Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 Installation of a partition wall down the center of an existing room to create two smaller rooms and create a small storage room. Exisitng light to be reoriented (stays on same whip) install several outlets. Client: Day Seventh | Applicant: Aberdeen Construction Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Religious assem | |||||
SCORE 84 Total tear-off & reroof of church, 1 squares of tpo membrane on a pitch represented as 1 12 and 4 12. Contractor has indicated that iso with r- will be used. Re-roof plan has been conducted with inspector booth. Mid-roof inspection required. Date: June 20, 2013 Contractor: Guarantee Exteriors Client: Mtn Rocky | Applicant: Guarantee Exteriors | Permit type: Roofing | Permit status: Cmp | Completion date: January 13, 2014 | Current use: Religious assem | |||||
SCORE 84 Total tear-off & reroof of church, 1 squares of tpo membrane on a pitch represented as 1 12 and 4 12. Contractor has indicated that iso with r- will be used. Re-roof plan has been conducted with inspector booth. Mid-roof inspection required. Client: Mtn Rocky | Permit type: Roofing | Permit status: Cmp | Completion date: January 13, 2014 | Current use: Religious assembly, existing | Permit id: Pmt2013-02866 | |||||
SCORE 91 Installation of a partition wall down the center of an existing room to create two smaller rooms and create a small storage room. Exisitng light to be reoriented (stays on same whip) install several outlets. Client: Day Seventh | Permit type: Building, electrical | Permit status: Iss | Current use: Religious assembly, remodel | Permit id: Pmt2012-04668 | |||||
Traffic control to bore from utility pole & attach to existing aerial crossing 4th, #29514 Date: October 28, 2015 Client: Mtn Rocky | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04761 | |||||
SCORE 97 Installation of a partition wall down the center of an existing room to create two smaller rooms and create a small storage room. Exisitng light to be reoriented (stays on same whip) install several outlets. Client: Day Seventh | Permit type: Building, electrical | Permit status: Iss | Current use: Religious assembly, remodel | Permit id: Pmt2012-04668 |