Building Permits at 4329 El Camino Real, Palo Alto, CA 94306 San Diego Ca


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 4329 El Camino Real, Palo Alto, CA 94306 San Diego Ca over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
96
12000-00783: ada updates including truncated domes, striping, and communication equipment
Date:  March 17, 2015

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00158
2015/03/170964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: block out of windows on the interior side only on (2) bedroom windows (rm#447) and install bronze colored graphic film over glass window, facing the courtyard
Date:  March 17, 2015

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00156
2015/03/170964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: structural details and calculations for equipment over 4 lbs (equipment: smith water heater and additional water heater in boiler room; pool heater and sand filter in pool equipment room; storage tank in boiler room; washers, dryers and fan at back of house)
Date:  February 24, 2015

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00103
2015/02/240964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: structural detail for wall anchorage of shelving 5-9" and above, 7-0" minimum clearance sign locations, wall sconces at porte cochere canopy and lodge company
Date:  February 12, 2015

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00079
2015/02/120964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: deferred submittal for metal stairs (stair #1 and stair #2) from basement level to first floor only
Date:  December 30, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00774
2014/12/300964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: seismic anchoring of mechanical equipment on rooftop (previously approved location)
Date:  December 11, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00747
2014/12/110964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: canopy at the front entrance and at the lodge patio are revised from 25"h glulam beam to 18"h steel tube; (n) pair of columns added in order to support the canopy at the lodge patio; changes to light pole foundation detail; planter height and footing details; lobby changes by front desk; wall type; kitchen hood fire duct wrap
Date:  October 2, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00603
2014/10/020964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
100
14000-00783: deferred submittal for installation of emergency 2-way communication system (area of refuge)
Date:  September 18, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00570
2014/09/1801004329 El Camino Real, Palo Alto, Ca 94306Allcom Electric Inc
SCORE
96
12000-00783: install fireplace at lobby (eliminate aquarium), relocate monument sign 6", reduce the size of smoke shelter from wide to 5 wide
Date:  September 18, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00566
2014/09/180964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: structural revision to pergola, attach to (e) column and extend pergola by 6 over pool fence
Date:  September 10, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00543
2014/09/100964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: bbq island and pergola
Date:  June 30, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00380
2014/06/300964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
86
Install heated commercial pool associated mechancial, electrical and plumbing. [sr0843895]
Date:  May 21, 2014
Value:   $90,000
Contractor: Monument Pools Inc

Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01213
2014/05/2190000864329 El Camino Real, Palo Alto, Ca 94306Monument Pools Inc
SCORE
100
Electrical for (3) 3 illuminated signs per 14pln-00024
Date:  March 28, 2014

Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00727
2014/03/2801004329 El Camino Real, Palo Alto, Ca 94306Coast Sign Incorporated
SCORE
82
12-783: ammr for 2hour fire wall
Date:  November 5, 2012

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00597
2012/11/050824329 El Camino Real, Palo Alto, Ca 94306Swenson Barry Builder
SCORE
96
12000-00783: revision to change from 4ply to tpo roofing, gaf everguard esr-1597
Date:  December 2, 2013

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00751
2013/12/020964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: revisions for deferred hold-down system [deh #sr0838742]
Date:  May 16, 2013

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00331
2013/05/160964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12-783: change from pour-in-place concrete pilasters and wall to precast concrete pilasters and walls along parking lot
Date:  March 18, 2013

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00160
2013/03/180964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
New 4 story hotel and u&o, structure (111,585 sf) and underground parking garage (36,014 sf). 138 guest rooms, reception area, meeting rooms and dining area. [deh #sr0838742]
Date:  April 6, 2012

Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00783
2012/04/060964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
82
Temporary power
Date:  January 28, 2013

Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00288
2013/01/280824329 El Camino Real, Palo Alto, Ca 94306Swenson Barry Builder
SCORE
82
Demo (e) commercial building 30,8 sf
Date:  March 6, 2012

Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00511
2012/03/060824329 El Camino Real, Palo Alto, Ca 94306Swenson Barry Builder
SCORE
96
12000-00783: mechanical layout change in meeting room, lobby fireplace gasline change (from 1 1/4" to 1 1/2" and from 1" to 1 1/4"), 2 foot width sidewalk increase on el camino real and offsite tree wells (4 x 8), (e) raised planters along ecr will be moved back 24 inches to accomodate 2 foot wide concrete sidewalk (site improvement permit under 12000-00609)
Date:  October 30, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00660
2014/10/300964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: 4/14/14 - revision amended to include ammr additional details for stair #1 through seismic gap, additional details for stair #4 and relocate door to have 18" pull side clearance at first floor only
Date:  April 1, 2014

Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00189
2014/04/010964329 El Camino Real, Palo Alto, Ca 94306Green Valley Corporation
SCORE
96
12000-00783: ada updates including truncated domes, striping, and communication equipment
Date:  March 17, 2015

Permit status: Permit issued | Permit id: 15rev-00158
2015/03/170964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: block out of windows on the interior side only on (2) bedroom windows (rm#447) and install bronze colored graphic film over glass window, facing the courtyard
Date:  March 17, 2015

Permit status: Permit issued | Permit id: 15rev-00156
2015/03/170964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: structural revision to pergola, attach to (e) column and extend pergola by 6 over pool fence
Date:  September 10, 2014

Permit status: Permit issued | Permit id: 14rev-00543
2014/09/100964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: structural details and calculations for equipment over 4 lbs (equipment: smith water heater and additional water heater in boiler room; pool heater and sand filter in pool equipment room; storage tank in boiler room; washers, dryers and fan at back of house)
Date:  February 24, 2015

Permit status: Permit issued | Permit id: 15rev-00103
2015/02/240964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: structural detail for wall anchorage of shelving 5-9" and above, 7-0" minimum clearance sign locations, wall sconces at porte cochere canopy and lodge company
Date:  February 12, 2015

Permit status: Permit issued | Permit id: 15rev-00079
2015/02/120964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: deferred submittal for metal stairs (stair #1 and stair #2) from basement level to first floor only
Date:  December 30, 2014

Permit status: Permit issued | Permit id: 14rev-00774
2014/12/300964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: seismic anchoring of mechanical equipment on rooftop (previously approved location)
Date:  December 11, 2014

Permit status: Permit issued | Permit id: 14rev-00747
2014/12/110964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: mechanical layout change in meeting room, lobby fireplace gasline change (from 1 1 4" to 1 1 2" and from 1" to 1 1 4"), 2 foot width sidewalk increase on el camino real and offsite tree wells (4 x 8), (e) raised planters along ecr will be moved back 24 inches to accomodate 2 foot wide concrete sidewalk (site improvement permit under 12000-00609)
Date:  October 30, 2014

Permit status: Permit issued | Permit id: 14rev-00660
2014/10/300964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: canopy at the front entrance and at the lodge patio are revised from 25"h glulam beam to 18"h steel tube; (n) pair of columns added in order to support the canopy at the lodge patio; changes to light pole foundation detail; planter height and footing details; lobby changes by front desk; wall type; kitchen hood fire duct wrap
Date:  October 2, 2014

Permit status: Permit issued | Permit id: 14rev-00603
2014/10/020964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
100
14000-00783: deferred submittal for installation of emergency 2-way communication system (area of refuge)
Date:  September 18, 2014

Permit status: Permit issued | Permit id: 14rev-00570
2014/09/1801004329 El Camino Real, Palo Alto, Ca 94306 San Diego CaAllcom Electric Inc
SCORE
96
12000-00783: install fireplace at lobby (eliminate aquarium), relocate monument sign 6", reduce the size of smoke shelter from wide to 5 wide
Date:  September 18, 2014

Permit status: Permit issued | Permit id: 14rev-00566
2014/09/180964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: bbq island and pergola
Date:  June 30, 2014

Permit status: Permit issued | Permit id: 14rev-00380
2014/06/300964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
86
Install heated commercial pool associated mechancial, electrical and plumbing. [sr0843895]
Date:  May 21, 2014
Value:   $90,000
Contractor: Monument Pools Inc

Permit status: Permit issued | Permit id: 14000-01213
2014/05/2190000864329 El Camino Real, Palo Alto, Ca 94306 San Diego CaMonument Pools Inc
SCORE
96
12000-00783: 4 14 14 - revision amended to include ammr additional details for stair #1 through seismic gap, additional details for stair #4 and relocate door to have 18" pull side clearance at first floor only
Date:  April 1, 2014

Permit status: Permit issued | Permit id: 14rev-00189
2014/04/010964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
100
Electrical for (3) 3 illuminated signs per 14pln-00024
Date:  March 28, 2014

Permit status: Permit issued | Permit id: 14000-00727
2014/03/2801004329 El Camino Real, Palo Alto, Ca 94306 San Diego CaCoast Sign Incorporated
SCORE
96
12000-00783: revision to change from 4ply to tpo roofing, gaf everguard esr-1597
Date:  December 2, 2013

Permit status: Permit issued | Permit id: 13rev-00751
2013/12/020964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12000-00783: revisions for deferred hold-down system [deh #sr0838742]
Date:  May 16, 2013

Permit status: Permit issued | Permit id: 13rev-00331
2013/05/160964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
96
12-783: change from pour-in-place concrete pilasters and wall to precast concrete pilasters and walls along parking lot
Date:  March 18, 2013

Permit status: Permit issued | Permit id: 13rev-00160
2013/03/180964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
SCORE
82
Temporary power
Date:  January 28, 2013

Permit status: Permit issued | Permit id: 13000-00288
2013/01/280824329 El Camino Real, Palo Alto, Ca 94306 San Diego CaSwenson Barry Builder
SCORE
82
12-783: ammr for 2hour fire wall
Date:  November 5, 2012

Permit status: Permit issued | Permit id: 12rev-00597
2012/11/050824329 El Camino Real, Palo Alto, Ca 94306 San Diego CaSwenson Barry Builder
SCORE
82
Demo (e) commercial building 30,8 sf
Date:  March 6, 2012

Permit status: Permit issued | Permit id: 12000-00511
2012/03/060824329 El Camino Real, Palo Alto, Ca 94306 San Diego CaSwenson Barry Builder
SCORE
96
New 4 story hotel and u&o, structure (111,585 sf) and underground parking garage (36,014 sf). 138 guest rooms, reception area, meeting rooms and dining area. [deh #sr0838742]
Date:  April 6, 2012

Permit status: Permit issued | Permit id: 12000-00783
2012/04/060964329 El Camino Real, Palo Alto, Ca 94306 San Diego CaGreen Valley Corporation
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.