Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Temporary construction power for 4358 (a). Date: August 9, 2000 Contractor: Breckenridge Electric Client: For Habitat | Applicant: Breckenridge Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 14, 2000 | Current use: Single family a | |||||
SCORE 86 Installation of a flush mount 4. 14 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved under this permit. Contractor to maintain min. 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch min. Pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Client: Anthony Westlake | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 24, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03148 |