Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
The simplex 3 stop passenger elevator, has an avove ground, single cylinder 3 stage telescopic jack. The proportioning valves in the jack have failed. They are no longer in fabrication. Schindler will replace the existing jack with a new 3 stage telescopic above ground assembly. The new assembly is being manufactured by iti hydraulik. Drawing is attached. Est. Cost of work: 50,140. 00 Date: March 14, 2014 Client: Metropolitan Memorial Methodist Episc Church Trustees | Applicant: Schindler Elevator Corp | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1401124 | |||||
SCORE 95 The simplex 3 stop passenger elevator, has an avove ground, single cylinder 3 stage telescopic jack. The proportioning valves in the jack have failed. They are no longer in fabrication. Schindler will replace the existing jack with a new 3 stage telescopic above ground assembly. The new assembly is being manufactured by iti hydraulik. Drawing is attached. Est. Cost of work: 50,140. 00 Date: March 14, 2014 Contractor: Schindler Elevator Corp Client: Metropolitan Memorial Methodist Episc Church Trustees | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1401124 |