Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Permit type: Excavation; sewer lateral connection to 4" (trench) | Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | |||||
SCORE 99 Refer to approved traffic control plan (tcp) for permitted hours of work; dc water lead replacement contract #1000 - corinthian contractors ts the contractor; excavation and removal of existing lead service and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard; attached plans and conditions are part of this permit Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: July 30, 2012 | Permit id: Pa70977 | |||||
SCORE 96 Steel plate- single location Permit status: Expired | Expiration date: June 16, 2012 | Permit id: Pa10062302 | |||||
SCORE 96 Roll off debris container Permit status: Expired | Expiration date: July 7, 2012 | Permit id: Pa10059772 | |||||
SCORE 96 Roll off debris container Permit status: Expired | Expiration date: April 13, 2012 | Permit id: Pa10053480 | |||||
SCORE 59 Moving truck Permit status: Expired | Expiration date: December 8, 2012 | Permit id: Pa10080855 | |||||
SCORE 100 Construction staging area Permit status: Expired | Expiration date: June 22, 2012 | Permit id: Pa10060461 | |||||
SCORE 89 Construction staging area Permit status: Expired | Expiration date: July 10, 2012 | Permit id: Pa10061421 | |||||
SCORE 99 Excavation; repair water service lateral Permit status: 8 | Expiration date: July 30, 2012 | Permit id: Pa70977 | |||||
SCORE 99 Excavation; sewer lateral connection to 4" (trench) Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 86 Refer to approved traffic control plan (tcp) for permitted hours of work; dc water lead replacement contract #1000 - corinthian contractors ts the contractor; excavation and removal of existing lead service and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard; attached plans and conditions are part of this permit Permit status: Permit expired | Expiration date: July 30, 2012 | Permit id: Pa70977 | |||||
SCORE 100 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 99 Excavation; sewer lateral connection to 4" (trench) Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 95 Replace gas service, at 411 varnum st nw between grant circle nw and 4th st nw, permit#144808 attached sketch condition of permit. Permit type: Excavation; gas connection (trench) | Permit status: Permit expired | Expiration date: July 31, 2012 | Permit id: Pa71551 | |||||
SCORE 100 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0 |