Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Hvac change out - fau or wall heater and elec this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. 02-16-2016 added elec and mech to scope. Maz Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 11, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 97 Hvac change out - fau or wall heater and elec this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. 02-16-2016 added elec and mech to scope. Maz Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Stormwater insp Permit status: Monitor | Permit id: Pds2008-1004-20 | |||||
Lath/drywall - interior Permit status: Pass | Permit id: Pds2008-1004-20 |