Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
#2 oil boiler: make all necessary repairs to restore #2 oil boiler to proper working order to include hot water heater. Restore hot water / heat to a Date: May 15, 2003 Permit type: Heat | Permit id: E321665 | |||||
#2 oil boiler: make all necessary repairs to restore #2 oil boiler to proper working order to include hot water heater. Restore hot water heat to a Date: May 15, 2003 Permit type: Heat | Permit id: E321665 | |||||
Apartment # 1f: wash all mold and mildew with water solution through out two front rooms, walls, ceilings and windows. Then apply stain killer, pri Date: February 3, 2003 Permit type: Gc | Permit id: E314318 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: February 6, 2003 Permit type: Util | Permit id: E315122 | |||||
Provide single fuel drop. 5 gallons, # fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fue Date: June 24, 2003 Permit type: Util | Permit id: E325682 | |||||
Make all necessary repairs to #2 oil fired boiler to restore to proper working order to produce adequate hot water. Note: contractor must contact h Date: July 17, 2003 Permit type: Heat | Permit id: E400255 | |||||
Remove rubbish from cellar approximately cubic yards. Note: contractor must contact hpd at 718 636-3035 with start date. Contractor must sign Date: April 18, 2003 Permit type: Gc | Permit id: E319850 | |||||
Clear existing stoppage. Clean and sanitize basement area. Repair cracked stack line west side of building. Tie / connect four (4) existing sewer l Date: January 29, 2003 Permit type: Plumb | Permit id: E313510 | |||||
Repair all leaks in basement. Install shut-off valves at base of all risers. Restore water to boiler and water heaters. Date: March 26, 2003 Permit type: Plumb | Permit id: E317196 | |||||
Clear main sewer house trap from trap to street and from house trap into building. Pump out all water and sewage from basement. Vaccum dry and sprea Date: April 4, 2003 Permit type: Stopag | Permit id: E319852 | |||||
Remove raw sewage from the base also broom sweep entire basement floor sanitize with lime. Note: contractor must contact hpd 718-636-3037 or 718-63 Date: June 25, 2003 Permit type: Stopag | Permit id: E325469 | |||||
Public hall: provide labor and material to install one new concept lock. Provide 3 new key for each tenant. Note:contractor must contact hp Date: May 29, 2003 Permit type: Intcom | Permit id: E322975 | |||||
Restore heating plant to proper working order (fuel delivered). Date: January 17, 2003 Value: $275 Permit type: Heat | Permit id: E313567 | |||||
Public hall: replace entrance door lock. Date: January 16, 2003 Value: $276 Permit type: Gc | Permit id: E313516 | |||||
SCORE 100 Date: November 21, 2000 Contractor: Larry Linzer Client: Oral Green | Client Address: 2058 Rockaway Bk Ny 11236 | Client Phone: (718) 251-3194 | Client Company: Extra Touch Corp. | Permit status: Initial | Permit id: 301134984 | |||||
SCORE 84 Date: December 27, 2000 Contractor: Leslie Munch Client: Oral Green | Client Address: 4024 Farragut Road Brooklyn Ny 11210 | Client Phone: (718) 251-3194 | Client Company: Na | Permit status: Initial | Permit id: 301101563 | |||||
Clear existing stoppage. Clean and sanitize basement area. Repair cracked stack line west side of building. Tie connect four (4) existing sewer l Date: January 29, 2003 Permit type: Plumb | Permit id: E313510 | |||||
#2 oil boiler: restore oil boiler to proper working order. The cast iron boiler has leaks. Boiler needs oil (275) gallons in tank. Note: contra Date: March 13, 2003 Permit type: Heat | Permit id: E317190 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: June 10, 2003 Permit type: Util | Permit id: E324572 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: March 25, 2003 Permit type: Util | Permit id: E318801 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb Date: January 15, 2003 Permit type: Util | Permit id: E313469 |