Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 90 Install temporary power 1200amp msb and 3 amp runs to existing msb at b-204 and b-205. New msb to be configured temp power. Date: September 17, 2015 Contractor: Redwood Electric Group Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-02457 | |||||
SCORE 86 11-3145: deferred submittal item # - design calculations for cold metal framing new lockheed martin building 245 Date: April 16, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00223 | |||||
SCORE 86 11000-03145: deferred submittal #8: engineering for glazed aluminum systems Date: May 1, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00263 | |||||
SCORE 65 Install 2 electric booster pump for domestic and industrial water associated electric. Date: July 15, 2014 Contractor: O C Mc Donald Co Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01818 | |||||
SCORE 86 11000-03145: deferred submittal #9 for exterior wood panel system Date: May 1, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00260 | |||||
SCORE 86 11000-03145: deferred submittal for cold metal framing Date: April 29, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00256 | |||||
SCORE 86 11000-03145: deferred submittal #6: exhaust fan ef-1, ef-2, ef-3 and ef-4 seismic isolator base slrs-c2 Date: May 1, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00262 | |||||
SCORE 86 11000-03145: deferred submittal #7 exhaust fan ef-8 seismic isolation base slrebp-b-1 and slrebp-c2 Date: May 1, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00261 | |||||
SCORE 86 11-3145: deferred submittal item #5 cooling tower condenser water cwp-1 and cwp-2, primary chilled water chwp-1 and chwp-2 and primary heating hot water phwp-1 and phwp-2 inertia base frame c1b-l Date: April 18, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00234 | |||||
SCORE 86 11-3145: deferred submittal item #4 cooling tower ct-1 and ct-2 base isolator wfsl base Date: April 18, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00233 | |||||
SCORE 86 11-3145: deferred submittal item #3 premanufactured stairs drawings and calculations Date: April 18, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00232 | |||||
SCORE 86 11-3145: deferred submittal item #2 for elevator hoistway framing Date: April 18, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00231 | |||||
SCORE 86 11-3145: deferred submittal item #1 for seismic anchorage of equipment and casework Date: April 17, 2014 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00227 | |||||
SCORE 86 11-3145 building 245: revise plumbing from meter to point of connection ~160ft. Date: December 16, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00778 | |||||
SCORE 93 Building 205: installation of equipment intro cleanroom (room 5e37). Scope of work includes installation of hepa filters, deionized water system, sump sump, and anchorage of equipment Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-02881 | |||||
SCORE 86 11-3145: add concrete flatwork and crosswalk to connect accessible parking stalls to accessible path leading to b245 entrance. Date: October 23, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00650 | |||||
SCORE 93 Tool and process equipment install and associated electrical, mechanical and plumbing. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01822 | |||||
SCORE 86 11-3145: (building 245) replace (e) process cooling water pipe support. (n) support is to match existing support in appearance except diagonal braces are relocated. Date: June 27, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00406 | |||||
SCORE 86 11-3145: building 245: enclose chemical storage area with fence and wall. Date: June 20, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00394 | |||||
SCORE 86 11000-03145: revise chain link fence around service yard to cement plaster wall Date: June 12, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00374 | |||||
SCORE 86 11000-03145: addition of a window at second floor Date: April 12, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00230 | |||||
SCORE 86 11000-03145: add four (4) additional stairs to the exterior plaza. Add area drains at the plaza. Date: December 18, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00701 | |||||
SCORE 86 11000-03145: deferred submittal of shop drawings for interior metal staircases Date: August 20, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00465 | |||||
SCORE 86 11-1074: revision includes foundation detail changes for exterior wall. (delta 1) revision inserted into original plans. Date: October 18, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00570 | |||||
SCORE 86 11-3145: revise grade beam at north retaining wall to step with existing grade. Add guardrail to retaining wall. Extend retaining wall. Date: October 18, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00569 | |||||
SCORE 86 11000-03145: revise chiller layout, new chillers are heavier and have been rotated 90-degrees so additional structural framing is required. Expand size of refrigeration machinery room within the (e) roof penthouse. No exterior changes. Date: July 11, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00388 | |||||
SCORE 86 11-3145: replace exsiting sewer and domestic water lines. Date: July 5, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00376 | |||||
SCORE 86 11-3146: ammr for h1 fire separation distance. (ammr to be issued in tandem with building permit) Date: June 28, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00364 | |||||
SCORE 86 11-3145: revision to add passenger elevator and revise size of service elevator 01. Pit foundation approved under 12rev-345 Date: June 26, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00355 | |||||
SCORE 86 (ref permit #11-3145) foundation reinforcement steel design only for new passenger elevator and revised foundation design for existing elevator pit. Elevator structual calculations and details are a deferred submittal. Date: June 22, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00345 | |||||
SCORE 86 New 1-hour rated exterior wall on west side of building 202a Date: May 10, 2012 Contractor: Lyncon Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01074 | |||||
SCORE 64 Lockheed martin, building 2: replace glass dishwashing machine with a new model (20 lb) Date: March 23, 2012 Contractor: H D Miller Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00661 | |||||
SCORE 86 11-3145: delta 9/ includes structural detail for existing design roof screen and exterior column to beam connection. Date: November 15, 2012 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00632 | |||||
SCORE 56 Install new drywell in landscape area for drainage at bldg #245 Date: August 1, 2016 Contractor: D And B Trenching Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-01902 | |||||
SCORE 86 11000-03145: add electrical substation and expand the size of the service yard. Concurrent arb approved 4/19/13 pe: waiting for elec plans to be returned from kutzmann before revision is issued /05/01/2013 ar plans are @ parvizs desk/ Date: March 14, 2013 Contractor: Lyncon Construction Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00157 | |||||
SCORE 93 Install jib crane at loading dock. Permit type: Project - building permit | Permit status: Finaled | Permit id: 16000-02882 |