Zoning/use permit Date: March 17, 2016 Client: Holy Family University | Permit status: Completed | Permit id: 667997 | |||||
Use permit Date: June 21, 2012 Client: Holy Family University | Permit status: Completed | Permit id: 412457 | |||||
Zoning/use permit Date: July 13, 2011 Client: Holy Family University | Permit status: Completed | Permit id: 350748 | |||||
Zoning admin review Date: June 13, 2013 Client: Holy Family University | Permit status: Completed | Permit id: 455925 | |||||
Electrical permit Date: December 6, 2016 Client: Holy Family University | Permit status: Active | Permit id: 741476 | |||||
Zoning admin review Date: June 13, 2013 Client: Holy Family University | Permit status: Completed | Permit id: 455925 | |||||
New construction permit Date: December 1, 2016 Client: Holy Family University | Permit status: Active | Permit id: 728829 | |||||
Zoning use permit Date: March 17, 2016 Client: Holy Family University | Permit status: Completed | Permit id: 667997 | |||||
Use permit Date: June 21, 2012 Client: Holy Family University | Permit status: Completed | Permit id: 412457 | |||||
Zoning use permit Date: July 13, 2011 Client: Holy Family University | Permit status: Completed | Permit id: 350748 | |||||
For the partial demolition of an exisitng detached structure and for the erection of an addition to the exisitng structure with porches at the first floor front (fronting grant ave). Size and location as shown on plans application. For use as business and professional offices. For the creation of an accessory surface parking lot with twenty-four (24) spaces including two (2) accessible spaces [minimum one (1) designated as van accessible]. No signs on application. Date: March 17, 2016 Client: Holy Family University | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 17, 2016 | Permit id: 667997 | |||||
SCORE 100 Addition: interior plumbing;3 story structure; offices for university campus; new supply and drainage piping from existing ug through roof for 8 water closets, 8 lavs, and 2 drinking fountains - the installation will comply with the philadephia plubming code 2004 Date: September 5, 2017 Contractor: A T Chadwick Client: Holy Family University | Permit type: Plumbing permit | Permit status: Active | Completion date: September 20, 2017 | Permit id: 810845 | |||||
Installation of new hvac system for expanded university administrative office building as per approved plans. Date: August 14, 2017 Client: Holy Family University | Permit type: Mechanical permit | Permit status: Active | Completion date: November 14, 2017 | Permit id: 807535 | |||||
SCORE 100 Install a 100amp 120 240volt single phase temporary service for construction site, install temporary lighting and power for 6 months as per nec 2008 (east district) Date: December 6, 2016 Contractor: Liberty Integrated Solutions Client: Holy Family University | Permit type: Electrical permit | Permit status: Completed | Completion date: June 23, 2017 | Permit id: 741476 | |||||
SCORE 100 Replace storm drain from building to connection in street-pa1#20172542067-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: September 11, 2017 Contractor: A T Chadwick Client: Holy Family University | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 24, 2017 | Permit id: 815163 | |||||
For the amendment of previously approved permit# 728829 to modify the proposed foundation portion to delete certain basement level portions and incorporate foundations for an elevator which is proposed to be relocated and modify the proposed sitework. Original permit approved for the partial demolition of one story portion of the existing structure with the erection of a foundation only for proposed one two story addition to existing detached three story structure. Work to also include site work as referenced on submitted plans. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Special inspector approved for project scope: peter j. Tantala p. E. Separate permits required for above ground structure and all other work. Date: May 22, 2017 Client: Holy Family University | Permit type: Administrative permit | Permit status: Active | Completion date: November 24, 2017 | Permit id: 774212 | |||||
Level iii alterations (no change of occupancy) with additions to existing administrative offices for a university campus within an existing building as per approved plans. See a p 728829 for demolition, foundation & site work. Building to be fully sprinklered. Separate permits required for mep & fire suppression work Date: August 14, 2017 Client: Holy Family University | Permit type: Addition permit | Permit status: Active | Completion date: November 14, 2017 | Permit id: 803861 | |||||
For the partial demolition of one story portion of the existing structure with the erection of a foundation only for proposed one two story addition to existing detached three story structure. Work to also include site work as referenced on submitted plans. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Special inspector approved for project scope: peter j. Tantala p. E. Separate permits required for above ground structure and all other work. Date: December 1, 2016 Client: Holy Family University | Permit type: New construction permit | Permit status: Active | Completion date: November 24, 2017 | Permit id: 728829 | |||||
Extend zoning use permit no. 350748 to july 2013. Date: June 21, 2012 Client: Holy Family University | Permit type: Use permit | Permit status: Completed | Completion date: June 21, 2012 | Permit id: 412457 | |||||
Extension of permit # 412457. Pursuant to pa act 87. This extension to expire on july 2, 2016 unless extended by other portions of the philadelphia code. Contact district office to institute the required inspections. Date: June 13, 2013 Client: Holy Family University | Permit type: Zoning admin review | Permit status: Completed | Completion date: May 12, 2014 | Permit id: 455925 | |||||
Demolish existing, free standing 2 1 2 story bldg. To include attached garage, and construct a free standing, two story bldg. To be identified as bldg "t" to include off street parking for (39) vehicles and to include stormwater management, lancscaping and inter alia. Date: July 13, 2011 Client: Holy Family University | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 12, 2014 | Permit id: 350748 |