Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 12 no. Of inverters: 1 total system size in kilowatts: 2. 9 backup batteries:8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 1 16 12: plan change; see c of a... Vmt Date: October 12, 2012 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: January 25, 2013 | Permit id: Pds2012-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules 12 no. Of inverters 1 total system size in kilowatts 2. 9 backup batteries 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 1/16/12 plan change; see c of a... Vmt Date: October 12, 2012 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 25, 2013 | Permit id: Pds2012-1031-20 | |||||
SCORE 86 Roof mount residential solar pv for existing sfd no. Of modules 12 no. Of inverters 1 total system size in kilowatts 2. 9 backup batteries 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 1 16 12 plan change; see c of a... Vmt Date: October 12, 2012 Contractor: That Solar Guy Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 25, 2013 | Permit id: Pds2012-1031-20 | |||||
SCORE 95 14 re-roof (e) if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingle proposed roofing material comp shingle manufacturer owens corning brand and model duration cool color (if cool roof required) brown tan built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: September 12, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: January 22, 2013 Permit status: Pass | Permit id: Pds2012-1031-20 | |||||
SCORE 86 Roof mount residential solar pv for existing sfd no. Of modules: 12 no. Of inverters: 1 total system size in kilowatts: 2. 9 backup batteries:8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 1 16 12: plan change; see c of a... Vmt Date: October 12, 2012 Contractor: That Solar Guy Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 102-580-33-00 | |||||
SCORE 95 14 re-roof (e) if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingle proposed roofing material comp shingle manufacturer owens corning brand and model duration cool color (if cool roof required) brown tan built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Completed | Permit id: Pds2017-Resalt- | Parcel: 1025803300 |