Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 12, 2016 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 16, 2016 | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 15, 2017 Permit type: Addn | Permit status: Completed | Completion date: August 2, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: December 15, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 12, 2016 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 15, 2017 Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2017-Resalt- |