Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Permit is for masonry and stone work only for the erection of new facade on the front wall of an existing single family attached structure. Details as shown on the attached plan.(contractor to be decided) Date: June 26, 2017 Client: Chandelier Holdings Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 30, 2017 | Permit id: 784988 | |||||
Interior exterior renovation of an existing single family attached structure. Work includes new stairs in existing stair opening, windows and doors, roof shingles, paint existing wood fascia cornice (contractor to be decided) seperate permits required for electrical, mechanical and plumbing work Date: June 26, 2017 Client: Chandelier Holdings Llc | Permit type: Alteration permit | Permit status: Active | Completion date: October 27, 2017 | Permit id: 784987 | |||||
SCORE 100 3 toilets,3,bath tubs,3 lavs,1 ks and 1 ls (sfd)the installation will comply with the philadelphia plumbing code 2004 Date: July 10, 2017 Contractor: Richards Barrymore Client: Chandelier Holdings Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 30, 2017 | Permit id: 798378 | |||||
SCORE 100 Install new service entrance cable on exterior wall on pvc w service head. Install meter socket w meter head install proper bonding and groudning. Install 2 volt dryer line to 2nd fl via pvc conduit. Living rm. Install add receptacle. 15amp 120volt replace 1 stand breaker w arch fault breaker. Relocate 1 receptacles under counter area install new gfi protected receptacles per 2008 (sfd) Date: November 7, 2017 Contractor: Filippone Alfonso Jr Client: Chandelier Holdings Llc | Permit type: Electrical permit | Permit status: Active | Completion date: November 30, 2017 | Permit id: 830327 | |||||
SCORE 100 Install 200amp service panel with breakers as per 2008 nec (south district) Date: November 14, 2017 Contractor: Filippone Alfonso Jr Client: Chandelier Holdings Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 27, 2017 | Permit id: 832056 | |||||
SCORE 100 New wiring throughout 100amps service 120voh interconnected smoke detectors rg6 cable less than 300ft as per 2008 nec Date: June 12, 2017 Contractor: Abraham Buyag Client: Chandelier Holdings Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 14, 2017 | Permit id: 791050 | |||||
Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 5, 2017 Client: Chandelier Holdings Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: October 30, 2017 | Permit id: 779943 | |||||
SCORE 100 Replacing ductwork Date: June 14, 2017 Contractor: Ss Mechanicals Hvac Client: Chandelier Holdings Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 27, 2017 | Permit id: 791917 |