Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Construction of two story four-plex with one low moderate income unit and three middle income units. Each unit has two bedrooms and two and a half baths with unfinished basement. To include four one car garages with two additional parking spaces. Tec2009-00044. Client: Boulder North | Applicant: Coast To Coast Residential Dev | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 2, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 New sprinkler system for multi-family dwelling Date: February 22, 2010 Contractor: Fire Defense Inc Client: Village Northfield | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: February 10, 2011 | Current use: Multifamily dwe | |||||
SCORE 56 Basement finish of 5 sf to create recreation room and a full bath utilizing existing rough-ins. ( 6 sf total, 1 sf mechanical storage room to remain unfinished) (rough-in from pmt2009-04944 used) Client: Devin Nordson | Applicant: Devin Nordson | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 12, 2010 | Current use: Townhomes, remo | |||||
SCORE 95 Installation of a flush mount grid-tied 4. 68 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Pvfoots located on townhome. Date: November 13, 2012 Contractor: Namaste Solar Electric Inc Client: Beth Struble | Applicant: Namaste Solar Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Multifamily dwe | |||||
SCORE 95 Construction of two story four-plex with one low moderate income unit and three middle income units. Each unit has two bedrooms and two and a half baths with unfinished basement. To include four one car garages with two additional parking spaces. Tec2009-00044. Client: Boulder North | Permit type: Building, electrical, mechanical, plumbing, fire, water, wastewater, sitework | Permit status: Cmp | Completion date: November 2, 2010 | Current use: Multifamily dwellings, new, garage - att | Permit id: Pmt2009-04944 | |||||
SCORE 95 Installation of a flush mount grid-tied 4. 68 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Pvfoots located on townhome. Client: Beth Struble | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-05467 | |||||
SCORE 95 New sprinkler system for multi-family dwelling Client: Village Northfield | Permit type: Fire | Permit status: Cmp | Completion date: February 10, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-00608 | |||||
Basement finish of 5 sf to create recreation room and a full bath utilizing existing rough-ins. ( 6 sf total, 1 sf mechanical storage room to remain unfinished) (rough-in from pmt2009-04944 used) Date: July 1, 2010 Value: $35,528 Client: Devin Nordson | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: October 12, 2010 | Current use: Townhomes, remodel | Permit id: Pmt2010-02684 |