Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7. 54 kv solar instatllation Date: November 3, 2013 Contractor: Artisan Electric Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 19, 2013 | Expiration date: November 3, 2014 | Current use: Single family / duplex | Permit id: 6390436 | |||||
SCORE 99 Hook up generator and generator subpanel Date: May 8, 2007 Contractor: Hansen Electric Incorporated Permit type: Electrical | Permit status: Permit finaled | Completion date: October 2, 2007 | Expiration date: May 7, 2008 | Current use: Single family / duplex | Permit id: 6138739 |