Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6kw pv system on roof Date: July 19, 2016 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit issued | Expiration date: July 19, 2017 | Current use: Single family / duplex | Permit id: 6546778 | |||||
SCORE 96 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6kw pv system on roof Date: July 19, 2016 Contractor: Earl Childs Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2016 | Expiration date: July 19, 2017 | Current use: Single family / duplex | Permit id: 6546778 |