Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Carrier: old town trolley and citysights dc 3609 woodley road nw - cathedral (along woodley road) stop is located on right curbline on wisconsin avenue nw after cathedral ave nw and right before south blvd. Existing pole has speed limit, tow away, and old trolley town signs. Date: December 3, 2014 Client: Barry Luden | Permit type: Bus stop service; sh | |||||
Scope of work: new phase (2) landscape plan in the parking area between sidewalk and face of building at 3609 woodley road nw facing wisconsin ave. To include four (4) trees (non-street) and twenty five (25) bushes/hedges. Phase (1) landscape permitted in 2009 under pa44258. 1. All scope of work must be done as per d. C. Standards and specifications. Date: December 5, 2011 Client: Protestant Episcopal Cathedral Foundation | Permit type: Landscaping; hedge to 36" tall, landscaping; tree planting | Permit status: Approved (pending payment | Expiration date: November 21, 2012 | |||||
Scope of work: new phase (2) landscape plan in the parking area between sidewalk and face of building at 3609 woodley road nw facing wisconsin ave. To include four (4) trees (non-street) and twenty five (25) bushes/hedges. Phase (1) landscape permitted in 2009 under pa44258. 1. All scope of work must be done as per d. C. Standards and specifications. Date: April 8, 2011 Client: Protestant Episcopal Cathedral Foundation | Permit type: Landscaping; hedge to 36" tall, landscaping; tree planting | Permit status: Permit expired | Expiration date: November 22, 2011 | Permit id: Pa61362 | |||||
SCORE 99 Scope of work: new phase (2) landscape plan in the parking area between sidewalk and face of building at 3609 woodley road nw facing wisconsin ave. To include four (4) trees (non-street) and twenty five (25) bushes hedges. Phase (1) landscape permitted in 2009 under pa44258. 1. All scope of work must be done as per d. C. Standards and specifications. Date: December 5, 2011 Contractor: Forrester Construction Client: Protestant Episcopal Cathedral Foundation | Permit type: Landscaping; hedge to 36" tall, landscaping; tree planting | Permit status: Cancel/withdrawn | Expiration date: November 21, 2012 | |||||
SCORE 89 Carrier: old town trolley and citysights dc 3609 woodley road nw - cathedral (along woodley road) stop is located on right curbline on wisconsin avenue nw after cathedral ave nw and right before south blvd. Existing pole has speed limit, tow away, and old trolley town signs. Date: December 3, 2014 Contractor: Eric Holmes Client: Barry Luden | Permit type: Bus stop service; shuttle (on existing pole) | Permit status: Cancel/withdrawn | Expiration date: October 2, 2015 | |||||
SCORE 89 Bus stop service; shuttle (on existing pole) Contractor: Eric Holmes Permit status: 3 | Expiration date: October 2, 2015 | Permit id: 0 | |||||
SCORE 59 Construction staging area Date: November 29, 2011 Contractor: Protestant Episcopal Cathedral Foundation Permit status: Expired | Expiration date: April 24, 2012 | Permit id: Pa10043183 | |||||
SCORE 59 Construction staging area Date: May 27, 2011 Contractor: Protestant Episcopal Cathedral Foundation Permit status: Expired | Expiration date: October 27, 2011 | Permit id: Pa10024193 | |||||
SCORE 99 Landscaping; hedge to 36" tall, landscaping; tree planting Contractor: Forrester Construction Permit status: 3 | Expiration date: November 21, 2012 | Permit id: 0 | |||||
SCORE 78 Construction staging area Contractor: National Cathedral School Pecf Permit status: Notpaid | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 89 Carrier: old town trolley and citysights dc 3609 woodley road nw - cathedral (along woodley road) stop is located on right curbline on wisconsin avenue nw after cathedral ave nw and right before south blvd. Existing pole has speed limit, tow away, and old trolley town signs. Contractor: Eric Holmes Permit status: Cancel/withdrawn | Expiration date: October 2, 2015 | Permit id: 0 | |||||
SCORE 78 Construction staging area Contractor: National Cathedral School Pecf Permit status: Not paid | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 99 Landscaping; hedge to 36" tall, landscaping; tree planting Contractor: Forrester Construction Permit status: 3 | Expiration date: November 21, 2012 | Permit id: 0 | |||||
SCORE 99 Scope of work: new phase (2) landscape plan in the parking area between sidewalk and face of building at 3609 woodley road nw facing wisconsin ave. To include four (4) trees (non-street) and twenty five (25) bushes hedges. Phase (1) landscape permitted in 2009 under pa44258. 1. All scope of work must be done as per d. C. Standards and specifications. Date: April 8, 2011 Contractor: Forrester Construction Client: Protestant Episcopal Cathedral Foundation | Permit type: Landscaping; hedge to 36" tall, landscaping; tree planting | Permit status: Permit expired | Expiration date: November 22, 2011 | Permit id: Pa61362 | |||||
SCORE 89 Bus stop service; shuttle (on existing pole) Contractor: Eric Holmes Permit status: 3 | Expiration date: October 2, 2015 | Permit id: 0 | |||||
SCORE 62 Occupy sidewalk as work zone. Pedestrian detour in curb lane. Cross sidewalk to place dumpsters. Two sce and temporary construction fencing. Temporary relocation of bus stop. Restrict parking on woodley and wisconsin ave nw tree removal inm area between sidewalk and property line at corner of wisconsin and woodley. Restore all distrubed area to ddot standards new planting in parking area. Date: July 8, 2009 Contractor: National Cathedral School Permit type: Occupancy; sce(s), landscaping; tree planting, excavation; street lights/bus stop, paving; sidewalk | Permit status: Permit expired | Expiration date: December 22, 2009 | Permit id: Pa44258 | |||||
SCORE 99 Install 20lf new 12" water main with 6" fire and 3" domestic water service; install lining of 1 lf ft 8" sanitary sewer to 10" sewer main and 15lf 12" storm drain to existing manhole with 18" strom main; attached plans and condiions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before permanent restotation of public space at 202-645-7050 Date: October 6, 2009 Contractor: Magnolia Plumbing Client: Protestant Episcopalcathedralfoundation | Permit type: Occupancy; staging area(s), excavation; vault(s) lxw, excavation; water lateral connection to 2" (trench), excavation; water meter manhole (over 2" pipe) | Permit status: Permit expired | Expiration date: March 5, 2010 | Permit id: Pa50438 | |||||
SCORE 62 Occupy sidewalk as work zone. Pedestrian detour in curb lane. Cross sidewalk to place dumpsters. Two sce and temporary construction fencing. Temporary relocation of bus stop. Restrict parking on woodley and wisconsin ave nw tree removal inm area between sidewalk and property line at corner of wisconsin and woodley. Restore all distrubed area to ddot standards new planting in parking area. Note:renewal or permit(#pa44258), all scope of work remains the same as per approved tcp and previous permit issued. Date: January 12, 2010 Contractor: National Cathedral School Permit type: Occupancy; sce(s), landscaping; tree planting, excavation; street lights/bus stop, paving; sidewalk | Permit status: Permit expired | Expiration date: June 21, 2010 | Permit id: Pa44258-R1 | |||||
SCORE 78 Construction staging area Contractor: National Cathedral School Pecf Permit status: Notpaid | Expiration date: August 31, 2016 | Permit id: 0 | |||||
SCORE 89 Carrier: old town trolley and citysights dc 3609 woodley road nw - cathedral (along woodley road) stop is located on right curbline on wisconsin avenue nw after cathedral ave nw and right before south blvd. Existing pole has speed limit, tow away, and old trolley town signs. Contractor: Eric Holmes Permit status: Cancel/withdrawn | Expiration date: October 2, 2015 | Permit id: 0 | |||||
SCORE 78 Construction staging area Date: August 29, 2014 Contractor: National Cathedral School Pecf Permit status: Permit expired | Expiration date: January 25, 2015 | Permit id: Pa10150413 | |||||
SCORE 78 Construction staging area Date: March 18, 2015 Contractor: National Cathedral School Pecf Permit status: Permit expired | Expiration date: July 24, 2015 | Permit id: Pa10177180 | |||||
SCORE 78 Construction staging area Date: February 10, 2016 Contractor: National Cathedral School Pecf Permit status: Permit expired | Expiration date: July 18, 2016 | Permit id: Pa10197928-R1 | |||||
SCORE 75 Construction staging area Date: October 13, 2016 Contractor: Pecf National Cathedral School Permit status: Permit expired | Expiration date: November 30, 2016 | Permit id: Pa10347692 | |||||
SCORE 98 Mobile crane work zone Date: August 22, 2016 Contractor: United Rigging Permit status: Permit expired | Expiration date: August 27, 2016 | Permit id: Pa10331795 | |||||
SCORE 78 Construction staging area Contractor: National Cathedral School Pecf Permit status: Not paid | Expiration date: August 31, 2016 | Permit id: 0 |