Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Low voltage work for renovation. 4 speakers, 2 cable, 2 phone do not process need to pay double fee awatson 01 16 2013 (working without a permit) Date: January 16, 2013 Contractor: Heck Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201300416 | |||||
SCORE 86 Changing out meter base from ovehead to undergound 2 amps paid reinspection fee for temporary power additiona days reinspection fee added to extend for the last days. Cannot be extended after this fee. Sjj 10-30-12 contractor received permission from l eller to extend for another days letter attached sjj 12-6-12 Date: August 6, 2012 Contractor: Heck Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201206339 | |||||
SCORE 100 Renovation of existing hvac- Date: July 27, 2012 Contractor: Reliable Heating And Air Permit type: Hvac | Permit status: Issued | Permit id: Bm-201202086 | |||||
SCORE 77 Renovation of existing hvac- Date: February 2, 2012 Contractor: Georgia Air Masters Heating And Air Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201200312 | |||||
Plan review Date: January 30, 2012 Permit status: Closed - approved | Permit id: Ba-201200426 | |||||
SCORE 86 Address will be permitted under two phases phase one permitted 3 1- branch circuits only re-model bathroom and hallway-do not process need work description 1-17-12 sym replacing 3 fixtures, replacing bath fan, replacing 4 sconces & 5 can lights. Date: January 17, 2012 Contractor: Heck Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201200365 | |||||
SCORE 71 Interior alterations renovations to bedroom & bathroom . Date: December 21, 2011 Contractor: Fitzgerald Construction Inc Permit type: Alteration | Permit status: Issued | Permit id: Bb-201105888 |