Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install new 200a meter main on south exterior wall. Run new 150a feeders to new 150a sub panel in basement north wall. Install 50a outlet in carport. Install 3. 135kw pv system consisting of (11) 285w modules and (1) 3800w inverter. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: February 16, 2016 | Expiration date: January 12, 2017 | Current use: Single family / duplex | Permit id: 6513679 |