Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 04-11-100 | Parcel: 045841014000 | |||||
Permit id: 05-03-312 | Parcel: 001010001000 | |||||
SCORE 89 Install 1" water meter; new sfd w fire sprinklers, bridgeway lakes 1 phase 1a. Temporary water paid for six months from issuance date. Permit id: 04-1407 | |||||
Install 8x16 boat dock attached to wall. Dock shall be located a minimum of 5 from each side property line. Hardware and attachments shall be as shown on approved plans. Use merco marine attachment plates or approved equal, and 7. 5" x 1 2" galvanized threaded rods fastened with fastenal unitex pro-poxy 3 fast epoxy. Call the inspection line (617-4692) prior to starting work and once you are finished, to final this permit. Permit id: 06-0572 | Parcel: 045841014000 |