Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Excavate and place 121 new telecom conduit from existing manhole to new pole location in alley way to serve square as required in the fttp overlay plan in "fios drawdown acct" Date: March 2, 2011 Contractor: Verizon Inc Permit type: Excavation; telecom ml conduits (trench), over head work; pole installation (single or first one) | Permit status: Cancel/withdrawn | Expiration date: June 6, 2011 | |||||
SCORE 88 Excavation; telecom ml conduits (trench), over head work; pole installation (single or first one) Contractor: Verizon Inc Permit status: 3 | Expiration date: June 6, 2011 | Permit id: 0 | |||||
SCORE 88 Excavation; telecom ml conduits (trench), over head work; pole installation (single or first one) Contractor: Verizon Inc Permit status: 3 | Expiration date: June 6, 2011 | Permit id: 0 |