Bfd smoke/co inspection and Date: July 17, 2015 Client: Jain Nitin B | Expiration date: September 15, 2015 | Current use: 1unit | Permit id: Smk493818 | Parcel: 2008068018 | |||||
Bfd smoke/co inspection and Date: June 30, 2015 Client: Jain Nitin B | Expiration date: August 29, 2015 | Current use: 1unit | Permit id: Smk483400 | Parcel: 2008068018 | |||||
SCORE 98 Replacing boiler Client: Popp Sabrina M | Permit type: Gas permit | Expiration date: March 2, 2012 | Current use: 1-2fam | Permit id: G93961 | Parcel: 2008135000 | |||||
SCORE 98 Water pipe to boiler Client: Popp Sabrina M | Permit type: Plumbing permit | Expiration date: March 2, 2012 | Current use: 1-2fam | Permit id: Pl93963 | Parcel: 2008135000 | |||||
SCORE 70 Removal of back 4 feet of porch from the property line to bring deck in line with zoning requirements for west roxbury and to address issues for building inspector violationv257919 and original violation # 113. 1. Also will be putting up temporary fencing on the new back of the porch for privacy. This will be picket fence sheets meant to be removed with later modification of the porch to complete the work. Client: Popp Sabrina M | Permit type: Short form bldg permit | Expiration date: March 28, 2016 | Current use: 1-2fam | Permit id: Sf523666 | Parcel: 2008135000 | |||||
SCORE 70 Change deck shape.; homeowners waiver Client: Popp Sabrina | Permit type: Long form/alteration permit | Expiration date: April 11, 2017 | Current use: 1-2fam | Permit id: Alt627939 | Parcel: 2008135000 | |||||
Transportation department in concert with the mbta will allow for the closing of lagrange street from centre to vfw parkway in both directions during bridge replacement; fron 9 25 ; @ 6 am to; 9 26 at 6 am; ; boston police detail area e; [ 6 officers ]; Date: October 11, 2016 Client: Bustillo Norbely Etal | Permit type: Street occupancy permit | Expiration date: November 14, 2016 | Permit id: Occu-639145 | Parcel: 2008815000 | |||||
SCORE 89 Remove the mbta commuter rail bridge over lagrange street west roxbury by torch cutting to prepare for replacing the bridge. The bridge does not have an address but it is adjacent to the mtba commuter rail parking lot located at 4 lagrange street west roxbury Date: November 2, 2016 Contractor: Barry Ketschke Client: Mass Bay Transp Auth | Permit type: Bfd cutting-burning-welding | Permit id: Cbw650361 | Parcel: 2008871001 | |||||
Bfd application tank removal Date: November 8, 2016 Client: Penate Mario Mendez | Permit id: Bfdatr651180 | Parcel: 2008067000 | |||||
Bfdalteration of fuel oil burn Date: November 8, 2016 Client: Penate Mario Mendez | Permit id: Alfob651178 | Parcel: 2008067000 | |||||
Install conduit between poles; 1551 2; x 15" rdwy; 9:30am-3:30pm; boston police detail area;e ;343-4556; (1); Date: April 22, 2016 Permit type: Excavation permit | Expiration date: May 10, 2016 | Permit id: Exca-583023 | |||||
Excavate manhole to rod &; rope conduit for; fios; (2); 6 x 4 rdwy; 7am-4pm; weekends only; boston police detail area e; 343-4556; Date: July 26, 2016 Client: Bustillo Norbely Etal | Permit type: Excavation permit | Expiration date: August 26, 2016 | Permit id: Exca-616361 | Parcel: 2008815000 | |||||
Repair damaged conduit; 1 x 2; ; boston police area e; 343-4556; ; 9; am to 3: pm Date: April 29, 2016 Client: Bustillo Norbely Etal | Permit type: Excavation permit | Expiration date: May 31, 2016 | Permit id: Exca-584415 | Parcel: 2008815000 | |||||
SCORE 86 Strip and reroof Client: Penate Mario Mendez | Permit type: Short form bldg permit | Expiration date: June 12, 2017 | Current use: 1-2fam | Permit id: Sf664661 | Parcel: 2008067000 | |||||
Non-excavations of manholes; nwm; renewal Date: June 27, 2017 Client: Penate Mario Mendez | Permit type: Street occupancy permit | Expiration date: May 20, 2015 | Permit id: Occu-439112 | Parcel: 2008067000 |