Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: February 16, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 11, 2016 | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: January 21, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 4, 2016 | Permit id: Pds2016-Resalt- | |||||
3300sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp manufacturer certainteed brand and model solaris color (if cool roof required) crystal gray built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: December 18, 2015 Value: $19,569 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 3, 2016 | Permit id: Pds2015-Resalt- | |||||
SCORE 98 Existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Date: February 16, 2016 Contractor: Jp Electrical Power And Controls Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 11, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: January 21, 2016 Contractor: Petersendean Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 4, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 95 3300sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp manufacturer certainteed brand and model solaris color (if cool roof required) crystal gray built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 3, 2016 | Permit id: Pds2015-Resalt- | |||||
Final Date: March 1, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- |