RENOVATION HISTORY
Based on the information received from building department, associated with 39 City Ave Philadelphia PA 191312905 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Administrative permit
Date:  August 17, 2015

Client: Post Presidential Propert | Permit status: Expired | Permit id: 624739
2015/08/1709539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  July 7, 2011

Client: Post Presidential Propert | Permit status: Expired | Permit id: 349999
2011/07/0709539 City Ave Philadelphia Pa 19131 2905
Zoning/use permit
Date:  December 7, 2009

Client: Post Presidential Propert | Permit status: Completed | Permit id: 245654
2009/12/0709539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  October 3, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 538059
2014/10/0309539 City Ave Philadelphia Pa 19131 2905
Plumbing permit
Date:  August 3, 2015

Client: Post Presidential Propert | Permit status: Active | Permit id: 605702
2015/08/0309539 City Ave Philadelphia Pa 19131 2905
Zoning/use permit
Date:  June 22, 2011

Client: Post Presidential Propert | Permit status: Completed | Permit id: 343201
2011/06/2209539 City Ave Philadelphia Pa 19131 2905
Use permit
Date:  December 4, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 577613
2014/12/0409539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  February 5, 2010

Client: Post Presidential Propert | Permit status: Expired | Permit id: 252777
2010/02/0509539 City Ave Philadelphia Pa 19131 2905
Administrative permit
Date:  December 3, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 509261
2013/12/0309539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  August 26, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 627947
2015/08/2609539 City Ave Philadelphia Pa 19131 2905
Suppression permit
Date:  June 2, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 275925
2010/06/0209539 City Ave Philadelphia Pa 19131 2905
Use permit
Date:  July 6, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 621818
2015/07/0609539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  July 16, 2008

Client: Post Presidential Propert | Permit status: Completed | Permit id: 163451
2008/07/1609539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  May 3, 2016

Client: Post Presidential Property Owner Llc | Permit status: Active | Permit id: 670035
2016/05/0309539 City Ave Philadelphia Pa 19131 2905
Plumbing permit
Date:  April 8, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 522738
2014/04/0809539 City Ave Philadelphia Pa 19131 2905
Administrative permit
Date:  January 25, 2016

Client: Post Presidential Property Owner Llc | Permit status: Completed | Permit id: 665743
2016/01/2509539 City Ave Philadelphia Pa 19131 2905
Zoning/use permit
Date:  June 4, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 612192
2015/06/0409539 City Ave Philadelphia Pa 19131 2905
Suppression permit
Date:  September 8, 2016

Client: Post Presidential Property Owner Llc | Permit status: Active | Permit id: 711379
2016/09/0809539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  March 2, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 258875
2010/03/0209539 City Ave Philadelphia Pa 19131 2905
Demolition permit
Date:  June 8, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 615869
2015/06/0809539 City Ave Philadelphia Pa 19131 2905
Mechanical permit
Date:  April 5, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 260648
2010/04/0509539 City Ave Philadelphia Pa 19131 2905
Plumbing permit
Date:  October 29, 2013

Client: Post Presidential Propert | Permit status: Expired | Permit id: 503100
2013/10/2909539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  February 27, 2015

Client: Post Presidential Propert | Permit status: Active | Permit id: 580781
2015/02/2709539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  April 22, 2013

Client: Post Presidential Propert | Permit status: Expired | Permit id: 462602
2013/04/2209539 City Ave Philadelphia Pa 19131 2905
Suppression permit
Date:  September 8, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 546934
2014/09/0809539 City Ave Philadelphia Pa 19131 2905
Suppression permit
Date:  November 4, 2015

Client: Post Presidential Propert | Permit status: Active | Permit id: 625890
2015/11/0409539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  June 11, 2012

Client: Post Presidential Propert | Permit status: Abandoned | Permit id: 410200
2012/06/1109539 City Ave Philadelphia Pa 19131 2905
Demolition permit
Date:  April 11, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 530214
2014/04/1109539 City Ave Philadelphia Pa 19131 2905
Administrative permit
Date:  December 27, 2012

Client: Post Presidential Propert | Permit status: Completed | Permit id: 445100
2012/12/2709539 City Ave Philadelphia Pa 19131 2905
Demolition permit
Date:  June 3, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 475172
2013/06/0309539 City Ave Philadelphia Pa 19131 2905
Administrative permit
Date:  April 24, 2007

Client: Post Presidential Propert | Permit status: Completed | Permit id: 67672
2007/04/2409539 City Ave Philadelphia Pa 19131 2905
Electrical permit
Date:  June 3, 2011

Client: Post Presidential Propert | Permit status: Expired | Permit id: 343641
2011/06/0309539 City Ave Philadelphia Pa 19131 2905
Administrative permit
Date:  April 14, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 265932
2010/04/1409539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  May 13, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 535890
2014/05/1309539 City Ave Philadelphia Pa 19131 2905
Administrative permit
Date:  April 2, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 522405
2014/04/0209539 City Ave Philadelphia Pa 19131 2905
Mechanical permit
Date:  October 22, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 500541
2013/10/2209539 City Ave Philadelphia Pa 19131 2905
Plumbing permit
Date:  August 4, 2016

Client: Post Presidential Property Owner Llc | Permit status: Active | Permit id: 690044
2016/08/0409539 City Ave Philadelphia Pa 19131 2905
New construction permit
Date:  June 17, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 598223
2015/06/1709539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  May 4, 2016

Client: Post Presidential Propert | Permit status: Active | Permit id: 649718
2016/05/0409539 City Ave Philadelphia Pa 19131 2905
Mechanical permit
Date:  December 3, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 536300
2014/12/0309539 City Ave Philadelphia Pa 19131 2905
Use permit
Date:  April 22, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 466425
2013/04/2209539 City Ave Philadelphia Pa 19131 2905
Mechanical permit
Date:  October 1, 2015

Client: Post Presidential Propert | Permit status: Active | Permit id: 628693
2015/10/0109539 City Ave Philadelphia Pa 19131 2905
Plumbing permit
Date:  February 5, 2008

Client: Post Presidential Propert | Permit status: Completed | Permit id: 130451
2008/02/0509539 City Ave Philadelphia Pa 19131 2905
Permit for the erection of one (1) statically illuminated wall sign; size & location as shown in application. For use as household living for (181) units with accessory private parking lot & signage on the same lot as all other uses as previously approved.
Date:  June 19, 2015

Client: Post Presidential Propert | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted | Completion date: August 27, 2015 | Permit id: 25398
2015/06/1909539 City Ave Philadelphia Pa 19131 2905
Permit for the legalization of the erection of a roof deck above an existing detached accessory structure. Size and location as shown in application. For use as accessory personal services (fitness center) to an existing multi-family household living use [one hundred eighty one (181) dwelling units in washington house] with other previously approved uses parking and signs. No signs on this application.
Date:  January 14, 2015

Client: Post Presidential Propert | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted | Completion date: April 24, 2015 | Permit id: 24414
2015/01/1409539 City Ave Philadelphia Pa 19131 2905
Alteration permit
Date:  May 13, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 535890
2014/05/1309539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  June 17, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 617454
2015/06/1709539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  September 26, 2012

Client: Post Presidential Propert | Permit status: Completed | Permit id: 429355
2012/09/2609539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  June 19, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 613850
2015/06/1909539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  December 3, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 509261
2013/12/0309539 City Ave Philadelphia Pa 191312905
Suppression permit
Date:  January 8, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 513409
2014/01/0809539 City Ave Philadelphia Pa 191312905
Alteration permit
Date:  July 7, 2011

Client: Post Presidential Propert | Permit status: Expired | Permit id: 349999
2011/07/0709539 City Ave Philadelphia Pa 191312905
Alteration permit
Date:  April 22, 2013

Client: Post Presidential Propert | Permit status: Expired | Permit id: 462602
2013/04/2209539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  May 18, 2016

Client: Post Presidential Property Owner Llc | Permit status: Expired | Permit id: 684870
2016/05/1809539 City Ave Philadelphia Pa 191312905
Mechanical permit
Date:  April 5, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 260648
2010/04/0509539 City Ave Philadelphia Pa 191312905
Suppression permit
Date:  May 26, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 275604
2010/05/2609539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  April 24, 2007

Client: Post Presidential Propert | Permit status: Completed | Permit id: 67672
2007/04/2409539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  February 3, 2010

Client: Post Presidential Propert | Permit status: Expired | Permit id: 259846
2010/02/0309539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  October 11, 2012

Client: Post Presidential Propert | Permit status: Completed | Permit id: 432117
2012/10/1109539 City Ave Philadelphia Pa 191312905
Zoning use permit
Date:  August 25, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 606079
2015/08/2509539 City Ave Philadelphia Pa 191312905
Plumbing permit
Date:  August 4, 2016

Client: Post Presidential Property Owner Llc | Permit status: Active | Permit id: 690044
2016/08/0409539 City Ave Philadelphia Pa 191312905
Suppression permit
Date:  September 8, 2016

Client: Post Presidential Property Owner Llc | Permit status: Active | Permit id: 711379
2016/09/0809539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  April 14, 2010

Client: Post Presidential Propert | Permit status: Completed | Permit id: 265932
2010/04/1409539 City Ave Philadelphia Pa 191312905
Mechanical permit
Date:  December 3, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 536300
2014/12/0309539 City Ave Philadelphia Pa 191312905
Alteration permit
Date:  February 27, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 580781
2015/02/2709539 City Ave Philadelphia Pa 191312905
Demolition permit
Date:  March 27, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 527047
2014/03/2709539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  June 3, 2011

Client: Post Presidential Propert | Permit status: Expired | Permit id: 343641
2011/06/0309539 City Ave Philadelphia Pa 191312905
Demolition permit
Date:  May 9, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 470343
2013/05/0909539 City Ave Philadelphia Pa 191312905
New construction permit
Date:  June 17, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 598223
2015/06/1709539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  October 14, 2014

Client: Post Presidential Propert | Permit status: Expired | Permit id: 567863
2014/10/1409539 City Ave Philadelphia Pa 191312905
Plumbing permit
Date:  October 29, 2013

Client: Post Presidential Propert | Permit status: Expired | Permit id: 503100
2013/10/2909539 City Ave Philadelphia Pa 191312905
Plumbing permit
Date:  August 28, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 634212
2015/08/2809539 City Ave Philadelphia Pa 191312905
Suppression permit
Date:  November 4, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 625890
2015/11/0409539 City Ave Philadelphia Pa 191312905
Plumbing permit
Date:  April 8, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 522738
2014/04/0809539 City Ave Philadelphia Pa 191312905
Alteration permit
Date:  May 4, 2016

Client: Post Presidential Propert | Permit status: Active | Permit id: 649718
2016/05/0409539 City Ave Philadelphia Pa 191312905
Mechanical permit
Date:  October 22, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 500541
2013/10/2209539 City Ave Philadelphia Pa 191312905
Plumbing permit
Date:  February 5, 2008

Client: Post Presidential Propert | Permit status: Completed | Permit id: 130451
2008/02/0509539 City Ave Philadelphia Pa 191312905
Use permit
Date:  August 7, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 554510
2014/08/0709539 City Ave Philadelphia Pa 191312905
Alteration permit
Date:  February 5, 2010

Client: Post Presidential Propert | Permit status: Expired | Permit id: 252777
2010/02/0509539 City Ave Philadelphia Pa 191312905
Zoning use permit
Date:  December 7, 2009

Client: Post Presidential Propert | Permit status: Completed | Permit id: 245654
2009/12/0709539 City Ave Philadelphia Pa 191312905
Electrical permit
Date:  July 16, 2008

Client: Post Presidential Propert | Permit status: Completed | Permit id: 163451
2008/07/1609539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  April 2, 2014

Client: Post Presidential Propert | Permit status: Completed | Permit id: 522405
2014/04/0209539 City Ave Philadelphia Pa 191312905
Demolition permit
Date:  June 8, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 615869
2015/06/0809539 City Ave Philadelphia Pa 191312905
Mechanical permit
Date:  October 1, 2015

Client: Post Presidential Propert | Permit status: Active | Permit id: 628693
2015/10/0109539 City Ave Philadelphia Pa 191312905
Administrative permit
Date:  January 25, 2016

Client: Post Presidential Property Owner Llc | Permit status: Completed | Permit id: 665743
2016/01/2509539 City Ave Philadelphia Pa 191312905
Use permit
Date:  April 22, 2013

Client: Post Presidential Propert | Permit status: Completed | Permit id: 466425
2013/04/2209539 City Ave Philadelphia Pa 191312905
Use permit
Date:  July 6, 2015

Client: Post Presidential Propert | Permit status: Completed | Permit id: 621818
2015/07/0609539 City Ave Philadelphia Pa 191312905
Zoning use permit
Date:  June 22, 2011

Client: Post Presidential Propert | Permit status: Completed | Permit id: 343201
2011/06/2209539 City Ave Philadelphia Pa 191312905
Permit for the legalization of the erection of a roof deck above an existing detached accessory structure. Size and location as shown in application. For use as accessory personal services (fitness center) to an existing multi-family household living use [one hundred eighty one (181) dwelling units in washington house] with other previously approved uses parking and signs. No signs on this application.
Date:  January 14, 2015

Client: Post Presidential Propert | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted | Completion date: April 24, 2015 | Permit id: 24414
2015/01/1409539 City Ave Philadelphia Pa 191312905
Permit for the erection of one (1) statically illuminated wall sign; size & location as shown in application. For use as household living for (181) units with accessory private parking lot & signage on the same lot as all other uses as previously approved.
Date:  June 19, 2015

Client: Post Presidential Propert | Applicant: Ronald J. Patterson, Esq | Permit type: Appeal | Permit status: Granted | Completion date: August 27, 2015 | Permit id: 25398
2015/06/1909539 City Ave Philadelphia Pa 191312905
SCORE
96
Construction of pool storage building. Separate amended permit is required for special inspections
Date:  June 17, 2015

Client: Post Presidential Propert | Permit type: New construction permit | Permit status: Completed | Completion date: June 6, 2016 | Permit id: 598223
2015/06/1709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
Ez windows in existing openings as per ez window standards obtain permits for replacement of exterior windows and doors without submitting plans by meeting the conditions and design limitations below. Any deviations from this permit standard will result in permit revocation. (no permit shall be required for replacement of non-fire resistance rated windows doors without structural change on one- and twofamily dwellings [no changes in location, shape or size of existing openings.]) conditions ? Replacement of window door shall remain in the same location and of the same size as the original opening. ? Distance from any interior lot line to the exterior wall opening replaced shall not be less than thirty (30) feet. ? Ez permit process shall not be applicable to buildings with greater than 40% vertical fenestration on above grade walls. ? Ez permit process shall not be applicable to buildings listed as historic as established by the philadelphia historical commission. ? Changes in location
Date:  May 13, 2014

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: November 28, 2015 | Permit id: 535890
2014/05/1309639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
For int. Demo. Of partition walls throughout building w. Partial floor clng. Demo. & for a partial change of occupancy classification @ ground floor & level iii alterations throughout an exist. High-rise mixed-use apartment building to include erection of partition walls for dwelling units spaces, creation of common assembly spaces, & installation of new communicating stair @ 2nd floor office; building to be fully sprinklered. Separate permit required for certificate of occupancy (co) of newly created tenant spaces, approval of special inspectors (amended permit), new work at future roof deck area (amended permit), mechanical, electrical, plumbing, & fire suppression work. Asbestos abatement to be completed prior to commencement of permitted work.
Date:  February 27, 2015

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: October 31, 2016 | Permit id: 580781
2015/02/2709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
93
Replace 4-existing detector with new & replace control panel 120v 20amp ckts to power as per nfpa 72 west district
Date:  June 1, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Expired | Completion date: August 12, 2015 | Permit id: 606016
2015/06/0109339 City Ave Philadelphia Pa 191312905Swartley Bros Engineers Inc
For the erection of one (1) statically illuminated wall sign; size & location as shown in application. For use as household living for (181) units with accessory private parking lot & signage on the same lot as all other uses as previously approved.
Date:  August 25, 2015

Client: Post Presidential Propert | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 25, 2015 | Permit id: 606079
2015/08/2509539 City Ave Philadelphia Pa 191312905
SCORE
100
Install (2) 25 (1) from antennas on rooftop to existing steel platrom on ground per 2008 nec
Date:  June 11, 2012

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Abandoned | Completion date: March 18, 2013 | Permit id: 410200
2012/06/11010039 City Ave Philadelphia Pa 191312905Landair Wireless Ltd
SCORE
96
Wire in electric, five pump to buildings, madison, jefferson,adams,washington (75 hp 3 phase 208v) as per plans 2008 nec (west district)
Date:  July 20, 2010
Contractor: John Finnerty

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 281307
2010/07/2009639 City Ave Philadelphia Pa 191312905John Finnerty
SCORE
100
Conversion of existing standpipe to wet standpipe. Includes installation of fire pump
Date:  June 22, 2010

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: October 26, 2010 | Permit id: 275607
2010/06/22010039 City Ave Philadelphia Pa 191312905B. M. Consulting Services Inc
SCORE
96
Temporary certificate of occupancy. This following units are excluded from this application. Residentual units were exterior hoist and trash chute had been located.
Date:  October 29, 2015

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: November 20, 2015 | Permit id: 648571
2015/10/2909639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Alterations to existing commercial cooking extinguishing system.
Date:  June 14, 2010
Contractor: Chefs Design Inc

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: July 7, 2010 | Permit id: 276518
2010/06/14010039 City Ave Philadelphia Pa 191312905Chefs Design Inc
SCORE
95
Erect 3 antennas, remove 3 antennas, erect 6 rrhs, 3 distribution boxes and 1 equip cabinet.
Date:  July 7, 2011

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Expired | Completion date: October 18, 2016 | Permit id: 349999
2011/07/0709539 City Ave Philadelphia Pa 191312905Westower Communications Inc
SCORE
99
Installing dc cable from existing power plant to feed the new lte equipment rack grounding to building halo per 2008 nec (cell site)
Date:  September 26, 2012

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: October 16, 2012 | Permit id: 429355
2012/09/2609939 City Ave Philadelphia Pa 191312905Skinner And Cook Inc
SCORE
100
Replace all soil & water lines, install new cold & hot & hot water return, installation new fixtures of kit sinks, lavs, water closets, tubs & shower, install mop sink & washing machines the installation will comply with the philadelphia plumbing code 2004 the backflow prevention devices for the building water main will be handled by separate contractors on separate permits
Date:  August 3, 2015
Contractor: Ferman Mc Gee

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 1, 2016 | Permit id: 605702
2015/08/03010039 City Ave Philadelphia Pa 191312905Ferman Mc Gee
SCORE
100
Installing an automatic clean agent fire suppression system per nfpa 2001 standard and plans. Separate permit required for electrical work.
Date:  June 12, 2015

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: January 6, 2017 | Permit id: 603200
2015/06/12010039 City Ave Philadelphia Pa 191312905Suppression Systems Inc
SCORE
96
For level iii alterations to the seventh trough twelfth floor of an existing building. Alteration to include the erection of partition walls, provide accessibility improvements and finishes throughout. All work to be done per approved plans. Separate permits required for mechanical, electrical, plumbing and fire suppression work.
Date:  August 19, 2014

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: December 15, 2015 | Permit id: 553023
2014/08/1909639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
No change in use and occupancy classification. Interior demolition of non load bearing partitions. Level iii interior alterations to create 3 dwelling, gym lounge area at the 1st floor lounge, and accessory spaces. Work to include upgrades to finishes, fire rated partitions, interior lighting work, and all other work as per approved plans. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. Ensure type a and type b dwellings are provided. Asbestos abatement required prior to commencement of work.
Date:  May 4, 2016

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: August 3, 2017 | Permit id: 649718
2016/05/0409639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
83
Install new heat pumps(4) & 2 make up air units with ductworkper plan.
Date:  April 5, 2010
Contractor: J M Oliver Inc

Client: Post Presidential Propert | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 5, 2010 | Permit id: 260648
2010/04/0508339 City Ave Philadelphia Pa 191312905J M Oliver Inc
SCORE
100
Conversion of existing standpipe to wet standpipe. Includes installation of fire pump.
Date:  May 26, 2010

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: October 26, 2010 | Permit id: 275604
2010/05/26010039 City Ave Philadelphia Pa 191312905B. M. Consulting Services Inc
SCORE
100
Install two empty conduits (2") for future use. Both ends to be capped, no wire installed at this time.. Additional permits required for installation of conductors, wiring and equipment to complete this project. In accordance with 2008 nec
Date:  June 3, 2011

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Expired | Completion date: June 3, 2011 | Permit id: 343641
2011/06/03010039 City Ave Philadelphia Pa 191312905Sommerville William
SCORE
93
Power wiring for new hvac equipment as per 2005 nec (west district)
Date:  February 3, 2010
Contractor: Noone John

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Expired | Completion date: February 3, 2010 | Permit id: 259846
2010/02/0309339 City Ave Philadelphia Pa 191312905Noone John
SCORE
100
Install electric fire pump and interconnect existing standpipes at basement. Existing bfp.
Date:  June 2, 2010

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: October 26, 2010 | Permit id: 275925
2010/06/02010039 City Ave Philadelphia Pa 191312905B. M. Consulting Services Inc
SCORE
100
Install new electrical wiring and comminication lines in common areas & apartments & install 125a panel in each apt, switches, receptacles, light fixtures, smoke detectors, cable & 2nd phones jacks as per nec 2008 west district
Date:  November 30, 2016
Contractor: Vtech Electric Inc

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2017 | Permit id: 698945
2016/11/30010039 City Ave Philadelphia Pa 191312905Vtech Electric Inc
SCORE
96
Level iii alterations to existing accessory detached pool house and fitness center to include certificate of occupancy (previously uncertified) as per approved plans. Separate permit required to legalize roof deck. Amended permit required if underpinning is necessary. Separate permits required for any mep work
Date:  January 21, 2015

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 575939
2015/01/2109639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
145 square feet of interior demolition in the cabanas and poolhouse, of non load bearing walls and ceilings only. No other work allowed under this permit. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts. Contact streets department for dumpster permit and footway closure permits.
Date:  March 27, 2014

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 527047
2014/03/2709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
New fire and evax panels, 4 speakers, 114 speakers strobes, 29 smokes, 29 pull stations, sprinkler equipment as per nfpa 72 west district
Date:  August 26, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: August 23, 2016 | Permit id: 627947
2015/08/26010039 City Ave Philadelphia Pa 191312905B H Holding Company
SCORE
96
Interior demolition of non load bearing walls and ceilings only on floors 6-12 washington building 500 square feet, interior demolition of non load bearing walls and ceilings only. No other work allowed under this permit. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts. Contact streets department for dumpster permit and footway closure permits.
Date:  March 12, 2014

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Completed | Completion date: November 6, 2014 | Permit id: 522913
2014/03/1209639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Install new fire alarm evac, 1 panel, 4 speakers, 114 speaker strobes, 29 smokes, 29 pull stations, sprinker pumps as per nfpa72 (west district)
Date:  September 9, 2014

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: November 18, 2015 | Permit id: 554249
2014/09/09010039 City Ave Philadelphia Pa 191312905B H Holding Company
SCORE
96
Tco fro 2nd floor only
Date:  May 17, 2015

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: June 17, 2015 | Permit id: 610721
2015/05/1709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Install new substation with 15 kva transformer and 15kv 600a primary switch, 4000a sentron busway, 13-800a dp panel board, hp panelboards, ep panelboards, 250kv generac generator, 400a automatic tranfer switches, recon existing fp per 2008 nec (apt bldg)
Date:  September 22, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: December 28, 2015 | Permit id: 613756
2015/09/22010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
96
Amend permit number 575939 to legalize roof deck above existing detached accessory pool house fitness center as per approved plans. Roof structure can support additional loads per attached letter from pe. New l. O. To be issued for roof deck.
Date:  June 9, 2015

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 607122
2015/06/0909639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
For the erection of three (3) three panel antennas on rooftop non-penetrating sled mount and three (3) dish antennas, and one (1) equipment cabinets to an existing penthouse wall. Size and location as shown in the application. Antennas and accessory equipment for use as wireless services as part of the existing wireless facility and appartment building with other uses as previously approved
Date:  December 7, 2009

Client: Post Presidential Propert | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 19, 2013 | Permit id: 245654
2009/12/0709539 City Ave Philadelphia Pa 191312905
SCORE
100
Replace 2-wc, 2-lav, 1-handicap bathroom, 1-service sink & 2-3" floor drain & install kitchen sink (office & apartments)
Date:  October 29, 2013
Contractor: Ferman Mc Gee

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Expired | Completion date: June 18, 2014 | Permit id: 503100
2013/10/29010039 City Ave Philadelphia Pa 191312905Ferman Mc Gee
C o not required
Date:  April 14, 2010

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: July 19, 2010 | Permit id: 265932
2010/04/1409539 City Ave Philadelphia Pa 191312905
SCORE
96
Interior demolition of non load bearing walls and ceiling only. No other work allowed under this permit. Contact streets department for dumpster permit and footway closure. Call inspector for an intial inspection prior to the start of work.
Date:  April 11, 2014

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 530214
2014/04/1109639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Install bonding for 3 new swimming pools as per 2008 nec (west district)
Date:  January 12, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: December 4, 2015 | Permit id: 584131
2015/01/12010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
99
Renovation exist bldg for fitness center & pool house, install floor drain in pool equipment frrom to 5 outside foundation wall note: the installation will comply with the philadelphia plumbing code 2004
Date:  April 2, 2015
Contractor: Worth And Company

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 11, 2016 | Permit id: 595089
2015/04/0209939 City Ave Philadelphia Pa 191312905Worth And Company
SCORE
100
Installation of three (3) roof top units one ductless unit and associated ductwork with registers and diffusers as per approved plans.
Date:  October 1, 2015
Contractor: Talgar Inc

Client: Post Presidential Propert | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 628693
2015/10/01010039 City Ave Philadelphia Pa 191312905Talgar Inc
SCORE
100
For the installation of an automatic fire suppression system on floors 2-12 of an existing high-rise building. New sprinkler heads to use existing standpipe system, 6" fire service main line, and backflow prevention assembly.
Date:  November 4, 2015

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: November 1, 2016 | Permit id: 625890
2015/11/04010039 City Ave Philadelphia Pa 191312905B. M. Consulting Services Inc
SCORE
100
For the installation of four (4) rooftop units and hvac system throughout a 12-story building. Work includes new ductless systems, registers diffusers, fans, exhausts and all supplemental ductwork.
Date:  December 3, 2014
Contractor: Talgar Inc

Client: Post Presidential Propert | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 536300
2014/12/03010039 City Ave Philadelphia Pa 191312905Talgar Inc
SCORE
96
Extension of permit # 462602 pursuant to pa act 46 of 20 as modified by act 87 of 2012. This extension to expire on july 1, 2016 unless extended by other portions of the philadelphia code. Contact district office to institute the required inspections.
Date:  December 3, 2013

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 509261
2013/12/0309639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
Interior demolition of non load bearing walls and ceiling only. Other work allowed under this permit. Contact streets department for dumpster permit and footway closure. No
Date:  June 3, 2013

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Completed | Completion date: July 2, 2014 | Permit id: 475172
2013/06/0309639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
Existing service elevator renovations, structural modifications for new elevator machine room floor framing, penthouse framing, and concrete floor slab. Remove and replace existing cmu walls, new support framing machine beam installations for new structural loads, as per engineered plans and attachment.
Date:  August 1, 2013

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Expired | Completion date: February 27, 2015 | Permit id: 484703
2013/08/0109639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Washington building - 1st & 2nd floors - replace the copper water supply piping mains and the domestic water pressure booster pump - no connections to fixtures
Date:  June 12, 2014

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2015 | Permit id: 542540
2014/06/12010039 City Ave Philadelphia Pa 191312905Adelphia Plumbing And Htng Corp
SCORE
96
To amend bldg. Prmt# 580781, issd. For alts thru-out high-rise multi-fam bldg., to increase the # of dwllng. Unts from (257) to (265), create grp. B spaces at prvs residential units, close off 2nd floor low roof to eliminate access, & other adjustments throughout; sprt. Prmt. Reqd for spcl. Inspctr. Apprvl, co for new tenant spaces, & any mech, elec, plumb & firesupp work.
Date:  August 17, 2015

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: October 17, 2016 | Permit id: 624739
2015/08/1709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
Use increase in total nmber of dwelling units in madison house to 265 units in an existing structures with other previously approved uses.
Date:  July 6, 2015

Client: Post Presidential Propert | Permit type: Use permit | Permit status: Completed | Completion date: May 5, 2017 | Permit id: 621818
2015/07/0609539 City Ave Philadelphia Pa 191312905
SCORE
99
Rehabilitation of pool area including a new storm house drain to an infiltration basin with an outflow structure that ties into and onsite private sewer and domestic water supply piping for pool area, kitchens and pools - the installation will comply with the approved plans and the philadelphia plumbing code 2004
Date:  July 17, 2015
Contractor: Worth And Company

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 18, 2016 | Permit id: 622121
2015/07/1709939 City Ave Philadelphia Pa 191312905Worth And Company
SCORE
96
Temporary certificate of occupancy for 3rd and 5th floors
Date:  June 17, 2015

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: July 1, 2015 | Permit id: 617454
2015/06/1709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
Temporary certificate of occupancy
Date:  June 17, 2015

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: June 24, 2015 | Permit id: 617455
2015/06/1709639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
For alterations w. No change of occupancy classification within an exist. High-rise mixed-use residential building to include erection of ceiling assembly to exist. Structural framing, & installation of partitions for conference room, open office, & toilet room spaces; building is fully sprinklered. No change in height or area of existing exterior openings permitted herein.
Date:  April 22, 2013

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Expired | Completion date: October 18, 2016 | Permit id: 462602
2013/04/2209639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Replace (3)200amp 3 phase disconnect. Install 14 light fixtures and gfci receptacle in elevator room and install 4 light fixtures and gfci in the elevator pit (apt bldg)
Date:  October 14, 2014

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Expired | Completion date: June 1, 2015 | Permit id: 567863
2014/10/14010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
81
Removal of four 10,0 gallon underground storage tanks utillized for storage of #2 fuel oil (closure report to be given to inspector)
Date:  May 9, 2013

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Completed | Completion date: December 24, 2013 | Permit id: 470343
2013/05/0908139 City Ave Philadelphia Pa 191312905Coventry Environmental Inc
SCORE
96
Install hvac & ductwork as per plans throughout the first floor leasing office area of madison building as per plans.
Date:  October 22, 2013

Client: Post Presidential Propert | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 500541
2013/10/2209639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
96
For level iii alterations to the first thru sixth floor of an existing building. Alteration to include the erection of partition walls, provide accessibility improvements and finishes throughout. All work to be done per approved plans. Separate permits required for patios, mechanical, electrical, plumbing and fire supression work.
Date:  December 2, 2013

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: October 31, 2016 | Permit id: 505212
2013/12/0209639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Poolhouse - fitness center - fire alarm - (1)fire alarm panel, (12)smoke detectors, (2)duct detectors, (12)horn strobes, (7)pull stations & (6)heat detectors - the installation will comply with the 2008 nec and the nfpa 72
Date:  July 16, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2015 | Permit id: 617051
2015/07/16010039 City Ave Philadelphia Pa 191312905B H Holding Company
SCORE
100
Install 3- water heaters and 2- hot water storage tanks
Date:  August 28, 2015

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 23, 2016 | Permit id: 634209
2015/08/28010039 City Ave Philadelphia Pa 191312905Adelphia Plumbing And Htng Corp
SCORE
100
Install new 1 1 2 hw return lines 1st to 6th fl, rep defective 5" vertical stack vents, install waste & water lines to cust supp fixtures to bathrooms, kit & wash machine install mop recpts (multi units)
Date:  April 8, 2014
Contractor: Ferman Mc Gee

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2015 | Permit id: 522738
2014/04/08010039 City Ave Philadelphia Pa 191312905Ferman Mc Gee
SCORE
100
Install (7) new outlets in kitchen, kitchen light, dishwasher. In accordance with 2005 nec
Date:  July 16, 2008

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: October 7, 2008 | Permit id: 163451
2008/07/16010039 City Ave Philadelphia Pa 191312905Marc Stucatur Electrical
SCORE
100
Install 600amp service and site lighting and pool bonding per 2008 nec (apt bldg)
Date:  June 19, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: June 7, 2016 | Permit id: 613850
2015/06/19010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
73
(6)panel ants.(3)parabolic dish ants,equip cab assoc cables,etc for a broadband wireless comm sys. This equip will be mounted on a rooftop w other ex tcom equip. Elec equip incls 25kva 120 277-12 trns,emon demon sub mtr,100a disc fdrs,(3)fiber op cbls,(3)5 8"dc pwr cbles for the panel ant radios,(2)1 2"coax cbls for mw dish cat(1)1 2"coax for gps
Date:  March 2, 2010
Contractor: Donald R Lowe

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: April 5, 2010 | Permit id: 258875
2010/03/0207339 City Ave Philadelphia Pa 191312905Donald R Lowe
SCORE
100
Washington building boiler room - install (2)new domestic hot water heaters and (2)hot water storage tanks
Date:  June 12, 2014

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 10, 2015 | Permit id: 542539
2014/06/12010039 City Ave Philadelphia Pa 191312905Adelphia Plumbing And Htng Corp
SCORE
100
Install electical wiring throughout building: apartments and common area. Install tv & phone wiring for apartments 312 total per 2008 nec. Installation to comply with articles 210. 8, 210. 12, 210. 52(a)(b)(c) & 406. 11 of the 2008 nec.
Date:  October 3, 2014
Contractor: Vtech Electric Inc

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: November 10, 2015 | Permit id: 538059
2014/10/03010039 City Ave Philadelphia Pa 191312905Vtech Electric Inc
SCORE
100
Replace copper water supply piping, mains and domestic water pressure booster pump.. No connections to fixtures
Date:  August 28, 2015

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 9, 2016 | Permit id: 634212
2015/08/28010039 City Ave Philadelphia Pa 191312905Adelphia Plumbing And Htng Corp
SCORE
99
Install new branch ckts from newly install ckts breaker load center done by other & install new lighting luminaires supplied by owner as per nec 2008 west district
Date:  September 17, 2015

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: February 24, 2016 | Permit id: 631273
2015/09/1709939 City Ave Philadelphia Pa 191312905Apt Electrical Contracting Inc
SCORE
96
For interior demolition of non bearing non fire resistive rated partitions.
Date:  June 8, 2015

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Completed | Completion date: August 9, 2016 | Permit id: 615869
2015/06/0809639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Install new wiring for apartments switches, recepts, lights, smoke detectors in units, wiring in common areas, hallways & stairwells, cctv and phone lines in each unit as per 2008 nec (west district) no fire alarm
Date:  January 5, 2016
Contractor: Vtech Electric Inc

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Expired | Completion date: January 5, 2016 | Permit id: 616917
2016/01/05010039 City Ave Philadelphia Pa 191312905Vtech Electric Inc
SCORE
96
For the extension of a fire suppression system to the renovated leasing office. Fire suppression system to by installed as per nfpa 13.
Date:  January 8, 2014

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 513409
2014/01/0809639 City Ave Philadelphia Pa 191312905Accelerated Fire Protection In
Install three-three panel antennas on rooftop non-penetrating sled mount, three dish antennas, and one equipment cabinet to an existing penthouse wall.
Date:  February 5, 2010

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Expired | Completion date: January 26, 2016 | Permit id: 252777
2010/02/0509539 City Ave Philadelphia Pa 191312905
SCORE
100
Install bathroom light gfi, and switch, install 4 other outlets, per 2005 nec (west dist)
Date:  February 12, 2008

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: November 2, 2010 | Permit id: 132261
2008/02/12010039 City Ave Philadelphia Pa 191312905Marc Stucatur Electrical
SCORE
88
Upgrade of wiring to #6, and breaker from amp to amp.... In accordance with 2008 nec
Date:  December 5, 2012

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: February 7, 2013 | Permit id: 440640
2012/12/0508839 City Ave Philadelphia Pa 191312905Hunter Electric Llc
SCORE
96
Interior demolition on the first floor of the madison house. 15 square feet, interior demolition of non load bearing walls and ceilings only. No other work allowed under this permit. Separate permits required for renovation. No structural changes. Must maintain all code required fire rating on wall and floor ceiling assemblies. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts.
Date:  January 22, 2013

Client: Post Presidential Propert | Permit type: Demolition permit | Permit status: Expired | Completion date: September 16, 2013 | Permit id: 449494
2013/01/2209639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Install nfpa 13 sprinkler system in existing bldg. Connections to existing standpipe. Servicing residential bldg or that portion thereof. Feed main 6" code design pro: barry strittmatter,pe.
Date:  September 8, 2014

Client: Post Presidential Propert | Permit type: Suppression permit | Permit status: Completed | Completion date: January 7, 2016 | Permit id: 546934
2014/09/08010039 City Ave Philadelphia Pa 191312905B. M. Consulting Services Inc
SCORE
100
Install new substation with 10 kva transformer and 15kv 600a primary switch, 4000a sentron busway, 11-800a dp panel board, hp panelboards, ep panelboards, 250kv generac generator, 400a automatic tranfer switches, recon existing fp new peco switchegear nema 2
Date:  December 3, 2014

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: September 5, 2015 | Permit id: 552807
2014/12/03010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
96
Demo of a swimming pool (provision shall be made to prevent the accumulation of water or damage to any foundations on the premises or the adjoining property).
Date:  October 3, 2014

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: January 21, 2015 | Permit id: 566036
2014/10/0309639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
Install switchgear, 15kv cables & terminate. See plans for ap#552807.
Date:  November 28, 2014

Client: Post Presidential Propert | Permit type: Electrical permit | Permit status: Completed | Completion date: November 1, 2016 | Permit id: 576790
2014/11/28010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
95
Extension of permit # 349999 pursuant to pa act 46. This extension to expire on july 2, 2016 unless extended by other portions of the philadelphia code. Contact district office to institute the required inspections.
Date:  October 11, 2012

Client: Post Presidential Propert | Permit type: Administrative permit | Permit status: Completed | Completion date: August 9, 2016 | Permit id: 432117
2012/10/1109539 City Ave Philadelphia Pa 191312905Westower Communications Inc
SCORE
100
Replace toilet & lav. Remove bathtub and convert to stall shower
Date:  February 5, 2008
Contractor: Alfred Rossi Sr

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 20, 2008 | Permit id: 130451
2008/02/05010039 City Ave Philadelphia Pa 191312905Alfred Rossi Sr
SCORE
96
For the replacement of existing pool to create three separate pools with existing foundation as shown per approved plans. Alterations to include an accessible lift in to each pool as shown per site plan. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Separate permits required for all other work.
Date:  January 8, 2015

Client: Post Presidential Propert | Permit type: Alteration permit | Permit status: Completed | Completion date: February 18, 2016 | Permit id: 579880
2015/01/0809639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
5 fixtures with piping as per plans
Date:  August 12, 2014
Contractor: Ferman Mc Gee

Client: Post Presidential Propert | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 11, 2016 | Permit id: 550466
2014/08/12010039 City Ave Philadelphia Pa 191312905Ferman Mc Gee
SCORE
100
Install new substation with 1-1000 1333kva transformer, 1-124 155 kva generator & 15kva sws,(111)1200a dp pnl boards,install hp pnl boards,ep pnl boards,400a auto transfer sws,reconnect the exist fa pump,new 4000a sentron busway,demo and remove exist service per 2008 nec (apt bldg)
Date:  May 3, 2016

Client: Post Presidential Property Owner Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: May 3, 2016 | Permit id: 670035
2016/05/03010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
96
Temporary certificate of occupancy for the 9th, 10th, 11th and 12th floors
Date:  January 25, 2016

Client: Post Presidential Property Owner Llc | Permit type: Administrative permit | Permit status: Completed | Completion date: May 28, 2016 | Permit id: 665743
2016/01/2509639 City Ave Philadelphia Pa 191312905Post General Contracting Llc
SCORE
100
For the installation of new sprinklers throughout building part of an existing fire suppression system design per nfpa 13 standard as per plans.
Date:  September 8, 2016

Client: Post Presidential Property Owner Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 711379
2016/09/08010039 City Ave Philadelphia Pa 191312905B. M. Consulting Services Inc
SCORE
100
Install new substation w 1oookvs transformers and 15,11-1200a dp panelboards,all hp panelboards,ep panelboards,250kv generac generator,400a auto transfer sws,reconnect the existing fire pump,install new 250 and 4000a sentron busway,demo exist service to jefferon bldg per 2008 nec (apt bldg)
Date:  February 16, 2016

Client: Post Presidential Property Owner Llc | Permit type: Electrical permit | Permit status: Expired | Completion date: February 16, 2016 | Permit id: 658289
2016/02/16010039 City Ave Philadelphia Pa 191312905Major Electric Systems Inc
SCORE
100
Alteration: interior plumbing of a 12-story (apartment complex) with (330) dwelling units and accessory space. The installation will comply with the philadelphia plumbing code, 2004. Fuel gas piping and equipment are not part of this permit. A mechanical permit is required for this work.
Date:  August 4, 2016
Contractor: Ferman Mc Gee

Client: Post Presidential Property Owner Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 690044
2016/08/04010039 City Ave Philadelphia Pa 191312905Ferman Mc Gee
SCORE
100
Install 1- fire panel w voice evacuation. 2- amplifiers, 3-power supplies. Smoke detectors, 538 speakers, 114 speaker strobes, 37 modules for sprinkler, 27 pull stations, 8 relays as per nfpa72 (west district)
Date:  May 18, 2016

Client: Post Presidential Property Owner Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: August 14, 2017 | Permit id: 684870
2016/05/18010039 City Ave Philadelphia Pa 191312905B H Holding Company
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.