Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 159231 | |||||
Alteration permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 609545 | |||||
Alteration permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 178064 | |||||
Alteration permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 226121 | |||||
Alteration permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 178064 | |||||
Alteration permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 226121 | |||||
Alteration permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 609545 | |||||
Electrical permit Client: New Life Northeast Presby | Permit status: Completed | Permit id: 159231 | |||||
SCORE 100 Roof replacement - install a epdm mil fully adhered roofing system (commercial) Client: New Life Northeast Presby | Permit type: Alteration permit | Permit status: Completed | Completion date: May 31, 2016 | Permit id: 609545 | |||||
SCORE 100 1 control panel, 1 keypad, 1 smoke above panel, 6 strobes in bathrooms, 7 horn strobes, 6 manual pulls, 1 ansul relay, provide and connect emergency lights and exit signs as required to correct case #110693 (east district) Client: New Life Northeast Presby | Permit type: Electrical permit | Permit status: Completed | Completion date: March 15, 2011 | Permit id: 159231 | |||||
SCORE 81 Waterproof existing basement walls. Includes exterior excavation around perimeter, clean,patch and repair walls as needed. Apply rubberized waterproofing membrane. Client: New Life Northeast Presby | Permit type: Alteration permit | Permit status: Completed | Completion date: December 22, 2008 | Permit id: 178064 | |||||
SCORE 94 Stucco both side walls and rear wall of existing structure. No other work allowed under this permit. The erection of scaffolding at sidewalk requires streets department approval and additional (footway closure) permit. Client: New Life Northeast Presby | Permit type: Alteration permit | Permit status: Completed | Completion date: October 20, 2009 | Permit id: 226121 |