Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install (1) pole, install 43 ft of wire at 3779 ely pl se, west of 37th pl se, as indicated on attached prints. Wr# 3478395 - kdantzler - dac Client: Pepco Holdings Inc | Permit type: Over head work; pole | Permit id: Pa111245 | |||||
SCORE 93 The proposed site improvements include construction of new three baseball fields, two buildings, concrete sidewalks, bleachers, paved access road, paved parking, spacial pavement, and associated utilities. The proposed baseball fields will be artificial turf fields with under-drainage system. Water quality treatment for the buildings and paved surfaces will be provided using three bioretentions facilities. The required water quantity storage will be met using the underdrainage/gravel system below the artificial turf fields. Runoff from the site will be collected by onsite storm drainage system and will be directed out form site to the public storm drainage system along ely place s. E. (3-9" cip, 1/1/1949). Domestic and fire water line for the proposed buildings will be connected to existing 8" water (cip, 5/18/1949) along ely place s. E. Sewer system from proposed buildings will be connected to existing 10" sewer (tcp, 1/1/1946) along ely place s. E. Proposed erosion and sediment control Client: Washington Nationals Youth Baseball Washington Nationals Youth Baseball | Permit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: March 13, 2014 | |||||
SCORE 95 Install (1) pole, install 43 ft of wire at 3779 ely pl se, west of 37th pl se, as indicated on attached prints. Wr# 3478395 - kdantzler - dac Permit type: Over head work; pole installation (single or first one), over head work; string electrical wire | Permit status: Permit expired | Expiration date: January 11, 2016 | Permit id: Pa111245 | |||||
SCORE 93 The proposed site improvements include construction of new three baseball fields, two buildings, concrete sidewalks, bleachers, paved access road, paved parking, spacial pavement, and associated utilities. The proposed baseball fields will be artificial turf fields with under-drainage system. Water quality treatment for the buildings and paved surfaces will be provided using three bioretentions facilities. The required water quantity storage will be met using the underdrainage gravel system below the artificial turf fields. Runoff from the site will be collected by onsite storm drainage system and will be directed out form site to the public storm drainage system along ely place s. E. (3-9" cip, 1 1 1949). Domestic and fire water line for the proposed buildings will be connected to existing 8" water (cip, 5 18 1949) along ely place s. E. Sewer system from proposed buildings will be connected to existing 10" sewer (tcp, 1 1 1946) along ely place s. E. Proposed erosion and sediment control Client: Washington Nationals Youth Baseball Washington Nationals Youth Baseball | Permit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: March 13, 2014 | |||||
SCORE 89 Construction staging area Permit status: Expired | Expiration date: January 31, 2014 | Permit id: Pa10123883 | |||||
SCORE 89 Construction staging area Permit status: Withdrawn | Expiration date: February 5, 2014 | Permit id: 0 | |||||
SCORE 93 Excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; storm lateral conn over 4" (trench), excavation; water lateral conn over 2" pipe (trench) Permit status: 3 | Expiration date: March 13, 2014 | Permit id: 0 | |||||
SCORE 55 Mobile crane work zone Permit status: Resubmit | Expiration date: June 14, 2017 | Permit id: 0 | |||||
SCORE 89 The proposed site improvements include construction of new three baseball fields, two buildings, concrete sidewalks, bleachers, paved access road, paved parking, spacial pavement, and associated utilities. The proposed baseball fields will be artificial turf fields with under-drainage system. Water quality treatment for the buildings and paved surfaces will be provided using three bioretentions facilities. The required water quantity storage will be met using the underdrainage gravel system below the artificial turf fields. Runoff from the site will be collected by onsite storm drainage system and will be directed out form site to the public storm drainage system along ely place s. E. (3-9" cip, 1 1 1949). Domestic and fire water line for the proposed buildings will be connected to existing 8" water (cip, 5 18 1949) along ely place s. E. Sewer system from proposed buildings will be connected to existing 10" sewer (tcp, 1 1 1946) along ely place s. E. Proposed erosion and sediment control Permit status: Cancel/withdrawn | Expiration date: March 13, 2014 | Permit id: 0 | |||||
SCORE 89 Construction staging area Permit status: Withdrawn | Expiration date: February 5, 2014 | Permit id: 0 | |||||
SCORE 55 Mobile crane work zone Permit status: Resubmit | Expiration date: June 14, 2017 | Permit id: 0 | |||||
SCORE 93 Excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer lateral connection over 4" pipe (trench), excavation; storm lateral conn over 4" (trench), excavation; water lateral conn over 2" pipe (trench) Permit status: 3 | Expiration date: March 13, 2014 | Permit id: 0 | |||||
SCORE 95 Install (1) pole, install 43 ft of wire at 3779 ely pl se, west of 37th pl se, as indicated on attached prints. Wr# 3478395 - kdantzler - dac Permit status: Permit expired | Expiration date: January 11, 2016 | Permit id: Pa111245 | |||||
SCORE 89 Construction staging area Permit status: Withdrawn | Expiration date: February 5, 2014 | Permit id: 0 | |||||
SCORE 55 Mobile crane work zone Permit status: Resubmit | Expiration date: June 14, 2017 | Permit id: 0 | |||||
SCORE 89 The proposed site improvements include construction of new three baseball fields, two buildings, concrete sidewalks, bleachers, paved access road, paved parking, spacial pavement, and associated utilities. The proposed baseball fields will be artificial turf fields with under-drainage system. Water quality treatment for the buildings and paved surfaces will be provided using three bioretentions facilities. The required water quantity storage will be met using the underdrainage gravel system below the artificial turf fields. Runoff from the site will be collected by onsite storm drainage system and will be directed out form site to the public storm drainage system along ely place s. E. (3-9" cip, 1 1 1949). Domestic and fire water line for the proposed buildings will be connected to existing 8" water (cip, 5 18 1949) along ely place s. E. Sewer system from proposed buildings will be connected to existing 10" sewer (tcp, 1 1 1946) along ely place s. E. Proposed erosion and sediment control Permit status: Cancel/withdrawn | Expiration date: March 13, 2014 | Permit id: 0 | |||||
SCORE 89 Construction staging area Permit status: Permit expired | Expiration date: August 9, 2013 | Permit id: Pa10085828 | |||||
SCORE 89 Construction staging area Permit status: Withdrawn | Expiration date: February 5, 2014 | Permit id: 0 | |||||
SCORE 89 Construction staging area Permit status: Permit expired | Expiration date: March 14, 2014 | Permit id: Pa10123883-R1 | |||||
SCORE 55 Mobile crane work zone Permit status: Resubmit | Expiration date: June 14, 2017 | Permit id: 0 |