Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 14000-02133: new storage room, remove approved exterior door and relocate to interior, (2) new gallon water heaters, and new gas line for cafeteria. (all cafeteria work under 14000-02238) ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00735 | |||||
SCORE 96 Nest building 3: 22,899 sf ti including new rooftop equipment and screening, changing (1) window to door exiting into parking area. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02133 | |||||
SCORE 96 Nest: building 3 interior non structural demo ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01932 | |||||
SCORE 100 Barnes & noble building 3: replace two (2) ac units and two (2) blower fans in the same location. Additional curbs are being added to square out the sleepers. Reroof entire structure (215 squares) with built up roof. Additional rooftop units are being removed and openings to be patched. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02225 | |||||
SCORE 100 Permit canceled by tenant building 3: barnes & noble: ti & u&o for a 30,955 sf tenant space on both floors of the building. Scope of work includes replacing exterior glazing and adding exterior exit doors. Ti for caffeteria to be under a separate permit. Scope of work includes new boiler on the roof Permit type: Project - building permit | Permit status: Void | Permit id: 13000-00998 | |||||
SCORE 99 Barnes & noble: building 3 interior non-structural demo permit (38,832 sf) for two floors ![]() ![]() Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00288 | |||||
SCORE 96 Nest building 3: tenant improvement and u&o for 15,0 sf project inlcudes conversion of ground office space in bldg 3 to kitchen and cafe for employees. New entrance at east, west and south side of building. U sent 8/4/15 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02238 | |||||
SCORE 96 14000-02238: remove high counter seats at ramen station and bowls/bun station ![]() ![]() Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00228 | |||||
SCORE 93 Barnes & noble: reroof building 3, 207 squares of fluid applied roof o/ (e) cap sheet Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00672 | |||||
SCORE 96 14000-02462: add louver length, relocated mep equipment with the same space includes (n) louver screen and associated details. ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00064 | |||||
SCORE 96 14-2255: added hand sink and change doors to double. ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00117 | |||||
SCORE 96 14000-02255: floor sink relocated and unistrut frame added over gas racks ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00082 | |||||
SCORE 96 14000-02255: door changes, equipment relocation, and (n) ceiling in room 52026 ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00081 | |||||
SCORE 96 14000-02255: (1) ams chamber ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00044 | |||||
SCORE 96 14000-02255: (6) rf shielded enclosures ![]() ![]() Permit status: Permit issued | Permit id: 15rev-00043 | |||||
SCORE 96 Nest equipment yard: (18 sf) includes modification of exterior loading dock area for equipment yard including new structural pad, installation of new mechanical, piping and electrical equipment, new wall, room and gate to screen yard. Permit status: Permit issued | Permit id: 14000-02462 | |||||
SCORE 96 Nest building 5: 1257 sf mep related work including removing optical table from co chamber room. Moving flammable liquids storage cabinet and flammable vapor sensor to co chamber room. Adding unistrut support frame for corrosion chamber gas dosing panel removing corrosive cabinet from fa room. Revising model of gas cabinets. Removing vacuum requirement for gas cabinets. Permit status: Permit issued | Permit id: 14000-02846 | |||||
SCORE 96 Interior non-structural demo ~25000sf. Ti under separate permit. ![]() ![]() Permit status: Permit issued | Permit id: 14000-02020 | |||||
SCORE 99 U&o & tenant improvement for "barnes & noble ". Includes new office reconfiguration for shipping and receiving area. (10 30 13: tco extended 6 months) u&o sent 4 25 14 ![]() ![]() Permit status: Permit issued | Permit id: 12000-02398 | |||||
SCORE 93 Barnes & noble: reroof building 5, 1 squares of fluid applied roof o (e) cap sheet Permit status: Permit issued | Permit id: 14000-00673 | |||||
SCORE 100 Barnes & noble building 5: replace two (2) ac units and four (4) blower fans in the same location. Additional curbs are being added to square out the sleepers. Reroof entire structure (1 squares) with built up roof. Additional rooftop units are being removed and openings to be patched. Permit status: Permit issued | Permit id: 13000-02226 | |||||
SCORE 99 12-2398: added scope of work to tenant improvement includes new offices electrical work. Valuation increased on original permit to 180k from 150k. All plan check fees collected under main permit. ![]() ![]() Permit status: Permit issued | Permit id: 13rev-00040 | |||||
SCORE 96 14000-02846: new equipment and anchorage for tools shown on initial set. ![]() ![]() Permit status: Completed | Permit id: 15rev-00328 | |||||
SCORE 93 Nest: new wall on 2nd floor to divide space in current bench lab workroom area. Modifying mech and elect associated with wall install. Relocation of (e) eyewash station Permit status: Permit issued | Permit id: 17000-00834 | |||||
SCORE 96 Nest building 5: 19108 sf ti to install new walls, ceilings, doors, plumbing fixtures and associated electrical and mechanical work. New rooftop hvac equipment. Scope includes electric and gas service upgrades and relocation. Use & occupancy. U&o sent 5 8 15 ![]() ![]() Permit status: Finaled | Permit id: 14000-02255 |