Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Cancelled - work under 3028108 - seattle public utilities is proposing to construct an underground storage tunnel to reduce the amount of sewage and stormwater (combined sewage) that discharges to the lake washington ship canal. A component of the project is the west portal (where the tunnel boring machine will be launched and excavated material removed) and the tunnel effluent pump station (used to empty the tunnel following storms) including facilities for odor control and a standby generator. Contractor: City Of Sea Spu Engineer Svcs Applicant: Whittaker, Kelsey | Permit status: Cancelled | Current use: Commercial | Permit id: 3028125 | |||||
SCORE 95 Shoreline exemption to install h scada cabinet, 2-inch diameter phone and electrical conduits from scl pole to the cabinet and (2)-inch conduits from cabinet to the npdes manhole. Involves excavation of a 3 ft deep x 1. 5w x long trench. Dirt to be excavated is less than 15 cublic yards. Contractor: City Of Sea Spu Drain And Waste Applicant: Kimani, Paul | Permit type: Construction | Permit status: Initial information colle | Permit id: 6245613 |