Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Excavate to build addtl telecom conduit from mh-p lateral service feed; place innerduct in new section for fttp overlay plan (ewo: 8a01364) on "fios drawdown acct". Date: March 1, 2012 Contractor: Verizon Inc Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: July 4, 2012 | Permit id: Pa69914 | |||||
SCORE 95 Construction staging area Date: May 11, 2012 Contractor: Verizon Verizon Permit status: Expired | Expiration date: June 8, 2012 | Permit id: Pa10055308-R1 | |||||
SCORE 88 Excavate to build addtl telecom conduit from mh-p lateral service feed; place innerduct in new section for fttp overlay plan (ewo: 8a01364) on "fios drawdown acct". Date: March 29, 2012 Contractor: Verizon Inc Permit status: Permit expired | Expiration date: July 4, 2012 | Permit id: Pa69914 |