Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 5. 7kw pv system consisting of (20) 285w modules and (1) 5200w inverter. Upgrade service from 125a to 200a. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: August 2, 2016 | Expiration date: June 7, 2017 | Current use: Single family / duplex | Permit id: 6539148 |