current use: Office | Permit id: #201311273048 | |||||
SCORE 100 Convert pre-action to wet pipe Date: February 22, 2013 Contractor: Shawn Willesen Current use: Office | Permit id: #201302220745 | |||||
SCORE 100 3rd floor - install flame atomic absorption spectrometer to include 1ea exhaust hood 2 - 11ov elec ckts 1 air line 1 acetylene line flam gas storage cabinet w exhaust duct. 2 acetelyene tanks. L s sprinklers on separate permit. Current use: Clinics-medic/d | Permit id: #201210051422 | |||||
SCORE 100 1st floor-first time t. I-new shell space-create offices breakroom restrooms including drywall partitions suspended ceilings convenience kitchenette hvac electrical & lighting. Fire protection & fire alarm under seperate permits Current use: Office | Permit id: #201307121673 | |||||
SCORE 96 Fire sprinkler add 26 pendent and upright head due to new wall and ceilings. Ref app#201307121673. Current use: Office | Permit id: #201309116506 | |||||
SCORE 100 Relocate 5 plug off 1 fire sprinkler. Ref app#201406300071 Current use: Office | Permit id: #201410158899 | |||||
Installation of research and development dna synthesis equipment and supporting chemical supply cabinet into existing laboratory. Laboratory is equipped with cda and ventilation. Mechanical installaton will include ducting to existing building ventilation with connection to existing domestic 110v Date: February 6, 2014 Current use: Clinics-medic/d | Permit id: #201402067993 | |||||
SCORE 100 Relocate 2 fire sprinklers Current use: Office | Permit id: #201402279424 | |||||
SCORE 100 Bldg 3- connect new door holders being installed by others. Na compliance #155-13. Current use: Office | Permit id: #201403049814 | |||||
SCORE 64 Installation of research and development dna synthesis equipment and supporting chemical supply cabinet into existing laboratory. Laboratory is equipped with cda and ventilation. Mechanical installaton will include ducting to existing building ventilation with connection to existing domestic 110v Current use: Clinics-medic/d | Permit id: #201402067993 | |||||
SCORE 100 Installation of lab equipment & associated mep connections. Reference p a#201210051422. Compliance with ordinance no. 155-13 not required. Current use: Clinics-medic/d | Permit id: #201404102927 | |||||
SCORE 97 Add sheet metal exhaust ducts floor drain (1) icw line process cda n2 & o2 lines. N a ordinance #155-13. Current use: Clinics-medic/d | Permit id: #201405196088 | |||||
SCORE 100 3rd floor:soft demolition constuction of new partitions and mep upgrades for new offices. N a for maher 155-13. Fire sprinkler under deferred submittal Current use: Office | Permit id: #201406300071 | |||||
SCORE 100 Suite #125: interior ti. Remodel of existing spaces. Electrical upgrade to comply with title 24. New ada compliance kitchette. Maher n a. Current use: Office | Permit id: #201409035284 | |||||
SCORE 100 Suite 125 - remodel of lab space including mechanical electrical and plumbing work. Ref: pa#2014-09-03-5284. Maher ord n a. Date: September 29, 2014 Contractor: Robert Benson Current use: Office | Permit id: #201409297544 | |||||
SCORE 95 Rock health (92)lights (21)switches (50)receptacles Date: August 17, 2013 Contractor: Mcmillan Bros Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130817421 | |||||
SCORE 88 Install one new 208 volt amp receptacle in lab area. Date: March 19, 2012 Contractor: Mission Electric Kositch Enterprises Inc Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120312461 | |||||
Addition of 9 horn/strobes 1 strobe 2 smoke detectors as part of small tenant and protection of vacant space improvement on 5th fl Value: $7,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 9, 2011 | Expiration date: February 4, 2012 | Current use: Office | Permit id: 201102099893 | |||||
Bldg #2-revisions to pa# 2010-0115-4815-decrease of smoke detectors needed. Revised scope of work is for installing 8 smoke detectors 2 transponders & 2 duct detectors to the (e) fire alarm system Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 25, 2010 | Expiration date: March 20, 2011 | Current use: Office | Permit id: 201003258948 | |||||
SCORE 100 Install new 125volt l5- receptacle in server room. Install new 250volt 6- receptacle for existing oven. Date: December 6, 2013 Contractor: Palmer Electric Inc Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20131121721 | |||||
Install underground fire line fr street to inside of build install flex tend joint for bldg settlement cap underground stud-in for future fire sprinkler system submitted under separate permit. Value: $12,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 18, 2008 | Expiration date: December 14, 2009 | Current use: Office | Permit id: 200812188792 | |||||
Drive (24) indicator test piles on vacant lot for soils and structural testing (steel piles). Value: $27,000 Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: January 9, 2007 | Expiration date: January 23, 2008 | Current use: Vacant lot | Permit id: 200701091303 | |||||
3 non electric walls signs Value: $6,000 Permit type: Sign-errect | Permit status: Complete | Completion date: September 7, 2010 | Expiration date: September 29, 2011 | Current use: Office | Permit id: 201009070291 | |||||
Minor revision to approved app#201101118232. Ground floor slab cuts and infill for plumbing work. Value: $4,700 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 26, 2011 | Expiration date: January 21, 2012 | Current use: Office | Permit id: 201101269077 | |||||
Install call system for area of refuge in the 2 stairwells. Call boxes on floors 2nd 3rd 4th & 5th floors. Mission bay block 26 bldg #2 Value: $38,641 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 13, 2010 | Expiration date: October 8, 2011 | Current use: Office | Permit id: 201010132849 | |||||
Minor revision to pa# 2010. 03. 25. 8995. Relocate door 3-116c ( min) and delete door 3-115b and infill with 1hr rated construction Value: $1,100 Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 23, 2010 | Expiration date: April 18, 2011 | Current use: Office | Permit id: 201004230948 | |||||
To install a new fire alarm system in the shell of the bldg. Devices will be installed in stairwells & elevators and tie in the sprinkler system. Value: $40,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 27, 2009 | Expiration date: September 20, 2010 | Current use: Office | Permit id: 200907273521 | |||||
Provide " area of refuge" and call system for the (2)stairwells on floors 2-5 mb block 26 building 3 Value: $12,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 31, 2010 | Expiration date: October 2, 2011 | Current use: Office | Permit id: 201008319959 | |||||
Office ti on 5th floor " third rock capital" new office partitions elevator lobby and corridors. New fan room and associated mep. Value: $385,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: November 19, 2010 | Expiration date: November 14, 2013 | Current use: Office | Permit id: 201011195330 | |||||
SCORE 96 Installing 1 sink addiing 2 vacuum lines co2 line & oxygen line tying into existing main line Date: February 25, 2014 Contractor: Therma Corporation Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140225472 | |||||
3 non illuminated ground signs Value: $7,000 Permit type: Sign-errect | Permit status: Complete | Completion date: September 7, 2010 | Expiration date: September 29, 2011 | Current use: Office | Permit id: 201009070290 | |||||
Add relocate 562 fire sprinklers. Special inspection required per ab 4. 27 Value: $85,800 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 20, 2010 | Expiration date: September 18, 2013 | Current use: Office | Permit id: 201007206966 | |||||
Bldg #3/5th floor-addition of 11 horn/strobes 5 strobes 4 smoke detectors 1 duct detector 1 module 1 relay and 1 remote test station as part of a prtial tenant improvement on the 5th floor. Value: $7,600 Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 29, 2010 | Expiration date: December 24, 2011 | Current use: Office | Permit id: 201012297550 | |||||
Install of 15 evacuation maps floor 1-5 Value: $5,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 27, 2010 | Expiration date: October 22, 2011 | Current use: Office | Permit id: 201010273808 | |||||
Relocate 2 fire sprinklers Value: $2,800 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 27, 2014 | Expiration date: February 22, 2015 | Current use: Office | Permit id: 201402279424 | |||||
Convert pre-action to wet pipe Value: $3,000 Permit type: Otc alterations permit | Permit status: Filed | Completion date: February 22, 2013 | Current use: Office | Permit id: 201302220745 | |||||
SCORE 100 Work category: 5p; installation of lab sink and safety shower Date: June 18, 2012 Contractor: Southland Industries Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20120618724 | |||||
Per approved permit1205639 the main etry lobby doors consist if bax furekute diirs these update plans change the doors to a total door system. Per app#201001215065 Value: $10,000 Permit type: Otc alterations permit | Permit status: Filed | Completion date: September 13, 2010 | Current use: Office | Permit id: 201009130769 | |||||
Tenant improvement to partial first floor & full third & fouth floors. General construction mechanical electrical plumbing & fire protection. Full build-out of vacant space. Value: $4,600,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 26, 2010 | Expiration date: May 27, 2014 | Current use: Office | Permit id: 201004261048 | |||||
First time t. I. On all floors of b2 tenant space for pfizer bb. All work in tenant space is for b occupancy office & lab areas. Fire alarm & sprinklers under separate permit. Value: $26,000,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 18, 2009 | Expiration date: April 8, 2013 | Current use: Office | Permit id: 200902182285 | |||||
Revision to application 2007-0427-9921. New bathrooms. Corridor and storage rooms & mechanical & electrical. Sorubjkers & fure akarn ybder separate permit. Value: $134,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 25, 2010 | Expiration date: March 28, 2013 | Current use: Office | Permit id: 201003258995 | |||||
T. I. Fire sprinkler work on 5th floor. Add /relocate 4 sprinklers at 3rd rock ventures. Using flex heads special inspection required- revision to 201012217076 Value: $13,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 8, 2011 | Expiration date: February 3, 2012 | Current use: Office | Permit id: 201102089834 | |||||
Add 9 horn/strobes 1 strobe 1 smoke detectors and relocate 1 extg horn/stobes due to a tenant improvement on the 5th floor of bldg 3 Value: $6,200 Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 7, 2011 | Expiration date: July 1, 2012 | Current use: Office | Permit id: 201107079645 | |||||
Construct interior for office laboratories conference rooms and other support areas. Includes all architectural work. Mechanical electrical plumbing and fire sprinkler systems under separate application. Value: $10,000,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: January 21, 2010 | Expiration date: February 3, 2014 | Current use: Office | Permit id: 201001215065 | |||||
Addition of 9 horn strobes 1 strobe 2 smoke detectors as part of small tenant and protection of vacant space improvement on 5th fl Date: February 9, 2011 Value: $7,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: February 9, 2011 | Current use: Office | Permit id: 201102099893 | |||||
Fire alarm for t. I. Ref. P. A.#201001215065 (arch) & 2010031784 (elec) 5-flrs.; 1-expander card 6-pwr. Supply 6-fatc 5-pull station 40-sd 30-duct det. 14-control mod. 6-pam relay 40-speaker strobes 140-horn/strobes 34-strobes 2-hazmat pull sta. 1-expl. Proof 2-expl. Proof detectors. Value: $67,700 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 25, 2010 | Expiration date: September 26, 2011 | Current use: Office | Permit id: 201006255352 | |||||
Fire sprinkler work tenant improvement on 5th floor. Third rock ventures suite. Add/relocatie 67 fire sprinklers. Special inspection required per ab-4. 27. Value: $34,480 Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 21, 2010 | Expiration date: December 16, 2011 | Current use: Office | Permit id: 201012217076 | |||||
Revision to appl. 200704279921 new finishes reception desk mail room & security guard office. New exterior louvers at retail area new conduits and pipes to retail (no new mechanical equipment). New lighting at lobby and retail area. Value: $900,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 6, 2009 | Expiration date: March 4, 2012 | Current use: Office | Permit id: 200902061572 | |||||
Office ti on the 5th fl. New int partitions finishes and mep. New equipment in 1st floor fan room fire alarm and sprinkler under separate permit Value: $510,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 27, 2011 | Expiration date: May 23, 2014 | Current use: Office | Permit id: 201105276990 | |||||
New pad mounted emergency generator. New bldg approved under pa# 2007. 0427. 9921 Value: $710,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 24, 2009 | Expiration date: September 1, 2012 | Current use: Office | Permit id: 200908245406 | |||||
Addition of 4 duct detectors and relays Value: $3,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 10, 2009 | Expiration date: December 5, 2010 | Current use: Office | Permit id: 200912102982 | |||||
Bldg 3- addition of a security door with card reader within an existing passageway. N/a ordinance #155-13 Value: $10,000 Permit type: Otc alterations permit | Permit status: Filed | Completion date: May 4, 2015 | Current use: Office | Permit id: 201505045233 | |||||
5th floor: add one fire sprinkler head at ceiling to accommodate new demising wall. Value: $3,200 Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 24, 2012 | Expiration date: April 19, 2013 | Current use: Office | Permit id: 201204248970 | |||||
Renovation of 20 sf of lab space on the 2nd fl and elec outlets to 4 offices on the 2nd and 3rd fl. Also adding fume hoods Value: $300,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 13, 2012 | Expiration date: May 2, 2015 | Current use: Office | Permit id: 201204138225 | |||||
Fire sprinkler add 26 pendent and upright head due to new wall and ceilings. Ref app#201307121673. Value: $12,500 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 11, 2013 | Expiration date: September 6, 2014 | Current use: Office | Permit id: 201309116506 | |||||
Revision to approved pa# 2009. 02. 18. 2285 to reduce pfizer ti from scope of work. Fire alarm and sprinkler under seperate permit. Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 8, 2009 | Expiration date: December 6, 2010 | Current use: Office | Permit id: 200912082865 | |||||
Install 963 new sprinklers for tenant improvement. Ref. Appl.#201001215065. Value: $247,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 25, 2010 | Expiration date: May 5, 2013 | Current use: Office | Permit id: 201003258986 | |||||
New design build curtain wall for new construction under 200704279921 Value: $4,000,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 20, 2008 | Expiration date: April 6, 2013 | Current use: Office | Permit id: 200810204591 | |||||
Minor structural revisions to 200704279921. Revised foundation and framing details. Value: $165,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 5, 2008 | Expiration date: September 10, 2009 | Current use: Office | Permit id: 200809050876 | |||||
5th floor - revision to appl #2010111953 to add approximately 40 sq ft to interior office suite. Value: $410,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 27, 2011 | Expiration date: January 29, 2014 | Current use: Office | Permit id: 201101279112 | |||||
Office tenant imp. To extg 5th floor space. Mechanical and electrical work. Fire sprinkler and alarm under seperate permit. Value: $450,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 5, 2011 | Expiration date: July 2, 2014 | Current use: Office | Permit id: 201107059512 | |||||
Tenant improvement in warm shell space on 1st floor. Offices labs no bathrooms office partitions lab benches tissub couture labs. Value: $540,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 20, 2012 | Expiration date: May 8, 2015 | Current use: Office | Permit id: 201203206482 | |||||
Revision to permit #2010-0426-1048; this drawing shows installation of emergency shutoff outside h3/h4 room on 1st floor of 455 mission bay south Value: $4,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 6, 2010 | Expiration date: October 1, 2011 | Current use: Office | Permit id: 201010062393 | |||||
Work on the 5th floor: demise (e) office suite in half. Office t. I. This project consists of a new opening to expand an (e) office suite into an (e) adjacent office suite. Value: $20,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 5, 2012 | Expiration date: March 31, 2013 | Current use: Office | Permit id: 201204057649 | |||||
Install a complete new fire sprinkler system including pump and standpipes ref. 200704279921 Value: $645,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: February 9, 2009 | Expiration date: March 10, 2012 | Current use: Office | Permit id: 200902091727 | |||||
Revise extg background to show extg condition. No work. Add hi-lo water fountain. Revision to an extg permit #201101118232 Value: $3,500 Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 31, 2011 | Expiration date: March 25, 2012 | Current use: Office | Permit id: 201103313228 | |||||
Revision to approved app#200704279921 to roof framing steel. Value: $250,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 8, 2009 | Expiration date: April 10, 2010 | Current use: Office | Permit id: 200904085803 | |||||
Install new liquid nitrogen tank and enclosure. Concrete pad under 200908245406 Value: $20,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 20, 2010 | Expiration date: October 17, 2011 | Current use: Office | Permit id: 201007207044 | |||||
Bldg 3- connect new door holders being installed by others. Na compliance #155-13. Value: $1,100 Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 4, 2014 | Expiration date: February 27, 2015 | Current use: Office | Permit id: 201403049814 | |||||
Verify address Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 19, 2007 | Permit id: M87088 | |||||
Suite #125: interior ti. Remodel of existing spaces. Electrical upgrade to comply with title 24. New ada compliance kitchette. Maher n/a. Value: $165,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 3, 2014 | Expiration date: August 18, 2017 | Current use: Office | Permit id: 201409035284 | |||||
3rd floor:soft demolition constuction of new partitions and mep upgrades for new offices. N/a for maher 155-13. Fire sprinkler under deferred submittal Value: $33,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 30, 2014 | Expiration date: August 17, 2015 | Current use: Office | Permit id: 201406300071 | |||||
Revision to appl #2007. 0427. 9921 to delete interior warm shell work for future tenant improvement work. Value: $35,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 19, 2008 | Expiration date: September 14, 2009 | Current use: Office | Permit id: 200809192113 | |||||
Card access control system on 1st 3rd and 4th floor. Permit reqd due to card access conrol in elev. Lobbies on 3rd and 4th fl. Including freight. Emergency dr releases will be installed at cardaccess controlled ele. Lobby doors. Edr will also be installed for roof cr door Value: $31,996 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 6, 2010 | Expiration date: October 1, 2011 | Current use: Office | Permit id: 201010062420 | |||||
Installation of research and development dna synthesis equipment and supporting chemical supply cabinet into existing laboratory. Laboratory is equipped with cda and ventilation. Mechanical installaton will include ducting to existing building ventilation with connection to existing domestic 110v Value: $12,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 6, 2014 | Expiration date: March 30, 2015 | Current use: Clinics-medic/dental | Permit id: 201402067993 | |||||
Install 32 new ceiling sprinklers from existing 1" outlets at lobby at 1st 2nd and 3rd floors. Value: $6,400 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 24, 2009 | Expiration date: September 19, 2010 | Current use: Office | Permit id: 200909247558 | |||||
Occupant load verification only in order to issue a sffd assembly permit. No builidng department plan review or inspections required. Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: November 16, 2010 | Expiration date: November 26, 2011 | Current use: Office | Permit id: 201011164995 | |||||
1st & 4th floor - design install program & test two (2) new fm-2 fire suppression pre action detection & control systems for 1st flr server room & 4th flr medical records room. Alarm trouble & supervisory signals monitored by main building fire alarm control panel. Value: $25,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 6, 2010 | Expiration date: May 1, 2011 | Current use: Office | Permit id: 201005061839 | |||||
Suite 125 - remodel of lab space including mechanical electrical and plumbing work. Ref: pa#2014-09-03-5284. Maher ord n/a. Value: $200,000 Permit type: Additions alterations or repairs | Permit status: Issued | Completion date: September 29, 2014 | Expiration date: November 24, 2017 | Current use: Office | Permit id: 201409297544 | |||||
5th floor -add 24 smoke detectors & 2 transponders to (e) fire alarm system Value: $8,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 15, 2010 | Expiration date: January 10, 2011 | Current use: Office | Permit id: 201001154815 | |||||
Tenant improvement for "quswami" suite #125. New b occupancy lab area & office improvements. Aprinkler & fire alarm under seperate permits Value: $750,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 11, 2011 | Expiration date: January 4, 2014 | Current use: Office | Permit id: 201101118232 | |||||
Revision to 200704279921. Changes to roof framing and minor structural changes. (structural work only) Value: $76,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 25, 2010 | Expiration date: June 23, 2011 | Current use: Office | Permit id: 201006255331 | |||||
1st floor-add 5 strobes 8 horn/strobes 2 duct detectors Value: $10,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 17, 2013 | Expiration date: October 12, 2014 | Current use: Office | Permit id: 201310179494 | |||||
Building 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. Bathrooms elevators and stairs are (e). Project will build office space for use of tenant. This project is on the 2nd flr. Of the (e) bdg. Life and safety under separate permit. Maher-not reqd Value: $2,831,125 Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 10, 2015 | Expiration date: February 25, 2019 | Current use: Office | Permit id: 201503100342 | |||||
Add new co2 fire suppression system to new process tool station. Ref. Job #201409035284. Value: $15,000 Permit type: Additions alterations or repairs | Permit status: Issued | Completion date: December 18, 2014 | Expiration date: February 13, 2016 | Current use: Office | Permit id: 201412184093 | |||||
Add 5 horn/strobes 1 strobe 2 smoke detectors and relocate 1 extg horn/strobe due to a tenant improvement on the 5th floor of bldg 3 Value: $4,500 Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 7, 2011 | Expiration date: July 1, 2012 | Current use: Office | Permit id: 201107079643 | |||||
Revision to app #201001215065 . Revising ceiling suspension system and seismic compressio structural/suspension details. See sheet 1a-930 Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 20, 2010 | Expiration date: September 15, 2011 | Current use: Office | Permit id: 201009201149 | |||||
Provide new sprinklers for sout east tenant build out. Add 24 sprinklers Value: $18,100 Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 25, 2011 | Expiration date: July 19, 2012 | Current use: Office | Permit id: 201107250953 | |||||
Revised as built drawings to reflect 2nd 4th floor card reader door with emergency egress button. Reference 201010062420 Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 13, 2010 | Expiration date: November 28, 2011 | Current use: Office | Permit id: 201010132934 | |||||
Add sheet metal exhaust ducts floor drain (1) icw line process cda n2 & o2 lines. N/a ordinance #155-13. Value: $45,256 Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 19, 2014 | Expiration date: May 15, 2015 | Current use: Clinics-medic/dental | Permit id: 201405196088 | |||||
Revision to applciation 200704279921. Patching of ground floor structural slab. Value: $25,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 1, 2009 | Expiration date: April 26, 2010 | Current use: Office | Permit id: 200905017471 | |||||
Addition of 7 wax coated pendents per new fume hoods. Value: $4,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 6, 2012 | Expiration date: June 1, 2013 | Current use: Office | Permit id: 201206061917 | |||||
2nd floor: fire sprinkler t. I. 165 new heads off (e) shell sprinkler system. Ref. Appl. 2015. 0310. 0342. Maher n/a. Value: $43,586 Permit type: Otc alterations permit | Permit status: Issued | Completion date: April 3, 2015 | Expiration date: March 28, 2016 | Current use: Office | Permit id: 201504032775 | |||||
T. I. Fire sprinkler work. 1st floor. Provide new sprinklers for quswami t. I. Space. Adding 49 heads and special inspection for flex heads required. Revision to 201012217076 Value: $11,500 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 8, 2011 | Expiration date: February 3, 2012 | Current use: Office | Permit id: 201102089833 | |||||
Refer pa# 2010-0907-0290-structural support & base for signage approved Value: $5,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 13, 2010 | Expiration date: October 8, 2011 | Current use: Office | Permit id: 201010132922 | |||||
Bldg. 2 2/f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. N/a ordinance #155-13 Value: $1,300,000 Permit type: Otc alterations permit | Permit status: Filed | Completion date: October 5, 2016 | Current use: Office | Permit id: 201610059559 | |||||
Renew pa# 2007/01/09/1303 for final inspection only. Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 25, 2008 | Expiration date: December 25, 2008 | Current use: Vacant lot | Permit id: 200808250013 | |||||
Additiona to (e) fire alarm system for ti of floors 1 3 4 of buildng 3 Value: $29,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 30, 2010 | Expiration date: July 9, 2011 | Current use: Office | Permit id: 201006305627 | |||||
Bldg. 3- add 2 monitoring modules and increase cd of one existing horn/strobe due to t. I. On 1/f. T. I. Pa# 201409297544. N/a ordinance #155-13 Value: $1,500 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 6, 2015 | Expiration date: February 1, 2016 | Current use: Office | Permit id: 201502067669 | |||||
Addition of 52 pendent sprinklers per new ceiling and partition layout. Value: $9,800 Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 6, 2012 | Expiration date: June 1, 2013 | Current use: Office | Permit id: 201206061916 | |||||
Underground plumbing; saw cut slab per appl. #201001215065. Value: $15,000 Permit type: Otc alterations permit | Permit status: Filed | Completion date: March 15, 2010 | Current use: Office | Permit id: 201003158252 | |||||
1st/bldg #3-addition of 1 power supply 7 horn/strobes 1 strobe 2 smoke detectors 2 duct detectors & 1 monitoring module. Field verify that fsds and door holders were installed with permits; if not submit fsds and door holders on separate permit. Value: $8,027 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 25, 2011 | Expiration date: January 20, 2012 | Current use: Office | Permit id: 201101258974 | |||||
Minor revision to pa# 2010-0426-1048-r1-changes to bracing methods for acoustical ceiling minor revisions to notes partial 1st. Flr. Entire 3rd. Flr. & entire 4th. Flr. Value: $5,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 22, 2010 | Expiration date: September 17, 2011 | Current use: Office | Permit id: 201009221343 | |||||
2nd floor shell space ti. 5th fl design alteration to improve accoustical performance. Relocate area (all floors 2-5) of refuge from service elevator lobby to stairwell 1. Ref app: 201001215065 ada full compliance under pa #201001215065 Value: $300,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 25, 2010 | Expiration date: June 16, 2013 | Current use: Office | Permit id: 201006255357 | |||||
#125- provide seismic bracing work for new equipment in space for pa#201409297544. N/a ordinance #155-13 Value: $6,000 Permit type: Otc alterations permit | Permit status: Issued | Completion date: January 16, 2015 | Expiration date: January 11, 2016 | Current use: Office | Permit id: 201501165968 | |||||
Revision to approved p. A.#2007/0427/9921 to include restrooms electrical telephome/data and fan rooms in buildings 3 on floors 2-5. New interior partitions in roof penthouse. Value: $220,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 29, 2010 | Expiration date: May 23, 2013 | Current use: Office | Permit id: 201003299172 | |||||
Bldg 3 - add 3-power supplies 4-manual alarms 10-smoke detectors 6-duct detectors 30-horn/strobes 9-strobes 1-relay & 3-monitoring module in bldg.#3. Value: $14,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 22, 2010 | Expiration date: June 25, 2011 | Current use: Office | Permit id: 201006225021 | |||||
Relocate 5 plug off 1 fire sprinkler. Ref app#201406300071 Value: $2,000 Permit type: Otc alterations permit | Permit status: Issued | Completion date: October 15, 2014 | Expiration date: October 10, 2015 | Current use: Office | Permit id: 201410158899 | |||||
Vinyl sticker installed on window - 1401 & rock health. N/a maher ordinance Value: $497 Permit type: Wall or painted sign | Permit status: Filed | Completion date: December 15, 2015 | Current use: Office | Permit id: 201512155179 | |||||
Revision to appl #200704279921 installation of design build stairs #1 and #2. Value: $75,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 6, 2009 | Expiration date: August 9, 2010 | Current use: Office | Permit id: 200908064230 | |||||
1st floor lab: relocate 1 head and add 1 head. Total 2 heads. T. I. App#201311273048 Value: $4,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: December 12, 2014 | Expiration date: December 7, 2015 | Current use: Office | Permit id: 201412123621 | |||||
Construction of temporary office trailer. Value: $10,000 Permit type: New construction wood frame | Permit status: Filed | Completion date: September 4, 2008 | Permit id: 200809040773 | |||||
Tenant improvement fire sprinkler work at 5th floor innova adding 49 sprinklers with flexhead drops. Elimanating above ceiling heads-same 4 same. App#201105276990- structural report attached and special inspection required Value: $24,300 Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 14, 2011 | Expiration date: June 8, 2012 | Current use: Office | Permit id: 201106148081 | |||||
Electrical only for pa# 2010/01/21/5065 (arch.) Value: $1,500,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 17, 2010 | Expiration date: May 17, 2013 | Current use: Office | Permit id: 201003178440 | |||||
Installation of lab equipment & associated mep connections. Reference p/a#201210051422. Compliance with ordinance no. 155-13 not required. Value: $10,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 10, 2014 | Expiration date: June 15, 2015 | Current use: Clinics-medic/dental | Permit id: 201404102927 | |||||
Erect 5 stories office/lab Value: $19,950,000 Permit type: New construction | Permit status: Complete | Completion date: April 27, 2007 | Expiration date: September 28, 2011 | Permit id: 200704279921 | |||||
Bldg 3 1st floor suite 145 - adding 8 horn/strobes & 7 strobes due to tenant improvement. Value: $8,300 Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 31, 2012 | Expiration date: May 26, 2013 | Current use: Office | Permit id: 201205311562 | |||||
Mech./plumb. For pa# 2010/01/21/5065 (arch.). Value: $4,000,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 17, 2010 | Expiration date: May 4, 2014 | Current use: Office | Permit id: 201003178441 | |||||
Revision to approved p. A.#2009/0408/5803. Additional modification to roof structure. No visible change to building from street view. Value: $150,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 19, 2009 | Expiration date: October 10, 2012 | Current use: Office | Permit id: 200910199241 | |||||
Bldg 3- add 1 power supply 1 manual alarm 4 smoke detectors 1 duct detector 27 horn/strobes & strobes as part of a t. I. For bldg. 3 2/f. Ref. To pa#201503100342. N/a ordinance #155-13 Value: $20,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 22, 2015 | Expiration date: April 16, 2016 | Current use: Office | Permit id: 201504224270 | |||||
1st floor-first time t. I-new shell space-create offices breakroom restrooms including drywall partitions suspended ceilings convenience kitchenette hvac electrical & lighting. Fire protection & fire alarm under seperate permits Value: $310,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 12, 2013 | Expiration date: June 30, 2016 | Current use: Office | Permit id: 201307121673 | |||||
1st floor - mechanical ductwork electrical power and lighting and plumbing for new gr fl office buildout. Ref 201307121673. Fire sprinkler separate Value: $80,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: November 21, 2013 | Expiration date: November 6, 2016 | Current use: Office | Permit id: 201311212556 | |||||
Minor revision to approved app#200902061572. Replace 3x9 pairs of doors with 4x9 doors with transom. Value: $2,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 14, 2010 | Expiration date: September 10, 2011 | Current use: Office | Permit id: 201009140868 | |||||
Evacuation maps for 5 floors (1 2 3 4 5) 22 signs. Value: $1,500 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 20, 2010 | Expiration date: October 15, 2011 | Current use: Office | Permit id: 201010203428 | |||||
Fire sprinkler ti all floors. 1055 heads added 128 heads relocated. Value: $275,000 Permit type: Additions alterations or repairs | Permit status: Expired | Completion date: April 9, 2009 | Expiration date: May 22, 2010 | Current use: Clinics-medic/dental | Permit id: 200904095908 | |||||
Revision to pa# 2009-0206-1572-deletion of louvers at retail space deletion of grease duct servicing retail Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 27, 2010 | Expiration date: October 22, 2011 | Current use: Retail sales | Permit id: 201010273807 | |||||
1st floor suite #125 bldg 3 - process piping plans not originally included in permit set for t. I. "quswami" project (appl #201101118232) to be reviewed & permitted separately (due to suggested by sffd inspector). Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 14, 2011 | Expiration date: February 9, 2012 | Current use: Office | Permit id: 201102140163 | |||||
Build minimum point of entry (mpoe) room on ground floor(for telephone internet equipment). Building under new construction pa# 2007. 04. 27. 9921. Mep under separate permit. Value: $4,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 19, 2009 | Expiration date: August 15, 2010 | Current use: Office | Permit id: 200908195130 | |||||
Demo e fixtures in room 124 infill door opening on corridor side. Install joisted drywall ceiling new lab casework new lab gas lines and hot/cold water. New 6" ducts to e 14" ducts and install new slide gate dampers. Connect 1w piping to e system. Minor electrical revisions Value: $170,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: November 27, 2013 | Expiration date: February 8, 2017 | Current use: Office | Permit id: 201311273048 | |||||
Support of custom wood ceiling Value: $15,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 16, 2013 | Expiration date: October 25, 2014 | Current use: Office | Permit id: 201310169391 | |||||
3 non illuminated ground signs Value: $5,000 Permit type: Sign-errect | Permit status: Complete | Completion date: September 7, 2010 | Expiration date: October 2, 2011 | Current use: Office | Permit id: 201009291889 | |||||
3rd floor - install flame atomic absorption spectrometer to include 1ea exhaust hood 2 - 11ov elec ckts 1 air line 1 acetylene line flam gas storage cabinet w/exhaust duct. 2 acetelyene tanks. L/s sprinklers on separate permit. Value: $10,000 Permit type: Additions alterations or repairs | Permit status: Issued | Completion date: October 5, 2012 | Expiration date: July 7, 2014 | Current use: Clinics-medic/dental | Permit id: 201210051422 | |||||
Bldg 3- addition of a security door with card reader within an existing passageway. N a ordinance #155-13 Date: May 4, 2015 Value: $10,000 Permit type: Otc alterations permit | Permit status: Filed | Expiration date: May 4, 2015 | Current use: Office | Permit id: 201505045233 | |||||
Fire alarm for t. I. Ref. P. A.#201001215065 (arch) & 2010031784 (elec) 5-flrs.; 1-expander card 6-pwr. Supply 6-fatc 5-pull station 40-sd 30-duct det. 14-control mod. 6-pam relay 40-speaker strobes 140-horn strobes 34-strobes 2-hazmat pull sta. 1-expl. Proof 2-expl. Proof detectors. Date: June 25, 2010 Value: $67,700 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: June 25, 2010 | Current use: Office | Permit id: 201006255352 | |||||
Add 9 horn strobes 1 strobe 1 smoke detectors and relocate 1 extg horn stobes due to a tenant improvement on the 5th floor of bldg 3 Date: July 7, 2011 Value: $6,200 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 7, 2011 | Current use: Office | Permit id: 201107079645 | |||||
Bldg #3 5th floor-addition of 11 horn strobes 5 strobes 4 smoke detectors 1 duct detector 1 module 1 relay and 1 remote test station as part of a prtial tenant improvement on the 5th floor. Date: December 29, 2010 Value: $7,600 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: December 29, 2010 | Current use: Office | Permit id: 201012297550 | |||||
T. I. Fire sprinkler work on 5th floor. Add relocate 4 sprinklers at 3rd rock ventures. Using flex heads special inspection required- revision to 201012217076 Date: February 8, 2011 Value: $13,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: February 8, 2011 | Current use: Office | Permit id: 201102089834 | |||||
Fire sprinkler work tenant improvement on 5th floor. Third rock ventures suite. Add relocatie 67 fire sprinklers. Special inspection required per ab-4. 27. Date: December 21, 2010 Value: $34,480 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: December 21, 2010 | Current use: Office | Permit id: 201012217076 | |||||
Suite 125 - remodel of lab space including mechanical electrical and plumbing work. Ref: pa#2014-09-03-5284. Maher ord n a. Date: September 29, 2014 Value: $200,000 Permit type: Additions alterations or repairs | Permit status: Issued | Expiration date: September 29, 2014 | Current use: Office | Permit id: 201409297544 | |||||
Revision to permit #2010-0426-1048; this drawing shows installation of emergency shutoff outside h3 h4 room on 1st floor of 455 mission bay south Date: October 6, 2010 Value: $4,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: October 6, 2010 | Current use: Office | Permit id: 201010062393 | |||||
Suite #125: interior ti. Remodel of existing spaces. Electrical upgrade to comply with title 24. New ada compliance kitchette. Maher n a. Date: September 3, 2014 Value: $165,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 3, 2014 | Current use: Office | Permit id: 201409035284 | |||||
3rd floor:soft demolition constuction of new partitions and mep upgrades for new offices. N a for maher 155-13. Fire sprinkler under deferred submittal Date: June 30, 2014 Value: $33,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: June 30, 2014 | Current use: Office | Permit id: 201406300071 | |||||
Add sheet metal exhaust ducts floor drain (1) icw line process cda n2 & o2 lines. N a ordinance #155-13. Date: May 19, 2014 Value: $45,256 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: May 19, 2014 | Current use: Clinics-medic/dental | Permit id: 201405196088 | |||||
1st floor-add 5 strobes 8 horn strobes 2 duct detectors Date: October 17, 2013 Value: $10,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: October 17, 2013 | Current use: Office | Permit id: 201310179494 | |||||
Add 5 horn strobes 1 strobe 2 smoke detectors and relocate 1 extg horn strobe due to a tenant improvement on the 5th floor of bldg 3 Date: July 7, 2011 Value: $4,500 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 7, 2011 | Current use: Office | Permit id: 201107079643 | |||||
Revision to app #201001215065 . Revising ceiling suspension system and seismic compressio structural suspension details. See sheet 1a-930 Date: September 20, 2010 Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: September 20, 2010 | Current use: Office | Permit id: 201009201149 | |||||
2nd floor: fire sprinkler t. I. 165 new heads off (e) shell sprinkler system. Ref. Appl. 2015. 0310. 0342. Maher n a. Date: April 3, 2015 Value: $43,586 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: April 3, 2015 | Current use: Office | Permit id: 201504032775 | |||||
Bldg. 2 2 f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. N a ordinance #155-13. Deferred submittal for fire alarm & fire sprinkler. Date: October 5, 2016 Value: $1,300,000 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: October 5, 2016 | Current use: Office | Permit id: 201610059559 | |||||
1 new h orn storbe and 2 new strobes added to existing notifier. Nfs2-30 as part of ti in building 3 2nd fl. 3 e horn strobes and 1 e strobe being relocated. 2 existing standard candela orn strobes being replaced with new high candela devices Date: December 22, 2016 Value: $8,392 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: December 22, 2016 | Current use: Office | Permit id: 201612225767 | |||||
Construction of shoring wall in association of bld construction at 1455 3rd maher na Date: December 22, 2016 Value: $25,000 Permit type: Otc alterations permit | Permit status: Filed | Expiration date: December 22, 2016 | Current use: Office | Permit id: 201612225734 | |||||
Renew pa# 2007 01 09 1303 for final inspection only. Date: August 25, 2008 Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: August 25, 2008 | Current use: Vacant lot | Permit id: 200808250013 | |||||
Bldg. 3- add 2 monitoring modules and increase cd of one existing horn strobe due to t. I. On 1 f. T. I. Pa# 201409297544. N a ordinance #155-13 Date: February 6, 2015 Value: $1,500 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: February 6, 2015 | Current use: Office | Permit id: 201502067669 | |||||
1st bldg #3-addition of 1 power supply 7 horn strobes 1 strobe 2 smoke detectors 2 duct detectors & 1 monitoring module. Field verify that fsds and door holders were installed with permits; if not submit fsds and door holders on separate permit. Date: January 25, 2011 Value: $8,027 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: January 25, 2011 | Current use: Office | Permit id: 201101258974 | |||||
#125- provide seismic bracing work for new equipment in space for pa#201409297544. N a ordinance #155-13 Date: January 16, 2015 Value: $6,000 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: January 16, 2015 | Current use: Office | Permit id: 201501165968 | |||||
Revision to approved p. A.#2007 0427 9921 to include restrooms electrical telephome data and fan rooms in buildings 3 on floors 2-5. New interior partitions in roof penthouse. Date: March 29, 2010 Value: $220,000 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: March 29, 2010 | Current use: Office | Permit id: 201003299172 | |||||
Bldg 3 - add 3-power supplies 4-manual alarms 10-smoke detectors 6-duct detectors 30-horn strobes 9-strobes 1-relay & 3-monitoring module in bldg.#3. Date: June 22, 2010 Value: $14,000 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: June 22, 2010 | Current use: Office | Permit id: 201006225021 | |||||
Vinyl sticker installed on window - 1401 & rock health. N a maher ordinance Date: December 15, 2015 Value: $497 Permit type: Wall or painted sign | Permit status: Filed | Expiration date: December 15, 2015 | Current use: Office | Permit id: 201512155179 | |||||
Electrical only for pa# 2010 01 21 5065 (arch.) Date: March 17, 2010 Value: $1,500,000 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: March 17, 2010 | Current use: Office | Permit id: 201003178440 | |||||
Installation of lab equipment & associated mep connections. Reference p a#201210051422. Compliance with ordinance no. 155-13 not required. Date: April 10, 2014 Value: $10,000 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: April 10, 2014 | Current use: Clinics-medic/dental | Permit id: 201404102927 | |||||
Erect 5 stories office lab Date: April 27, 2007 Value: $19,950,000 Permit type: New construction | Permit status: Complete | Expiration date: April 27, 2007 | Permit id: 200704279921 | |||||
Bldg 3 1st floor suite 145 - adding 8 horn strobes & 7 strobes due to tenant improvement. Date: May 31, 2012 Value: $8,300 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: May 31, 2012 | Current use: Office | Permit id: 201205311562 | |||||
Mech. Plumb. For pa# 2010 01 21 5065 (arch.). Date: March 17, 2010 Value: $4,000,000 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: March 17, 2010 | Current use: Office | Permit id: 201003178441 | |||||
Revision to approved p. A.#2009 0408 5803. Additional modification to roof structure. No visible change to building from street view. Date: October 19, 2009 Value: $150,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: October 19, 2009 | Current use: Office | Permit id: 200910199241 | |||||
Bldg 3- add 1 power supply 1 manual alarm 4 smoke detectors 1 duct detector 27 horn strobes & strobes as part of a t. I. For bldg. 3 2 f. Ref. To pa#201503100342. N a ordinance #155-13 Date: April 22, 2015 Value: $20,000 Permit type: Otc alterations permit | Permit status: Complete | Expiration date: April 22, 2015 | Current use: Office | Permit id: 201504224270 | |||||
Demo e fixtures in room 124 infill door opening on corridor side. Install joisted drywall ceiling new lab casework new lab gas lines and hot cold water. New 6" ducts to e 14" ducts and install new slide gate dampers. Connect 1w piping to e system. Minor electrical revisions Date: November 27, 2013 Value: $170,000 Permit type: Additions alterations or repairs | Permit status: Complete | Expiration date: November 27, 2013 | Current use: Office | Permit id: 201311273048 | |||||
3rd floor - install flame atomic absorption spectrometer to include 1ea exhaust hood 2 - 11ov elec ckts 1 air line 1 acetylene line flam gas storage cabinet w exhaust duct. 2 acetelyene tanks. L s sprinklers on separate permit. Date: October 5, 2012 Value: $10,000 Permit type: Additions alterations or repairs | Permit status: Issued | Expiration date: October 5, 2012 | Current use: Clinics-medic/dental | Permit id: 201210051422 | |||||
Install approximately 15 new receptacles. Provide electrical connection to 4 new fume hoods. Permit status: Complete | Permit id: Ew20120524501 | |||||
Install one new 208 volt amp receptacle in lab area. Permit status: Complete | Permit id: Ew20120312461 | |||||
Work at 455 mission bay south blvd. Bldng. 3 : connect office furniture to (e) power source. 5 receptacles. Permit status: Complete | Permit id: E201105124891 | |||||
Bldg #2: 5 floors of hvac controls (t-stats & vavs-127) Permit status: Complete | Permit id: E201008209475 | |||||
(5) floors: cei job #08-4461; lighting (1463) switches (431) receptacles (961) circuits (1200) panel switchboards (2) 2500a (1) 1600a (1) 800a (40) 225a (5) 150a feeders: (as for panels switch); special equipment: (1200a plug bus riser fused switches 1. 5 mw exterior generator base tank; fire alarm; (121) horn strobes (29) strobes (28) smoke detectors (33) duct detectors (50) speaker strobes ); temp pwr Permit status: Complete | Permit id: E200903258032 | |||||
Five pieces of equipment to hook up in two different labs. It is all 208v single phase or three phase. Permit status: Filed | Permit id: Ew20140409641 | |||||
Existing service to by used for construction office and temp power Permit status: Complete | Permit id: Ew20101115161 | |||||
Energy management system. Permit status: Complete | Permit id: E201009139908 | |||||
1st flr: lights 23 switches receptacles 126 circuits 2 panels switchboards; 2 feeders 1 bus tap 15 fire alarm devices quswami 1st flr cei job #10-4339 sb Permit status: Complete | Permit id: E201101272548 | |||||
New f a system: missoin bay freight elevator lobby: cei wo#218191cw. 2500sf. Permit status: Expired | Permit id: E201405059395 | |||||
Building 3: break glass station for haz-mat alarm (local alarm). Ref. Bldng. Permit applic. #2010-10-06-2393 Permit status: Complete | Permit id: E20101102940 | |||||
First floor server room: fm-2 fire suppression and pre-action detection & controls systems. Permit status: Complete | Permit id: E20101022750 | |||||
Install one 208v amp outlet in existing wiremold and one 120 208v outlet in pilot room. Permit status: Expired | Permit id: Ew20120523062 | |||||
121 cables; quswami 1st floor; cei job #11-4811 dc Permit status: Complete | Permit id: Ew20110405121 | |||||
Rock health (92)lights (21)switches (50)receptacles Permit status: Complete | Permit id: Ew20130817421 | |||||
77 lights; 17 switches; 39 receptacles; 25 circuits; panels switchboards - 3 panel boards 1 transformer 1 bus tap to 3 new panels; 23 fire alarm devices; third rock cei job #10-4327 sb Permit status: Complete | Permit id: Ew20101221841 | |||||
Relocate lights; add cut-in - 4 switches; fire alarm devices - (e) to remain utilize (e) fire alarm cut in 2 location 3 way switches; shift exit sign; rework switching of lighting; third rock; 5th floor; cei job #12-4-09669- sb Permit status: Complete | Permit id: Ew20120419681 | |||||
Energy management controls systems for hvac Permit status: Complete | Permit id: Ew20110629005 | |||||
93 lights; 22 switches; 47 receptacles; circuits; existing panels switchboards; 19 fire alarm devices; orbidmed 5th floor cei job #11-4208 sb Permit status: Complete | Permit id: Ew20110209401 | |||||
Modular office furniture: 22 workstations ais site contact: james talus (510) 774-9886 note: building 2 Permit status: Complete | Permit id: Ew20101022142 | |||||
22 cables; are conference rooms 5th floor; cei wo #205708 dc Permit status: Issued | Permit id: Ew20110405141 | |||||
Install 66 cables Permit status: Complete | Permit id: Ew20131114001 | |||||
1 - 1 a panel 1 - kva trans; bayer mission bay 1st floor; cei wo #213571 cw Permit status: Complete | Permit id: Ew20130123081 | |||||
Fourth floor medical records room: fm-2 fire suppression & pre-action detection & controls systems. Permit status: Complete | Permit id: E20101022751 | |||||
Modular office furniture: workstations ais site contact: james talus (510) 774-9886 note: building 2 Permit status: Complete | Permit id: Ew20101021981 | |||||
5th floor; temp power; light (266) switches (39) receptacles (59) circuits (74). Panel switchboards (8 7) feeders(18) special equipment 1600a ats & 100a ats fire alram (23) Permit status: Complete | Permit id: Ew20100520841 | |||||
Modular office installation: 32 workstations ais site contact: james talus (510) 774-9886 Permit status: Complete | Permit id: Ew20101102261 | |||||
Card access control panel tied to (1) dedicated 110v circuit. Access control panel. Permit status: Complete | Permit id: E20101022762 | |||||
82 lights; 42 switches; receptacles;128 circuits; 2 panels switchboards; 6 feeders; 13 fire alarm devices; innova 5th floor; cei job #11-42 sb Permit status: Complete | Permit id: Ew20110603401 | |||||
Mechanical penthouse: 3 phase 480v reactor in-line with a chiller 4 service 4 feeders (2) transformers 3 phase 480v reactor 4 0 Permit status: Complete | Permit id: E201003306389 | |||||
1st floor lobby security equipment room: card access controller system. Power from one central location for our controllers. Permit status: Complete | Permit id: E201004066536 | |||||
Area of rufuge call boxes (8) locations. Located in (2) stairwells on floors 2 3 4&5. (4) call boxes in each stairwell Permit status: Complete | Permit id: Ew20101011161 | |||||
Modular office furniture: 15 workstations ais site contact: keith leavy (510) 774-9887 Permit status: Complete | Permit id: Ew20101029742 | |||||
1st flr: temp 514 power lighting 225 switches 554 receptacles 227 circuits panel switchboard feeders 16 special eqpt 7 furniture partition connections fire alarm 362 cei job 10. 4244 eb Permit status: Complete | Permit id: E201005217544 | |||||
Install new 125volt l5- receptacle in server room. Install new 250volt 6- receptacle for existing oven. Permit status: Complete | Permit id: Ew20131121721 | |||||
8 lights; 3 switches; 7 receptacles; 2 circuits; cei wo #220781 cw Permit status: Complete | Permit id: Ew20141017401 | |||||
1st floor server & 4th floor medical records: life safety witness test. Permit status: Complete | Permit id: E20101029886 | |||||
5th and roof: energy mgt hvac controls and low voltage wiring systems Permit status: Expired | Permit id: E201003306388 | |||||
Tenant improvement consisting of new light fixtures switches and receptacles. Permit status: Complete | Permit id: Ew20140917941 | |||||
Modular furniture installation Permit status: Complete | Permit id: Ew20150727761 | |||||
Work to be done in building 2: t. I. Build out for 5 floors of office and lab space. (2) 4 & (1) 125 4 lights switches 3 receptacles 2 fans 1 dishwasher 1 garbage disposal 2 microwaves misc. Lab equipment fume hoods glass wash etc. Permit status: Complete | Permit id: E201004056487 | |||||
Lights; 19 switches; receptacles; 42 circuits in panel; 1 panel switchboard; 1 feeder; 8 fire alarm devices; vc spec suite 5th floor; cei job #11-4249 sb Permit status: Complete | Permit id: Ew20110714761 | |||||
Cables; v c offices 5th floor; cei lv wo #207296 dc Permit status: Complete | Permit id: Ew20110801341 | |||||
Card access control panels tied into (1) dedicated 110v circuit. Access control panel(s). Permit status: Complete | Permit id: E20101022763 | |||||
Communications cabling services Permit status: Complete | Permit id: Ew20150610341 | |||||
Office ti buildout including (231) lights; (7) switches; (84) receptacles; (1) 600a-480v; parallel 350mcm (1) 200a-480v with 3 feeder; (1) 600a-480v dist. Panel (2) 200a-480v panel (1) 225a ats (1) 22. 5 mini power center (2) 120 208v panels; (1) 75kva transformer; lutron & wattstopper controls for t-24 @ nektar therapeutics - 455 mission bay south 2nd floor Permit status: Complete | Permit id: Ew20150427841 | |||||
66 lights; 16 switches; 61 receptacles; 126 circuits; 3 panels 2 transformers; 2 feeders; 29 fire alarm devices; bayer incubator; 1st floor; cei job #12-4-09403- sb Permit status: Complete | Permit id: Ew20120524581 | |||||
1 cables; bayer 1st floor; cei job # 12-4-10117- dc Permit status: Complete | Permit id: Ew20120621561 | |||||
1st and 4th floor: bldg. 2 west wing - first floor server & fourth floor medical records: witness test Permit status: Cancelled | Permit id: E201005067214 | |||||
2 receptacles; 2 circuits - bayer lab 322c; cei wo #223593 -pm-carl winther Permit status: Expired | Permit id: Ew20150414261 | |||||
5 stations of modular partitions on the 1st floor. Permit status: Cancelled | Permit id: Ew20110415101 | |||||
Install data cables on th3 1st 2nd 3rd 4th and 5th floor. Permit status: Complete | Permit id: E201005257596 | |||||
Ste 575. Install 44 category 6 cables to designated locations. Permit status: Complete | Permit id: E201102142864 | |||||
Connect new card readers to customers existing system Permit status: Filed | Permit id: Ew20150803821 | |||||
Modular office furniture: 15 workstations ais site contact: keith leavy (510) 774-9887 Permit status: Complete | Permit id: Ew20101029741 | |||||
Modular office furniture: workstations ais site contact: james talus (510) 774-9886 note: building 2 Permit status: Complete | Permit id: Ew20101021121 | |||||
Energy management system. Permit status: Complete | Permit id: E201102182967 | |||||
Building 3: break glass station for haz-mat alarm (local alarm). Ref. Bldg. Permit applciation 201001215065 Permit status: Complete | Permit id: Ew20101111727 | |||||
Modular office furniture: 29 workstations ais site contact: james talus (510) 774-9886 Permit status: Complete | Permit id: Ew20101102262 | |||||
64 cables; innova 5th flr cei wo #206635 dc Permit status: Expired | Permit id: Ew20110607121 | |||||
1st floor: 1 lights receptacles service: 2 - 4 a; feeders: same; panelboard 43; transformers 2 - 75kva; underground underslab - 5 story core and shell; other equpment: elevators Permit status: Complete | Permit id: E200810152504 | |||||
Install 1 ckt 1 transformer & 2 panelboards 400amp. Permit status: Cancelled | Permit id: E201509211648 | |||||
Installation of 12 modular workstations Permit status: Complete | Permit id: Ew20121030202 | |||||
2 lights; 1 switch; 6 receptacles; 6 circuits; bayer lab 124 renovations; cei wo #217618 cw Permit status: Complete | Permit id: Ew20140226981 | |||||
13 cables; orbidmed 5th floor; cei job #11-4813 dc. Permit status: Complete | Permit id: E201103163596 | |||||
Energy management control systems for hvac Permit status: Complete | Permit id: Ew20110111741 | |||||
13 cables; orbidmed; 5th floor; cei job #11-4813 dc Permit status: Expired | Permit id: E201103163595 | |||||
Provide (1) 30kva ups and (1) 225a panelboard to existing lab space. Provide additional standby power for lab equipment Permit status: Expired | Permit id: Ew20150211561 | |||||
Provide new and relocated power for lab equipment in 16 square foot area. No lighting changes. Permit status: Complete | Permit id: Ew20141210961 | |||||
2n Permit status: Filed | Permit id: Ew201701052754 | |||||
1 f:addheadonflexdropandreocate(1)existingflexdropforfiresprinklers. Date: December 12, 2014 Permit status: Complete | Expiration date: December 12, 2014 | Permit id: Pp20141212464 | |||||
5thfloor unit513-removebackflowdevice&capwaterlineinglasswashroom513 Date: June 23, 2014 Permit status: Complete | Expiration date: June 23, 2014 | Permit id: Pp20140623721 | |||||
Buildingservices:sewer. Vent domesticandreclaimedwaterandgas-5floorsandroof Date: July 30, 2010 Permit status: Complete | Expiration date: July 30, 2010 | Permit id: Pp20100730828 | |||||
Plumbing&processgasinstallationfor5floors. Date: May 25, 2010 Permit status: Complete | Expiration date: May 25, 2010 | Permit id: Pp20100525290 | |||||
T. I. Firesprinklersatquswamion1stfloor. Date: February 8, 2011 Permit status: Complete | Expiration date: February 8, 2011 | Permit id: Pp20110208913 | |||||
5thfloor-tenantimprovement-add relocate67firesprinklers Date: December 21, 2010 Permit status: Expired | Expiration date: December 21, 2010 | Permit id: Pp20101221918 | |||||
Plumbingfortenantimprovementprojectunderbuildingpermit#201203206482. Date: May 24, 2012 Permit status: Complete | Expiration date: May 24, 2012 | Permit id: Pp20120524856 | |||||
2ndfloor:firesprinklertenantimprovement. Date: June 6, 2012 Permit status: Complete | Expiration date: June 6, 2012 | Permit id: Pp20120606129 | |||||
Workcategory:5p;provideroughandfinishplumbingfornewrestrooms tenantsinkandcondensatepiping 1stfloor. Ar&bjob#13-120 Date: September 5, 2013 Permit status: Complete | Expiration date: September 5, 2013 | Permit id: Pw20130905157 | |||||
Workcategory:5p;remove(1)existinglabsink re-workdrain&venttoserve(2)newlabbenches. Capoffexistingfloorsink re-workdrain&venttoserve(1)newwetbench. Relocateexistingemergencyeyewash showercombo addnew(1)newtemperedwaterheatertoserveemergencyeyewash. Date: December 11, 2014 Permit status: Expired | Expiration date: December 11, 2014 | Permit id: Pw20141211577 | |||||
Workcategory:5p;relocate(1)existingbreakroomsink install(1)dishwasher install(1)coldwaterlinetorefrigerator install(1)newinstantflowwaterheater Date: September 4, 2014 Permit status: Complete | Expiration date: September 4, 2014 | Permit id: Pw20140904916 | |||||
Tenantimprovementforfiresprinklers Date: June 14, 2011 Permit status: Complete | Expiration date: June 14, 2011 | Permit id: Pp20110614872 | |||||
Sitestormdrainage sewerandwater Date: November 14, 2008 Permit status: Expired | Expiration date: November 14, 2008 | Permit id: Pp20081114442 | |||||
Plumbingfor2buildings 5storieseach coldshellonly allfixturesarewiththetenantpackage. Date: October 22, 2008 Permit status: Expired | Expiration date: October 22, 2008 | Permit id: Pp20081022398 | |||||
Workcategory:2pb;installplumbingandprocessfornewsinksandequipment. Date: January 26, 2011 Permit status: Complete | Expiration date: January 26, 2011 | Permit id: Pw20110126705 | |||||
Workcategory:5p;installationoflabsinkandsafetyshower Date: June 18, 2012 Permit status: Complete | Expiration date: June 18, 2012 | Permit id: Pw20120618724 | |||||
Workcategory:5p;provideandinstall(3)newbreakroomsinks Date: April 21, 2015 Permit status: Complete | Expiration date: April 21, 2015 | Permit id: Pw20150421757 | |||||
Workcategory:2pa;plumbingfornewlabandoffices Date: June 15, 2011 Permit status: Complete | Expiration date: June 15, 2011 | Permit id: Pw20110615005 | |||||
Workcategory:4pb;installfiresprinklersatlobbyandoffice Date: September 24, 2013 Permit status: Complete | Expiration date: September 24, 2013 | Permit id: Pw20130924637 | |||||
Workcategory:4pb;firesprinklers-install165newheadsoffexistingshellsystem Date: April 3, 2015 Permit status: Complete | Expiration date: April 3, 2015 | Permit id: Pw20150403321 | |||||
Block26 building3:tenantimprovement:add relocate562firesprinklers. Date: August 20, 2010 Permit status: Complete | Expiration date: August 20, 2010 | Permit id: Pp20100820289 | |||||
Watertest(4)showerpans. Date: August 30, 2010 Permit status: Complete | Expiration date: August 30, 2010 | Permit id: Pp20100830473 | |||||
Workcategory:5p;newchilledandheatingwaterpipe Date: May 7, 2015 Permit status: Complete | Expiration date: May 7, 2015 | Permit id: Pw20150507156 | |||||
T. I. Firesprinklersat5thfloor3rdrock. Date: February 8, 2011 Permit status: Complete | Expiration date: February 8, 2011 | Permit id: Pp20110208909 | |||||
Installing1sink addiing2vacuumlines co2line&oxygenline tyingintoexistingmainline Date: February 25, 2014 Permit status: Complete | Expiration date: February 25, 2014 | Permit id: Pp20140225472 | |||||
Relocate2firesprinklers. Date: February 27, 2014 Permit status: Complete | Expiration date: February 27, 2014 | Permit id: Pp20140227531 | |||||
3 f:relocate5 plugoff1firesprinkler. Date: October 15, 2014 Permit status: Expired | Expiration date: October 15, 2014 | Permit id: Pp20141015984 | |||||
Undergroundfiresprinklerfromstreetstubbedintobuildingandcapped9"aboveslab. Forfuturefiresprinklersystemsfor(5)stories. Date: December 18, 2008 Permit status: Issued | Expiration date: December 18, 2008 | Permit id: Pp20081218783 | |||||
5 f:install(1)drain (1)vent&processpipingforhoodinstallation. Date: May 22, 2014 Permit status: Complete | Expiration date: May 22, 2014 | Permit id: Pp20140522951 | |||||
Installationof(1)domestichotwaterand(2)hydronicboilers Date: December 6, 2010 Permit status: Complete | Expiration date: December 6, 2010 | Permit id: Pp20101206577 | |||||
Installfiresprinklersystemforentireproject standpipe pump etc Date: February 10, 2009 Permit status: Expired | Expiration date: February 10, 2009 | Permit id: Pp20090210105 | |||||
Workcategory:11p;installationofnewfivedewerln2switchovermanifold installationofnewn2distributionsystemto(12)locationsinoneroom Date: August 8, 2013 Permit status: Complete | Expiration date: August 8, 2013 | Permit id: Pw20130808504 | |||||
Useofpvcsch40okforug undergroundplumref201001215065 Date: March 16, 2010 Permit status: Complete | Expiration date: March 16, 2010 | Permit id: Pp20100316671 | |||||
Building#3-buildingappl.#201004261048-tenantimprovementforbayerforthe1st 3rdand4thfloors-plumbingforlabsandoffices. Date: May 24, 2010 Permit status: Complete | Expiration date: May 24, 2010 | Permit id: Pp20100524225 | |||||
Workcategory:2pa;installdrinkingfountainandbreakroomsinkon5thfloor Date: March 2, 2011 Permit status: Complete | Expiration date: March 2, 2011 | Permit id: Pw20110302310 | |||||
Workinsuite145:firesprinklertenantimprovement. Date: June 6, 2012 Permit status: Complete | Expiration date: June 6, 2012 | Permit id: Pp20120606128 | |||||
Workcategory:2pa;plumbingfornewbreakroomsinkandfloorsink. Date: December 27, 2010 Permit status: Complete | Expiration date: December 27, 2010 | Permit id: Pw20101227186 | |||||
Workcategory:4pa;addonefiresprinklerheadatceilingtoaccomodatenewdemisingwall. Date: April 25, 2012 Permit status: Complete | Expiration date: April 25, 2012 | Permit id: Pw20120425702 | |||||
Workcategory:5p;installationofplumbingandprocesspipingwithplumbingfixturesoneachfloor Date: April 14, 2009 Permit status: Complete | Expiration date: April 14, 2009 | Permit id: Pw20090414360 | |||||
Workcategory:4pb;installsprinklersatlobby. Date: September 24, 2009 Permit status: Complete | Expiration date: September 24, 2009 | Permit id: Pw20090924647 | |||||
Providenewfiresprinklersforsoutheasttenantbuildout. Add24sprinklers Date: July 25, 2011 Permit status: Complete | Expiration date: July 25, 2011 | Permit id: Pp20110725778 | |||||
Workcategory:2pa;rough-inwasteandwaterforone(1)futuresink. Date: July 27, 2011 Permit status: Complete | Expiration date: July 27, 2011 | Permit id: Pw20110727755 | |||||
Workcategory:4pb;firesprinklertenantimprovementfornewofficesandlabs. Date: April 20, 2010 Permit status: Complete | Expiration date: April 20, 2010 | Permit id: Pw20100420871 | |||||
T iadd(1055)heads&relocate(128)heads. Date: April 9, 2009 Permit status: Expired | Expiration date: April 9, 2009 | Permit id: Pp20090409522 | |||||
Workcategory:2pa;adddrinkingfountain. Date: April 18, 2011 Permit status: Complete | Expiration date: April 18, 2011 | Permit id: Pw20110418088 | |||||
Workcategory:5p;equipmentgasconnectionsanddomesticwatertopenthouse. Date: January 19, 2010 Permit status: Complete | Expiration date: January 19, 2010 | Permit id: Pw20100119270 | |||||
Workcategory:5m;installationofnew45-tonwatercooledchillertoactasredundantprocesschillerforexisting. New10-hpmotortoactasredundantforexistingpump. Hottappipeconnectionsforinstallation Date: March 19, 2014 Permit status: Complete | Expiration date: March 19, 2014 | Permit id: Pmw20140319788 | |||||
Hvacinstallationfor5floors. Date: May 25, 2010 Permit status: Complete | Expiration date: May 25, 2010 | Permit id: Pm20100525288 | |||||
Workcategory:5m;add(1)newvavbox reworksupplyductingtoservenewlayoutwithhepafilters reworkexhaust remove(1)fumehood addprocessgaspipingfromexistingmainstopointsofuseinlabs addnewnitrogenswitchovermanifold&(2)heliumsupplies&(1)oxyensupply reworkdiwaterlinestoserve(3)newtools addsolventdelivery&wastelineindoublecontainmentfromwasteroomtolab Date: December 11, 2014 Permit status: Expired | Expiration date: December 11, 2014 | Permit id: Pmw20141211580 | |||||
Connect new card readers to customers existing system Permit status: Filed | Permit id: Ew20150803821 | |||||
Install data cables on th3 1st 2nd 3rd 4th and 5th floor. Permit status: Complete | Permit id: E201005257596 | |||||
1 cables; bayer 1st floor; cei job # 12-4-10117- dc Permit status: Complete | Permit id: Ew20120621561 | |||||
Office ti buildout including (231) lights; (7) switches; (84) receptacles; (1) 600a-480v; parallel 350mcm (1) 200a-480v with 3 feeder; (1) 600a-480v dist. Panel (2) 200a-480v panel (1) 225a ats (1) 22. 5 mini power center (2) 120 208v panels; (1) 75kva transformer; lutron & wattstopper controls for t-24 @ nektar therapeutics - 455 mission bay south 2nd floor Permit status: Complete | Permit id: Ew20150427841 | |||||
Communications cabling services Permit status: Complete | Permit id: Ew20150610341 | |||||
Card access control panels tied into (1) dedicated 110v circuit. Access control panel(s). Permit status: Complete | Permit id: E20101022763 | |||||
Cables; v c offices 5th floor; cei lv wo #207296 dc Permit status: Complete | Permit id: Ew20110801341 | |||||
Lights; 19 switches; receptacles; 42 circuits in panel; 1 panel switchboard; 1 feeder; 8 fire alarm devices; vc spec suite 5th floor; cei job #11-4249 sb Permit status: Complete | Permit id: Ew20110714761 | |||||
Modular furniture installation Permit status: Complete | Permit id: Ew20150727761 | |||||
Tenant improvement consisting of new light fixtures switches and receptacles. Permit status: Complete | Permit id: Ew20140917941 | |||||
5th and roof: energy mgt hvac controls and low voltage wiring systems Permit status: Expired | Permit id: E201003306388 | |||||
1st floor server & 4th floor medical records: life safety witness test. Permit status: Complete | Permit id: E20101029886 | |||||
Work to be done in building 2: t. I. Build out for 5 floors of office and lab space. (2) 4 & (1) 125 4 lights switches 3 receptacles 2 fans 1 dishwasher 1 garbage disposal 2 microwaves misc. Lab equipment fume hoods glass wash etc. Permit status: Complete | Permit id: E201004056487 | |||||
1st and 4th floor: bldg. 2 west wing - first floor server & fourth floor medical records: witness test Permit status: Cancelled | Permit id: E201005067214 | |||||
8 lights; 3 switches; 7 receptacles; 2 circuits; cei wo #220781 cw Permit status: Complete | Permit id: Ew20141017401 | |||||
Install new 125volt l5- receptacle in server room. Install new 250volt 6- receptacle for existing oven. Permit status: Complete | Permit id: Ew20131121721 | |||||
1st flr: temp 514 power lighting 225 switches 554 receptacles 227 circuits panel switchboard feeders 16 special eqpt 7 furniture partition connections fire alarm 362 cei job 10. 4244 eb Permit status: Complete | Permit id: E201005217544 | |||||
Area of rufuge call boxes (8) locations. Located in (2) stairwells on floors 2 3 4&5. (4) call boxes in each stairwell Permit status: Complete | Permit id: Ew20101011161 | |||||
Mechanical penthouse: 3 phase 480v reactor in-line with a chiller 4 service 4 feeders (2) transformers 3 phase 480v reactor 4 0 Permit status: Complete | Permit id: E201003306389 | |||||
82 lights; 42 switches; receptacles;128 circuits; 2 panels switchboards; 6 feeders; 13 fire alarm devices; innova 5th floor; cei job #11-42 sb Permit status: Complete | Permit id: Ew20110603401 | |||||
Card access control panel tied to (1) dedicated 110v circuit. Access control panel. Permit status: Complete | Permit id: E20101022762 | |||||
Modular office installation: 32 workstations ais site contact: james talus (510) 774-9886 Permit status: Complete | Permit id: Ew20101102261 | |||||
5th floor; temp power; light (266) switches (39) receptacles (59) circuits (74). Panel switchboards (8 7) feeders(18) special equipment 1600a ats & 100a ats fire alram (23) Permit status: Complete | Permit id: Ew20100520841 | |||||
Install 66 cables Permit status: Complete | Permit id: Ew20131114001 | |||||
22 cables; are conference rooms 5th floor; cei wo #205708 dc Permit status: Issued | Permit id: Ew20110405141 | |||||
Modular office furniture: 22 workstations ais site contact: james talus (510) 774-9886 note: building 2 Permit status: Complete | Permit id: Ew20101022142 | |||||
77 lights; 17 switches; 39 receptacles; 25 circuits; panels switchboards - 3 panel boards 1 transformer 1 bus tap to 3 new panels; 23 fire alarm devices; third rock cei job #10-4327 sb Permit status: Complete | Permit id: Ew20101221841 | |||||
Rock health (92)lights (21)switches (50)receptacles Permit status: Complete | Permit id: Ew20130817421 | |||||
66 lights; 16 switches; 61 receptacles; 126 circuits; 3 panels 2 transformers; 2 feeders; 29 fire alarm devices; bayer incubator; 1st floor; cei job #12-4-09403- sb Permit status: Complete | Permit id: Ew20120524581 | |||||
First floor server room: fm-2 fire suppression and pre-action detection & controls systems. Permit status: Complete | Permit id: E20101022750 | |||||
Relocate lights; add cut-in - 4 switches; fire alarm devices - (e) to remain utilize (e) fire alarm cut in 2 location 3 way switches; shift exit sign; rework switching of lighting; third rock; 5th floor; cei job #12-4-09669- sb Permit status: Complete | Permit id: Ew20120419681 | |||||
Building 3: break glass station for haz-mat alarm (local alarm). Ref. Bldng. Permit applic. #2010-10-06-2393 Permit status: Complete | Permit id: E20101102940 | |||||
1 - 1 a panel 1 - kva trans; bayer mission bay 1st floor; cei wo #213571 cw Permit status: Complete | Permit id: Ew20130123081 | |||||
New f a system: missoin bay freight elevator lobby: cei wo#218191cw. 2500sf. Permit status: Expired | Permit id: E201405059395 | |||||
1st flr: lights 23 switches receptacles 126 circuits 2 panels switchboards; 2 feeders 1 bus tap 15 fire alarm devices quswami 1st flr cei job #10-4339 sb Permit status: Complete | Permit id: E201101272548 | |||||
Energy management system. Permit status: Complete | Permit id: E201009139908 | |||||
Existing service to by used for construction office and temp power Permit status: Complete | Permit id: Ew20101115161 | |||||
Five pieces of equipment to hook up in two different labs. It is all 208v single phase or three phase. Permit status: Filed | Permit id: Ew20140409641 | |||||
(5) floors: cei job #08-4461; lighting (1463) switches (431) receptacles (961) circuits (1200) panel switchboards (2) 2500a (1) 1600a (1) 800a (40) 225a (5) 150a feeders: (as for panels switch); special equipment: (1200a plug bus riser fused switches 1. 5 mw exterior generator base tank; fire alarm; (121) horn strobes (29) strobes (28) smoke detectors (33) duct detectors (50) speaker strobes ); temp pwr Permit status: Complete | Permit id: E200903258032 | |||||
Bldg #2: 5 floors of hvac controls (t-stats & vavs-127) Permit status: Complete | Permit id: E201008209475 | |||||
Install one new 208 volt amp receptacle in lab area. Permit status: Complete | Permit id: Ew20120312461 | |||||
Install approximately 15 new receptacles. Provide electrical connection to 4 new fume hoods. Permit status: Complete | Permit id: Ew20120524501 | |||||
Energy management controls systems for hvac Permit status: Complete | Permit id: Ew20110629005 | |||||
Modular office furniture: 15 workstations ais site contact: keith leavy (510) 774-9887 Permit status: Complete | Permit id: Ew20101029742 | |||||
5 stations of modular partitions on the 1st floor. Permit status: Cancelled | Permit id: Ew20110415101 | |||||
Ste 575. Install 44 category 6 cables to designated locations. Permit status: Complete | Permit id: E201102142864 | |||||
121 cables; quswami 1st floor; cei job #11-4811 dc Permit status: Complete | Permit id: Ew20110405121 | |||||
Work at 455 mission bay south blvd. Bldng. 3 : connect office furniture to (e) power source. 5 receptacles. Permit status: Complete | Permit id: E201105124891 | |||||
93 lights; 22 switches; 47 receptacles; circuits; existing panels switchboards; 19 fire alarm devices; orbidmed 5th floor cei job #11-4208 sb Permit status: Complete | Permit id: Ew20110209401 | |||||
2 receptacles; 2 circuits - bayer lab 322c; cei wo #223593 -pm-carl winther Permit status: Expired | Permit id: Ew20150414261 | |||||
1st floor lobby security equipment room: card access controller system. Power from one central location for our controllers. Permit status: Complete | Permit id: E201004066536 | |||||
Modular office furniture: workstations ais site contact: james talus (510) 774-9886 note: building 2 Permit status: Complete | Permit id: Ew20101021981 | |||||
Install one 208v amp outlet in existing wiremold and one 120 208v outlet in pilot room. Permit status: Expired | Permit id: Ew20120523062 | |||||
Fourth floor medical records room: fm-2 fire suppression & pre-action detection & controls systems. Permit status: Complete | Permit id: E20101022751 | |||||
2nd floor fire sprinkler t. I. - relocate 8 pendent heads & add one upright head. Ref pa #201610059559. N a maher ordinance Date: January 20, 2017 Value: $10,975 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: January 20, 2017 | Current use: Office | Permit id: 201701207547 | |||||
Building 3: break glass station for haz-mat alarm (local alarm). Ref. Bldg. Permit applciation 201001215065 Permit status: Complete | Permit id: Ew20101111727 | |||||
Modular office furniture: 29 workstations ais site contact: james talus (510) 774-9886 Permit status: Complete | Permit id: Ew20101102262 | |||||
Energy management system. Permit status: Complete | Permit id: E201102182967 | |||||
Modular office furniture: workstations ais site contact: james talus (510) 774-9886 note: building 2 Permit status: Complete | Permit id: Ew20101021121 | |||||
Modular office furniture: 15 workstations ais site contact: keith leavy (510) 774-9887 Permit status: Complete | Permit id: Ew20101029741 | |||||
Fire sprinkler relocate 8 pendent heads add 1 upright head Date: January 20, 2017 Permit status: Issued | Expiration date: January 20, 2017 | Permit id: Pp20170120332 | |||||
Work category: 5p; converting existing office space into laboratories. Adding emergency eye wash and emergency shower. Date: January 9, 2017 Permit status: Issued | Expiration date: January 9, 2017 | Permit id: Pw20170109229 | |||||
This pays for inspections related to original permit # pw20170109229 filed 1 9 2017. Dow: work category: 5m; convert existing office space into laboratories. Add variable air volume boxes and exhaust control valves to service lab space. Date: January 9, 2017 Permit status: Issued | Expiration date: January 9, 2017 | Permit id: Pmw20170109230 | |||||
Provide new and relocated power for lab equipment in 16 square foot area. No lighting changes. Permit status: Complete | Permit id: Ew20141210961 | |||||
Provide (1) 30kva ups and (1) 225a panelboard to existing lab space. Provide additional standby power for lab equipment Permit status: Expired | Permit id: Ew20150211561 | |||||
2 lights; 1 switch; 6 receptacles; 6 circuits; bayer lab 124 renovations; cei wo #217618 cw Permit status: Complete | Permit id: Ew20140226981 | |||||
Install 1 ckt 1 transformer & 2 panelboards 400amp. Permit status: Cancelled | Permit id: E201509211648 | |||||
64 cables; innova 5th flr cei wo #206635 dc Permit status: Expired | Permit id: Ew20110607121 | |||||
13 cables; orbidmed 5th floor; cei job #11-4813 dc. Permit status: Complete | Permit id: E201103163596 | |||||
1st floor: 1 lights receptacles service: 2 - 4 a; feeders: same; panelboard 43; transformers 2 - 75kva; underground underslab - 5 story core and shell; other equpment: elevators Permit status: Complete | Permit id: E200810152504 | |||||
13 cables; orbidmed; 5th floor; cei job #11-4813 dc Permit status: Expired | Permit id: E201103163595 | |||||
Energy management control systems for hvac Permit status: Complete | Permit id: Ew20110111741 | |||||
2n Permit status: Filed | Permit id: Ew201701052754 | |||||
Installation of 12 modular workstations Permit status: Complete | Permit id: Ew20121030202 | |||||
3 f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. N a ordinance #155-13 Date: July 17, 2017 Value: $800,000 Permit type: Otc alterations permit | Expiration date: June 29, 2017 | Current use: Office | Permit id: 201706290676 | |||||
Construction of shoring wall in association of bld construction at 1455 3rd maher na Date: February 17, 2017 Value: $25,000 Permit type: Otc alterations permit | Expiration date: December 22, 2016 | Current use: Vacant lot | Permit id: 201612225734 | |||||
Tenant improvement that divides existing office into 2 separate leasable office areas. Project area is 1466 sq ft. N a maher Date: February 13, 2017 Value: $36,400 Permit type: Otc alterations permit | Completion date: March 8, 2017 | Expiration date: February 9, 2017 | Current use: Office | Permit id: 201702099105 | |||||
5th floor: add 1 sprinkler pendent to meet and extend coverage per new wall condition. Ref 201702099105 maher na Date: February 28, 2017 Value: $6,273 Permit type: Otc alterations permit | Completion date: March 7, 2017 | Expiration date: February 28, 2017 | Current use: Office | Permit id: 201702280255 | |||||
Bldg. 2, 2 f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. N a ordinance #155-13. Deferred submittal for fire alarm & fire sprinkler. Date: October 18, 2016 Value: $1,300,000 Permit type: Otc alterations permit | Completion date: July 12, 2017 | Expiration date: October 5, 2016 | Current use: Office | Permit id: 201610059559 | |||||
1st fl only: some wall and ceiling demolition to reconfigure layour of office area. Some new walls, ceiling, and lighting finishes to match existing. N a maher ordinance Date: July 26, 2017 Value: $600,000 Permit type: Otc alterations permit | Expiration date: July 17, 2017 | Current use: Office | Permit id: 201707172015 | |||||
1st and 3rd floor: t. I. Fire sprinkler to relocate 5 pendent heads. 1st floor ref app#201707172015 and 3rd floor ref app#201706290676. Date: August 4, 2017 Value: $7,000 Permit type: Otc alterations permit | Completion date: October 10, 2017 | Expiration date: August 4, 2017 | Current use: Office | Permit id: 201708043903 | |||||
3rd fl ti to existing notifier nps2-30 in bldg 3. Adding 5 new horn strobe and 3 strobes maher na ti pa #201706290676. Date: August 11, 2017 Value: $6,592 Permit type: Otc alterations permit | Completion date: September 12, 2017 | Expiration date: August 11, 2017 | Current use: Office | Permit id: 201708114548 | |||||
5th fl; adding (25) 120v, a outlets. Add (1) ceiling mounted occupancy sensor to existing (1) 100a, 30ckt, 3 phase 4 wire panel. Date: August 30, 2017 Value: $38,000 Permit type: Otc alterations permit | Expiration date: August 22, 2017 | Current use: Office | Permit id: 201708225514 | |||||
Suite 145 - building 3: 2 new horn strobe and 2 new strobes added to existing notifier nsf2 30 part of tenant improvement ref 201707172015. N a maher Date: September 8, 2017 Value: $5,450 Permit type: Otc alterations permit | Completion date: October 13, 2017 | Expiration date: September 7, 2017 | Current use: Office | Permit id: 201709077291 | |||||
Third floor t. I. Reconfigure layout of small office area, includes demo of some walls, additional mep scope n a for maher Date: October 20, 2017 Value: $200,000 Permit type: Otc alterations permit | Expiration date: September 8, 2017 | Current use: Office | Permit id: 201709087362 | |||||
As built for 3 sprinkler pendents being relocated to pa#201708043903. N a ordinance #155-13 Date: October 6, 2017 Value: $1 Permit type: Otc alterations permit | Completion date: December 4, 2017 | Expiration date: October 6, 2017 | Current use: Office | Permit id: 201710060605 | |||||
F a for part of ti for 3rd fl, building 3: 1 addressable control relay will be added to (e) notifier nfs2-30 for elevator lobby door holder control. Ref #201706290676. Maher na Date: October 23, 2017 Value: $4,000 Permit type: Otc alterations permit | Expiration date: October 23, 2017 | Current use: Office | Permit id: 201710231962 | |||||
Tenant improvement that returns extg office space into a single leaseable office space. This will be accomplished by wall removal. N a for maher Date: December 21, 2017 Value: $36,400 Permit type: Otc alterations permit | Completion date: December 29, 2017 | Expiration date: November 27, 2017 | Current use: Office | Permit id: 201711274841 | |||||
4th flr: ti - conference room, walls & ceiling, demo & reconfiguration of small office area & conference room. New walls, ceiling & lighting. Maher na Date: January 5, 2018 Value: $400,000 Permit type: Otc alterations permit | Expiration date: January 5, 2018 | Current use: Office | Permit id: 201801057938 | |||||
New design build curtain wall for new construction under 200704279921 Date: April 27, 2009 Value: $4,000,000 Permit type: Additions alterations or repairs | Completion date: November 17, 2009 | Expiration date: October 20, 2008 | Current use: Office | Permit id: 200810204591 | |||||
Install underground fire line fr street to inside of build, install flex tend joint for bldg settlement, cap underground stud-in for future fire sprinkler system submitted under separate permit. Date: December 19, 2008 Value: $12,000 Permit type: Otc alterations permit | Completion date: December 1, 2009 | Expiration date: December 18, 2008 | Current use: Office | Permit id: 200812188792 | |||||
Revision to appl. 200704279921, new finishes, reception desk, mail room & security guard office. New exterior louvers at retail area, new conduits and pipes to retail (no new mechanical equipment). New lighting at lobby and retail area. Date: March 20, 2009 Value: $900,000 Permit type: Otc alterations permit | Completion date: October 28, 2010 | Expiration date: February 6, 2009 | Current use: Office | Permit id: 200902061572 | |||||
Install a complete new fire sprinkler system, including pump and standpipes ref. 200704279921 Date: March 26, 2009 Value: $645,000 Permit type: Additions alterations or repairs | Completion date: November 17, 2009 | Expiration date: February 9, 2009 | Current use: Office | Permit id: 200902091727 | |||||
Fire sprinkler ti, all floors. 1055 heads added, 128 heads relocated. Date: May 27, 2009 Value: $275,000 Permit type: Additions alterations or repairs | Expiration date: April 9, 2009 | Current use: Clinics-medic/dental | Permit id: 200904095908 | |||||
Revision to appl #200704279921, installation of design build stairs #1 and #2. Date: August 14, 2009 Value: $75,000 Permit type: Otc alterations permit | Completion date: November 17, 2009 | Expiration date: August 6, 2009 | Current use: Office | Permit id: 200908064230 | |||||
Build minimum point of entry (mpoe) room on ground floor(for telephone, internet equipment). Building under new construction pa# 2007. 04. 27. 9921. Mep under separate permit. Date: August 20, 2009 Value: $4,000 Permit type: Otc alterations permit | Completion date: August 16, 2010 | Expiration date: August 19, 2009 | Current use: Office | Permit id: 200908195130 | |||||
Install 32 new ceiling sprinklers from existing 1" outlets at lobby at 1st, 2nd, and 3rd floors. Date: September 24, 2009 Value: $6,400 Permit type: Otc alterations permit | Completion date: October 20, 2010 | Expiration date: September 24, 2009 | Current use: Office | Permit id: 200909247558 | |||||
Construct interior for office, laboratories, conference rooms, and other support areas. Includes all architectural work. Mechanical, electrical, plumbing, and fire sprinkler systems under separate application. Date: February 24, 2010 Value: $10,000,000 Permit type: Additions alterations or repairs | Completion date: February 2, 2011 | Expiration date: January 21, 2010 | Current use: Office | Permit id: 201001215065 | |||||
Bldg #2-revisions to pa# 2010-0115-4815-decrease of smoke detectors needed. Revised scope of work is for installing 8 smoke detectors, 2 transponders & 2 duct detectors to the (e) fire alarm system Date: March 25, 2010 Value: $1 Permit type: Otc alterations permit | Completion date: July 15, 2010 | Expiration date: March 25, 2010 | Current use: Office | Permit id: 201003258948 | |||||
Revision to approved p. A.#2007 0427 9921 to include restrooms, electrical, telephome data and fan rooms in buildings 3 on floors 2-5. New interior partitions in roof penthouse. Date: June 8, 2010 Value: $220,000 Permit type: Additions alterations or repairs | Completion date: October 26, 2010 | Expiration date: March 29, 2010 | Current use: Office | Permit id: 201003299172 | |||||
Tenant improvement to partial first floor & full third & fouth floors. General construction, mechanical, electrical, plumbing & fire protection. Full build-out of vacant space. Date: June 17, 2010 Value: $4,600,000 Permit type: Additions alterations or repairs | Completion date: January 11, 2011 | Expiration date: April 26, 2010 | Current use: Office | Permit id: 201004261048 | |||||
1st & 4th floor - design install program & test two (2) new fm-2 fire suppression, pre action detection & control systems for 1st flr server room & 4th flr medical records room. Alarm, trouble & supervisory signals monitored by main building fire alarm control panel. Date: May 6, 2010 Value: $25,000 Permit type: Otc alterations permit | Completion date: January 6, 2011 | Expiration date: May 6, 2010 | Current use: Office | Permit id: 201005061839 | |||||
Bldg 3 - add 3-power supplies, 4-manual alarms, 10-smoke detectors, 6-duct detectors, 30-horn strobes, 9-strobes, 1-relay & 3-monitoring module in bldg.#3. Date: June 30, 2010 Value: $14,000 Permit type: Additions alterations or repairs | Completion date: January 11, 2011 | Expiration date: June 22, 2010 | Current use: Office | Permit id: 201006225021 | |||||
Fire alarm for t. I. Ref. P. A.#201001215065 (arch) & 2010031784 (elec) 5-flrs.; 1-expander card, 6-pwr. Supply, 6-fatc, 5-pull station, 40-sd, 30-duct det. 14-control mod. 6-pam relay, 40-speaker strobes, 140-horn strobes, 34-strobes, 2-hazmat pull sta. 1-expl. Proof 2-expl. Proof detectors. Date: October 1, 2010 Value: $67,700 Permit type: Additions alterations or repairs | Completion date: January 6, 2011 | Expiration date: June 25, 2010 | Current use: Office | Permit id: 201006255352 | |||||
2nd floor shell space ti. 5th fl design alteration to improve accoustical performance. Relocate area (all floors 2-5) of refuge from service elevator lobby to stairwell 1. Ref app: 201001215065, ada full compliance under pa #201001215065 Date: July 2, 2010 Value: $300,000 Permit type: Otc alterations permit | Completion date: January 6, 2011 | Expiration date: June 25, 2010 | Current use: Office | Permit id: 201006255357 | |||||
Additiona to (e) fire alarm system for ti of floors 1,3,4 of buildng 3 Date: July 14, 2010 Value: $29,000 Permit type: Additions alterations or repairs | Completion date: January 11, 2011 | Expiration date: June 30, 2010 | Current use: Office | Permit id: 201006305627 | |||||
Provide " area of refuge" and call system for the (2)stairwells on floors 2-5, mb block 26 building 3 Date: October 7, 2010 Value: $12,000 Permit type: Additions alterations or repairs | Completion date: October 26, 2010 | Expiration date: August 31, 2010 | Current use: Office | Permit id: 201008319959 | |||||
Per approved permit1205639 the main etry lobby doors consist if bax furekute diirs, these update plans change the doors to a total door system. Per app#201001215065 Date: September 13, 2010 Value: $10,000 Permit type: Otc alterations permit | Expiration date: September 13, 2010 | Current use: Office | Permit id: 201009130769 | |||||
Minor revision to pa# 2010-0426-1048-r1-changes to bracing methods for acoustical ceiling minor revisions to notes, partial 1st. Flr., entire 3rd. Flr. & entire 4th. Flr. Date: September 22, 2010 Value: $5,000 Permit type: Otc alterations permit | Completion date: October 26, 2010 | Expiration date: September 22, 2010 | Current use: Office | Permit id: 201009221343 | |||||
Card access control system on 1st, 3rd and 4th floor. Permit reqd due to card access conrol in elev. Lobbies on 3rd and 4th fl. Including freight. Emergency dr releases will be installed at cardaccess controlled ele. Lobby doors. Edr will also be installed for roof cr door Date: October 6, 2010 Value: $31,996 Permit type: Otc alterations permit | Completion date: January 20, 2011 | Expiration date: October 6, 2010 | Current use: Office | Permit id: 201010062420 | |||||
Install call system for area of refuge in the 2 stairwells. Call boxes on floors 2nd, 3rd, 4th & 5th floors. Mission bay block 26, bldg #2 Date: October 13, 2010 Value: $38,641 Permit type: Otc alterations permit | Completion date: January 6, 2011 | Expiration date: October 13, 2010 | Current use: Office | Permit id: 201010132849 | |||||
Evacuation maps for 5 floors (1,2,3,4,5) 22 signs. Date: October 20, 2010 Value: $1,500 Permit type: Otc alterations permit | Completion date: January 6, 2011 | Expiration date: October 20, 2010 | Current use: Office | Permit id: 201010203428 | |||||
Revision to pa# 2009-0206-1572-deletion of louvers at retail space, deletion of grease duct servicing retail Date: October 27, 2010 Value: $1 Permit type: Otc alterations permit | Completion date: October 28, 2010 | Expiration date: October 27, 2010 | Current use: Retail sales | Permit id: 201010273807 | |||||
Install of 15 evacuation maps, floor 1-5 Date: October 27, 2010 Value: $5,000 Permit type: Otc alterations permit | Completion date: November 18, 2010 | Expiration date: October 27, 2010 | Current use: Office | Permit id: 201010273808 | |||||
Office ti on 5th floor " third rock capital" new office partitions, elevator lobby and corridors. New fan room and associated mep. Date: November 30, 2010 Value: $385,000 Permit type: Otc alterations permit | Completion date: April 13, 2011 | Expiration date: November 19, 2010 | Current use: Office | Permit id: 201011195330 | |||||
Fire sprinkler work, tenant improvement on 5th floor. Third rock ventures suite. Add relocatie 67 fire sprinklers. Special inspection required per ab-4. 27. Date: December 21, 2010 Value: $34,480 Permit type: Otc alterations permit | Completion date: April 13, 2011 | Expiration date: December 21, 2010 | Current use: Office | Permit id: 201012217076 | |||||
Bldg #3 5th floor-addition of 11 horn strobes, 5 strobes, 4 smoke detectors, 1 duct detector, 1 module, 1 relay and 1 remote test station as part of a prtial tenant improvement on the 5th floor. Date: December 29, 2010 Value: $7,600 Permit type: Otc alterations permit | Completion date: April 13, 2011 | Expiration date: December 29, 2010 | Current use: Office | Permit id: 201012297550 | |||||
1st bldg #3-addition of 1 power supply, 7 horn strobes, 1 strobe, 2 smoke detectors, 2 duct detectors & 1 monitoring module. Field verify that fsds and door holders were installed with permits; if not submit fsds and door holders on separate permit. Date: January 25, 2011 Value: $8,027 Permit type: Otc alterations permit | Completion date: May 2, 2011 | Expiration date: January 25, 2011 | Current use: Office | Permit id: 201101258974 | |||||
T. I. Fire sprinkler work on 5th floor. Add relocate 4 sprinklers at 3rd rock ventures. Using flex heads, special inspection required- revision to 201012217076 Date: February 8, 2011 Value: $13,000 Permit type: Otc alterations permit | Completion date: April 29, 2011 | Expiration date: February 8, 2011 | Current use: Office | Permit id: 201102089834 | |||||
Addition of 9 horn strobes, 1 strobe, 2 smoke detectors as part of small tenant and protection of vacant space improvement on 5th fl Date: February 9, 2011 Value: $7,000 Permit type: Otc alterations permit | Completion date: April 29, 2011 | Expiration date: February 9, 2011 | Current use: Office | Permit id: 201102099893 | |||||
Office ti on the 5th fl. New int partitions, finishes and mep. New equipment in 1st floor fan room, fire alarm and sprinkler under separate permit Date: June 8, 2011 Value: $510,000 Permit type: Otc alterations permit | Completion date: September 15, 2011 | Expiration date: May 27, 2011 | Current use: Office | Permit id: 201105276990 | |||||
Add 5 horn strobes, 1 strobe, 2 smoke detectors and relocate 1 extg horn strobe due to a tenant improvement on the 5th floor of bldg 3 Date: July 7, 2011 Value: $4,500 Permit type: Otc alterations permit | Completion date: September 15, 2011 | Expiration date: July 7, 2011 | Current use: Office | Permit id: 201107079643 | |||||
Add 9 horn strobes, 1 strobe, 1 smoke detectors and relocate 1 extg horn stobes due to a tenant improvement on the 5th floor of bldg 3 Date: July 7, 2011 Value: $6,200 Permit type: Otc alterations permit | Completion date: September 15, 2011 | Expiration date: July 7, 2011 | Current use: Office | Permit id: 201107079645 | |||||
Tenant improvement in warm shell space on 1st floor. Offices, labs, no bathrooms, office partitions, lab benches, tissub couture labs. Date: May 23, 2012 Value: $540,000 Permit type: Additions alterations or repairs | Completion date: August 24, 2012 | Expiration date: March 20, 2012 | Current use: Office | Permit id: 201203206482 | |||||
Bldg 3, 1st floor suite 145 - adding 8 horn strobes & 7 strobes due to tenant improvement. Date: May 31, 2012 Value: $8,300 Permit type: Otc alterations permit | Completion date: August 1, 2012 | Expiration date: May 31, 2012 | Current use: Office | Permit id: 201205311562 | |||||
3rd floor - install flame atomic absorption spectrometer to include 1ea exhaust hood, 2 - 11ov elec ckts, 1 air line, 1 acetylene line, flam gas storage cabinet w exhaust duct. 2 acetelyene tanks. L s, sprinklers, on separate permit. Date: July 12, 2013 Value: $10,000 Permit type: Additions alterations or repairs | Expiration date: October 5, 2012 | Current use: Clinics-medic/dental | Permit id: 201210051422 | |||||
1st floor-first time t. I-new shell space-create offices, breakroom, restrooms including drywall, partitions, suspended ceilings, convenience kitchenette, hvac, electrical & lighting. Fire protection & fire alarm under seperate permits Date: July 16, 2013 Value: $310,000 Permit type: Otc alterations permit | Completion date: January 23, 2014 | Expiration date: July 12, 2013 | Current use: Office | Permit id: 201307121673 | |||||
Fire sprinkler, add 26 pendent and upright head due to new wall and ceilings. Ref app#201307121673. Date: September 11, 2013 Value: $12,500 Permit type: Otc alterations permit | Completion date: December 2, 2013 | Expiration date: September 11, 2013 | Current use: Office | Permit id: 201309116506 | |||||
1st floor-add 5 strobes, 8 horn strobes, 2 duct detectors Date: October 17, 2013 Value: $10,000 Permit type: Otc alterations permit | Completion date: November 26, 2013 | Expiration date: October 17, 2013 | Current use: Office | Permit id: 201310179494 | |||||
1st floor - mechanical ductwork, electrical power and lighting and plumbing for new gr fl office buildout. Ref 201307121673. Fire sprinkler separate Date: November 22, 2013 Value: $80,000 Permit type: Otc alterations permit | Completion date: December 17, 2013 | Expiration date: November 21, 2013 | Current use: Office | Permit id: 201311212556 | |||||
Demo e fixtures in room 124, infill door opening on corridor side. Install joisted drywall ceiling, new lab casework, new lab gas lines and hot cold water. New 6" ducts to e 14" ducts and install new slide gate dampers. Connect 1w piping to e system. Minor electrical revisions Date: February 24, 2014 Value: $170,000 Permit type: Additions alterations or repairs | Completion date: April 9, 2014 | Expiration date: November 27, 2013 | Current use: Office | Permit id: 201311273048 | |||||
Add sheet metal exhaust ducts, floor drain, (1) icw line, process cda, n2 & o2 lines. N a ordinance #155-13. Date: May 20, 2014 Value: $45,256 Permit type: Otc alterations permit | Completion date: July 22, 2014 | Expiration date: May 19, 2014 | Current use: Clinics-medic/dental | Permit id: 201405196088 | |||||
3rd floor:soft demolition, constuction of new partitions and mep upgrades for new offices. N a for maher 155-13. Fire sprinkler under deferred submittal Date: August 22, 2014 Value: $33,000 Permit type: Otc alterations permit | Completion date: November 24, 2014 | Expiration date: June 30, 2014 | Current use: Office | Permit id: 201406300071 | |||||
Suite 125 - remodel of lab space including mechanical, electrical and plumbing work. Ref: pa#2014-09-03-5284. Maher ord n a. Date: December 10, 2014 Value: $200,000 Permit type: Additions alterations or repairs | Expiration date: September 29, 2014 | Current use: Office | Permit id: 201409297544 | |||||
Add new co2 fire suppression system to new process tool station. Ref. Job #201409035284. Date: February 18, 2015 Value: $15,000 Permit type: Additions alterations or repairs | Expiration date: December 18, 2014 | Current use: Office | Permit id: 201412184093 | |||||
Building 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. Bathrooms, elevators and stairs are (e). Project will build office space for use of tenant. This project is on the 2nd flr. Of the (e) bdg. Life and safety under separate permit. Maher-not reqd Date: March 18, 2015 Value: $2,831,125 Permit type: Otc alterations permit | Completion date: November 20, 2015 | Expiration date: March 10, 2015 | Current use: Office | Permit id: 201503100342 | |||||
Bldg 3- add 1 power supply, 1 manual alarm, 4 smoke detectors, 1 duct detector, 27 horn strobes & strobes as part of a t. I. For bldg. 3, 2 f. Ref. To pa#201503100342. N a ordinance #155-13 Date: April 22, 2015 Value: $20,000 Permit type: Otc alterations permit | Completion date: July 30, 2015 | Expiration date: April 22, 2015 | Current use: Office | Permit id: 201504224270 | |||||
2 fa devices - elevator lobby door holders -ca-17-4-19075-00 Date: November 22, 2017 Permit status: Issued | Permit id: Ew201711229448 | |||||
Demo an exit sign and relocate a furniture feed Date: December 1, 2017 Permit status: Complete | Completion date: December 6, 2017 | Permit id: Ew201712019596 | |||||
Modular furniture installation Date: November 20, 2017 Permit status: Complete | Completion date: December 11, 2017 | Permit id: Ew201711209391 | |||||
13 cables; orbidmed, 5th floor; cei job #11-4813 dc. Date: March 16, 2011 Permit status: Complete | Completion date: April 5, 2011 | Permit id: E201103163596 | |||||
Installation of 12 modular workstations Date: October 30, 2012 Permit status: Complete | Completion date: November 6, 2012 | Permit id: Ew20121030202 | |||||
Adding outlets in 5th floor lab space. (1) 1 amp, ckt, 3 phase, 4 wire subpanel. 25 receptacles. (1) added ceiling mounted sensor lighting control. Date: August 30, 2017 Permit status: Complete | Completion date: September 15, 2017 | Permit id: E201708307360 | |||||
Existing service to by used for construction office and temp power Date: November 15, 2010 Permit status: Complete | Completion date: February 7, 2014 | Permit id: Ew20101115161 | |||||
1st flr: lights, 23 switches, receptacles, 126 circuits, 2 panels switchboards; 2 feeders, 1 bus tap, 15 fire alarm devices, quswami, 1st flr, cei job #10-4339 sb Date: January 27, 2011 Permit status: Complete | Completion date: May 5, 2011 | Permit id: E201101272548 | |||||
1st floor lobby security equipment room: card access controller system. Power from one central location for our controllers. Date: April 6, 2010 Permit status: Complete | Completion date: August 12, 2010 | Permit id: E201004066536 | |||||
Rock health (92)lights (21)switches (50)receptacles Date: August 17, 2013 Permit status: Complete | Completion date: November 27, 2013 | Permit id: Ew20130817421 | |||||
2 receptacles; 2 circuits - bayer lab 322c; cei wo #223593 -pm-carl winther Date: April 14, 2015 Permit status: Expired | Permit id: Ew20150414261 | |||||
Install data cables on th3 1st, 2nd, 3rd, 4th and 5th floor. Date: May 25, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: E201005257596 | |||||
Install 1 ckt, 1 transformer & 2 panelboards, 400amp. Date: September 21, 2015 Permit status: Cancelled | Permit id: E201509211648 | |||||
(6) furniture feeds - ma wo 232182 - cameron saal 4158500607 Date: May 25, 2017 Permit status: Complete | Completion date: June 2, 2017 | Permit id: Ew201705255664 | |||||
Bldg #2: 5 floors of hvac controls (t-stats & vavs-127) Date: August 20, 2010 Permit status: Complete | Completion date: November 9, 2010 | Permit id: E201008209475 | |||||
Card access control panels tied into (1) dedicated 110v circuit. Access control panel(s). Date: October 22, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: E20101022763 | |||||
2n Date: January 5, 2017 Permit status: Issued | Permit id: Ew201701052754 | |||||
Five pieces of equipment to hook up in two different labs. It is all 208v single phase or three phase. Date: April 9, 2014 Permit status: Complete | Completion date: April 9, 2014 | Permit id: Ew20140409641 | |||||
Connect new card readers to customers existing system Date: August 3, 2015 Permit status: Complete | Completion date: August 3, 2015 | Permit id: Ew20150803821 | |||||
Install 66 cables Date: November 14, 2013 Permit status: Complete | Completion date: February 7, 2014 | Permit id: Ew20131114001 | |||||
Install one new 208 volt amp receptacle in lab area. Date: March 12, 2012 Permit status: Complete | Completion date: March 19, 2012 | Permit id: Ew20120312461 | |||||
First floor server room: fm-2 fire suppression and pre-action detection & controls systems. Date: October 22, 2010 Permit status: Complete | Completion date: November 16, 2010 | Permit id: E20101022750 | |||||
Building 3: break glass station for haz-mat alarm (local alarm). Ref. Bldg. Permit applciation 201001215065 Date: November 11, 2010 Permit status: Complete | Completion date: November 19, 2010 | Permit id: Ew20101111727 | |||||
Install approximately 15 new receptacles. Provide electrical connection to 4 new fume hoods. Date: May 24, 2012 Permit status: Complete | Completion date: July 6, 2012 | Permit id: Ew20120524501 | |||||
Work at 455 mission bay south blvd. Bldng. 3 : connect office furniture to (e) power source. 5 receptacles. Date: May 12, 2011 Permit status: Complete | Completion date: May 17, 2011 | Permit id: E201105124891 | |||||
Modular office furniture: 15 workstationsais site contact: keith leavy (510) 774-9887 Date: October 29, 2010 Permit status: Complete | Completion date: November 17, 2010 | Permit id: Ew20101029741 | |||||
(5) floors: cei job #08-4461; lighting (1463), switches (431), receptacles (961), circuits (1200), panel switchboards (2) 2500a, (1) 1600a, (1) 800a, (40) 225a, (5) 150a, feeders: (as for panels switch); special equipment: (1200a plug bus riser fused switches, 1. 5 mw exterior generator base tank; fire alarm; (121) horn strobes, (29) strobes, (28) smoke detectors, (33) duct detectors, (50) speaker strobes ); temp pwr, Date: March 25, 2009 Permit status: Complete | Completion date: July 14, 2010 | Permit id: E200903258032 | |||||
2 lights; 1 switch; 6 receptacles; 6 circuits; bayer lab 124 renovations; cei wo #217618 cw Date: February 26, 2014 Permit status: Complete | Completion date: March 27, 2014 | Permit id: Ew20140226981 | |||||
1st flr: temp, 514 power lighting, 225 switches, 554 receptacles, 227 circuits, panel switchboard, feeders 16, special eqpt 7, furniture partition connections, fire alarm 362, cei job 10. 4244, eb Date: May 21, 2010 Permit status: Complete | Completion date: November 16, 2010 | Permit id: E201005217544 | |||||
1st floor: 1 lights, receptacles, service: 2 - 4 a; feeders: same; panelboard 43; transformers 2 - 75kva; underground underslab - 5 story core and shell; other equpment: elevators Date: October 15, 2008 Permit status: Complete | Completion date: November 12, 2009 | Permit id: E200810152504 | |||||
121 cables; quswami, 1st floor; cei job #11-4811 dc Date: April 5, 2011 Permit status: Complete | Completion date: January 28, 2013 | Permit id: Ew20110405121 | |||||
1 - 1 a panel, 1 - kva trans; bayer mission bay, 1st floor; cei wo #213571 cw Date: January 23, 2013 Permit status: Complete | Completion date: January 30, 2013 | Permit id: Ew20130123081 | |||||
93 lights; 22 switches; 47 receptacles; circuits; existing panels switchboards; 19 fire alarm devices; orbidmed, 5th floor, cei job #11-4208 sb Date: February 9, 2011 Permit status: Complete | Completion date: April 5, 2011 | Permit id: Ew20110209401 | |||||
New f a system: missoin bay freight elevator lobby: cei wo#218191cw. 2500sf. Date: May 5, 2014 Permit status: Expired | Permit id: E201405059395 | |||||
Cables; v c offices, 5th floor; cei lv wo #207296 dc Date: August 1, 2011 Permit status: Complete | Completion date: September 14, 2011 | Permit id: Ew20110801341 | |||||
22 cables; are conference rooms, 5th floor; cei wo #205708 dc Date: April 5, 2011 Permit status: Complete | Completion date: April 5, 2011 | Permit id: Ew20110405141 | |||||
Provide (1) 30kva ups and (1) 225a panelboard to existing lab space. Provide additional standby power for lab equipment Date: February 11, 2015 Permit status: Expired | Permit id: Ew20150211561 | |||||
Modular office furniture: 22 workstationsais site contact: james talus (510) 774-9886note: building 2 Date: October 22, 2010 Permit status: Complete | Completion date: November 2, 2010 | Permit id: Ew20101022142 | |||||
Fourth floor medical records room: fm-2 fire suppression & pre-action detection & controls systems. Date: October 22, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: E20101022751 | |||||
Modular office furniture: 29 workstationsais site contact: james talus (510) 774-9886 Date: November 2, 2010 Permit status: Complete | Completion date: November 17, 2010 | Permit id: Ew20101102262 | |||||
Work to be done in building 2: t. I. Build out for 5 floors of office and lab space. (2) 4 & (1) 125, 4 lights, switches, 3 receptacles, 2 fans, 1 dishwasher, 1 garbage disposal, 2 microwaves, misc. Lab equipment, fume hoods, glass wash etc. Date: April 5, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: E201004056487 | |||||
Lights; 19 switches; receptacles; 42 circuits in panel; 1 panel switchboard; 1 feeder; 8 fire alarm devices; vc spec suite, 5th floor; cei job #11-4249 sb Date: July 14, 2011 Permit status: Complete | Completion date: September 14, 2011 | Permit id: Ew20110714761 | |||||
Modular office installation: 32 workstationsais site contact: james talus (510) 774-9886 Date: November 2, 2010 Permit status: Complete | Completion date: November 17, 2010 | Permit id: Ew20101102261 | |||||
1st and 4th floor: bldg. 2 west wing - first floor server & fourth floor medical records: witness test Date: May 6, 2010 Permit status: Cancelled | Permit id: E201005067214 | |||||
Modular office furniture: workstationsais site contact: james talus (510) 774-9886note: building 2 Date: October 21, 2010 Permit status: Complete | Completion date: November 2, 2010 | Permit id: Ew20101021121 | |||||
82 lights; 42 switches; receptacles;128 circuits; 2 panels switchboards; 6 feeders; 13 fire alarm devices; innova, 5th floor; cei job #11-42 sb Date: June 3, 2011 Permit status: Complete | Completion date: September 14, 2011 | Permit id: Ew20110603401 | |||||
Energy management system. Date: February 18, 2011 Permit status: Complete | Completion date: January 28, 2013 | Permit id: E201102182967 | |||||
3 lights;11 receptacles; (1) fume hood, conect track; 7 fa devices- jj-17-4-19075-00 Date: July 25, 2017 Permit status: Issued | Permit id: Ew201707256926 | |||||
Area of rufuge call boxes (8) locations. Located in (2) stairwells on floors 2,3,4&5. (4) call boxes in each stairwell Date: October 11, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: Ew20101011161 | |||||
Energy management system. Date: September 13, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: E201009139908 | |||||
5th floor; temp power; light (266), switches (39), receptacles (59), circuits (74). Panel switchboards (8 7), feeders(18), special equipment 1600a ats & 100a ats, fire alram (23) Date: May 20, 2010 Permit status: Complete | Completion date: October 28, 2010 | Permit id: Ew20100520841 | |||||
Install new 125volt, l5- receptacle in server room. Install new 250volt, 6- receptacle for existing oven. Date: November 21, 2013 Permit status: Complete | Completion date: December 6, 2013 | Permit id: Ew20131121721 | |||||
1st floor server & 4th floor medical records: life safety witness test. Date: October 29, 2010 Permit status: Complete | Completion date: November 15, 2010 | Permit id: E20101029886 | |||||
13 cables; orbidmed; 5th floor; cei job #11-4813 dc Date: March 16, 2011 Permit status: Expired | Permit id: E201103163595 | |||||
1 cables; bayer, 1st floor; cei job # 12-4-10117- dc Date: June 21, 2012 Permit status: Complete | Completion date: August 9, 2012 | Permit id: Ew20120621561 | |||||
27 lights; 42 receptacles; connect track; 6 fa devices-ca-17-4-19075-00 Date: September 11, 2017 Permit status: Issued | Permit id: Ew201709117904 | |||||
64 cables; innova, 5th flr, cei wo #206635 dc Date: June 7, 2011 Permit status: Expired | Permit id: Ew20110607121 | |||||
Energy management controls systems for hvac Date: June 29, 2011 Permit status: Complete | Completion date: September 14, 2011 | Permit id: Ew20110629005 | |||||
Ste 575. Install 44 category 6 cables to designated locations. Date: February 14, 2011 Permit status: Complete | Completion date: February 7, 2014 | Permit id: E201102142864 | |||||
77 lights; 17 switches; 39 receptacles; 25 circuits; panels switchboards - 3 panel boards, 1 transformer, 1 bus tap to 3 new panels; 23 fire alarm devices; third rock cei job #10-4327 sb Date: December 21, 2010 Permit status: Complete | Completion date: April 11, 2011 | Permit id: Ew20101221841 | |||||
Provide new and relocated power for lab equipment in 16 square foot area. No lighting changes. Date: December 10, 2014 Permit status: Complete | Completion date: July 13, 2016 | Permit id: Ew20141210961 | |||||
5 stations of modular partitions on the 1st floor. Date: April 15, 2011 Permit status: Cancelled | Permit id: Ew20110415101 | |||||
Office ti buildout including (231) lights; (7) switches; (84) receptacles; (1) 600a-480v; parallel 350mcm, (1) 200a-480v with 3 feeder; (1) 600a-480v dist. Panel, (2) 200a-480v panel, (1) 225a ats, (1) 22. 5 mini power center, (2) 120 208v panels; (1) 75kva transformer; lutron & wattstopper controls for t-24 @ nektar therapeutics - 455 mission bay south, 2nd floor Date: April 27, 2015 Permit status: Complete | Completion date: August 3, 2015 | Permit id: Ew20150427841 | |||||
66 lights; 16 switches; 61 receptacles; 126 circuits; 3 panels, 2 transformers; 2 feeders; 29 fire alarm devices; bayer incubator; 1st floor; cei job #12-4-09403- sb Date: May 24, 2012 Permit status: Complete | Completion date: August 9, 2012 | Permit id: Ew20120524581 | |||||
8 lights; 3 switches; 7 receptacles; 2 circuits; cei wo #220781 cw Date: October 17, 2014 Permit status: Complete | Completion date: November 20, 2014 | Permit id: Ew20141017401 | |||||
Modular furniture installation Date: July 27, 2015 Permit status: Complete | Completion date: August 4, 2015 | Permit id: Ew20150727761 |